Original source · versioned page text
2019-04-18 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 18 APRIL 2019
ATTACHMENT 1
Page 30 of 33
ORDINARY MEETING AGENDA 18 APRIL 2019
ATTACHMENT 1
Table 3.1 Key issues raised in public and agency submissions
Operational * noise impacts associated with aircraft arriving to and departing from
aircraft noise the airport during the day time and night time
* increase in noise associated with the move in the proposed east-west
runway footprint
+ the need for compensation for newly affected dwellings and dwellings
that would experience an increase in noise
* inadequate noise mitigation measures
* aircraft noise impacts on community facilities
Land use * change in ANEF contours throughout planning documents
planning * move in the proposed east-west runway footprint and consequent
noise impacts on surrounding residents
* potential impacts on residential dwellings and associated community
safety in new Public Safety Areas
* potential impacts on road safety from aircraft landing and taking-off
over major roads
Social impacts + health impacts
* poor community consultation about the proposed east west runway
* lack of information about the project for people purchasing property in
the vicinity of the airport and impacts on property values
* potential overdevelopment of the Sunshine Coast
* potential impacts on Pacific Paradise State School
Economic impacts + methodology of the economic impact assessment—comparisons
between the preferred and non-preferred project options
* assumptions and data used in the economic impact assessment—for
example, flight predictions, change in CASA regulation
* lack of nsk analysis to underpin methodology
* devaluation of property in close proximity to the airport and under
flight paths
* flow-on economic development is not supported by the submitters
Natural hazards * flood impacts on property
* reduced capacity of the floodplain from runway fill
* adequacy of the flood modelling
* flood impacts exacerbated by sea level rise
* increased risk of extreme weather events
Water quality * tailwater discharge from the reclamation area
* water quality impacts in the Maroochy River and Marcoola Drain
* runoff from ASS
* groundwater impacts and monitoring
* management of the sand delivery pipeline
Sunshine Coast Airport Expansion project
-14- Coordinator-General’s evaluation report on the environmental impact statement
Page 30 of 33See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.