Original source · versioned page text
2019-04-18 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 18 APRIL 2019
Nature and Extent of Approved Use
3. Approval is for a Fitness Centre totalling a maximum floor area of 377m2 including
the amenity building.
Operating Hours and Class Times
4. The hours of operation and staff and patron numbers for the development must
comply with the following requirements:
a. The hours of operation for the approved use is limited to the hours between
5.00am and 9.00pm daily;
b. The number of people (patrons and staff) must not exceed 15 people at any
one time.
c. Group classes must have a minimum 15 minute break between the
conclusion of a class and the beginning of the next.
Noise
5. Noise nuisance beyond the boundary of the site shall not exceed the levels
specified in Table 1.
Table 1
NOISE LEVELS AT COMMERCIAL PLACE
PERIOD Noise level at a commercial place measured as the adjusted
maximum sound pressure level (Lamax, adj,T)
5am – 6pm Background noise level plus 10 dB(A)
6pm – 10pm Background noise level plus10 dB(A)
10pm – 7am Background noise level plus 8 dB(A)
Amenity
6. The development must be undertaken and operated in a manner that causes no
detrimental effect upon the amenity of the area by reason of the creation of
excessive noise, lighting nuisance or other emissions.
Advertising Signage
7. Any advertising sign or device must comply with Council's policies on advertising
devices.
Bicycle spaces and amenities
8. Facilities for 4 bicycle spaces must be provided for the approved use and be made
available at all times to patrons and staff at the commencement of the use. Indicate
their locations with an Operational Works application.
9. Shower and toilet facilities must be in accordance with the approved plans and
available at the commencement of the use.
Landscaping Works
10. The development site must be landscaped. The works must be undertaken in
accordance with an Operational Works approval and the Noosa Plan for that
specific area and must include in particular:
a. The extent of works shown on the approved Site Plan (D-11801-01A);
Page 5 of 33
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.