Skip to the record
Accept no substitutions.

Original source · versioned page text

SDA0915024218 Concurrence agency response With conditions

Attached to the e-mail MCU15/0085 Referral Agency Response - 44 Nandroya Rd Cooroy.

of 6

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                          SDA-0915-024218




Our reference:      SDA-0915-024218
Your reference:     MCU15/0085


Attachment 1—Conditions to be imposed


No.        Conditions                                                            Condition timing
Material change of use
Sustainable Planning Regulation 2009, Schedule 7, Table 3, Item 1 – State-controlled road—
Pursuant to section 255D of the Sustainable Planning Act 2009, the chief executive administering
the Act nominates the Director-General of Department of Transport and Main Roads to be the
assessing authority for the development to which this development approval relates for the
administration and enforcement of any matter relating to the following condition(s):
1.         The development must be carried out generally in accordance           At all times.
           with the following plan:
                     Site Plan, Fineline Residential Design, 2 December 2014,
                      Job No. 2014104, DWG No. 1 of 6.
2.              (a) Stormwater management of the development must                (a) At all times
                    ensure no worsening or actionable nuisance to the State-     (b) At all times
                    controlled road.                                             (c) Prior to the
                (b) Any works on the land must not:                                  commencement
                        i.    create any new discharge points for stormwater         of use.
                              runoff onto the State-controlled road;
                       ii.    interfere with and/or cause damage to the
                              existing stormwater drainage on the State-
                              controlled road;
                      iii.    surcharge any existing culvert or drain on the
                              State-controlled road;
                      iv.     reduce the quality of stormwater discharge onto
                              the State-controlled road.
                (c) Registered Professional Engineer of Queensland (RPEQ)
                    certification must be provided to the Department of
                    Transport and Main Roads’ North Coast Region by email
                    [email protected] (please quote TMR14-
                    012524), confirming that the development has been
                    designed and constructed in accordance with parts (a)
                    and (b) of this condition.




Department of Infrastructure, Local Government and Planning                                 Page 4
Log in to download the original file

SDA0915024218 Concurrence agency response With conditions.pdf · 365 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.