Construction Managenunt Plan

The following is to be incorporated into the
Construction Management Plan for the proposed
development,

Stripping

Vegetation stripping is to be minimal and limited
to the building area and associated external works
areas such as storage’s, carparks and access rontes.
Existing trees should be retained and protected
where possible.

Revegetation

Areas ta be revegetated should be topsoiled with
non-dispersive soil and planted with species
recommended by a qualified landscaper or the
Noosa Shire Council.

Drainage

Drainage works shouid include a lineal surface
contour catch drain upslope of the development
area discharging via pipe conduits to the jocal
stormwater system. All on site generated waste-
water and ranoff must be diverted to the
stormwater system via pipe systems, During roof
constraction, connection of roof discharges to the
permanent stormwater system must have taken
place early to avoid uncontrolled discharges onto
the slope during construction rainfall events,
Sewer

Heavy Vehicles must not be allowed to cross the
sewer easement. No construction materials should
be placed or stockpiled over the easement.
Storage of Materials

Materials should be stored on site in a manner
which does not impact on the stability of the site.
Horizontal set-downs and storage benches with

 

a

2 TE

k

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

a

 

oor

BS jee
op
a

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

J
Lo

 

 

 

 

 

 

\ semateria Hs stockpiled Jo
‘thin Smo eaing wa, ><” /- ent

 

 

 

 

=

 

,
‘Linear surface contonr/
Catch drain,

Discharge to divert to

 

Stormwater during construction,

BASEMENT FLOOR PLAN
Scale: 1: 200

sand filled bag retaining walls should be adopted.

Materials must not be stockpiled within a distance

of retaining wails equivalent to the height

retained. An exclusion zone of 3.0m must be
maintained for vehictes and machines from the
tops of retaining walls. Silt fences must be
instalied along the low side of all earth material
stockpiles and along the lower rear site boundary.

Order of Works

The following order of work activities must be

implemented.

© Installation of coniour drains and access
routes.

e Construction of material set-down and storage
areas as flat benches retained by sand filled
bags as necessary. Excavated materials to be
re-used on site must be stockpiled on flat
benches to maintain stability.

** Construction of the main retaining wail will
provide a level working platform for the front
portion of the structure.

@ Foundation construction.

s  Superstracture construction.

Reter also to

Mortision Geotechnical
Report dated 44.03.

 

&]

 

 

 

 

4

 

 

 

 

 

RR

orare. ur
Pavia anne.

Protest Areas
x Procedure/method

So
during construction.

GROUND FLOOR PLAN
SCALE; 1:200

Construction Management Plan
Daawin & Any Domarr

Project: Construction lanagemont Plan

LOT 1, BAYVIEW ROAD, NOOSA HE,
Client :

VICNICCO INVESTMENTS PTY
Domain Ramsey Group Py. Lid. “ETD.
26 Marlock Close, Buderim, Qid, 4556.

Ph : 07 $479 2992 Mobile : 0412 241 881

Ramsey Group,

 

 

   

Used in these records

About this file

File size
83 KB (small file)
File type
TIF

No other editions are linked here.

Original file

Log in to download the original file

0009774C.00A.tif · 83 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.