Council archive · source document
UPDATE TO INFRASTRUCTURE CHARGES RESOLUTION · ATTACHMENT 2 - NSC CHARGES RESOLUTION (No.8) 2024
22
Noosa Shire Council
Charges Resolution (No.8) 2024
Planning Regulation 2017 &
Current at: 1 July 2024 for the 2024-2025 Financial Year
The Noosa Plan 2020
Column 1 Column 2 Column 3 Column 4
PLANNING REGULATION 2017 COUNCIL COUNCIL
COUNCIL INCLUDED REDUCTIONS
SCHEDULE 16 Prescribed amount APPORTIONMENT CHARGE
Use
(As inserted by the “Planning (Prescribed Amounts) Amendment (per Charges breakup agreement of Amount
Basis %
Regulation 2024”) Prescribed amount) reduced
Other uses
1 Air service
2 Animal keeping Council has decided the following to be the most similar uses and appropriate rates:
3 Car park 1 Air service = Low-Medium impact industry
4 Crematorium 2 Animal keeping = Animal husbandry or Intensive animal husbandry as applicable
5 Extractive industry 3 Car park = Low impact industry
6 Major sport, recreation and 4 Crematorium = Funeral parlour
entertainment facility 5 Extractive industry = High impact industry
7 Motor sport facility The prescribed amount for another similar use listed in column 6 Major sport, recreation and entertainment facility = Indoor sport and recreation
8 Non-resident workforce 1 (other than in this row) that the local government or 7 Motor sport facility = Indoor sport and recreation
accommodation distributor-retailer decides to apply to the use 8 Non-resident workforce accommodation = Short-term accommodation
9 Outdoor sport and recreation 9 Outdoor sport and recreation = Indoor sport and recreation
10 Port service 10 Port service = Marine industry
11 Tourist attraction 11 Tourist attraction = Resort complex
12 Utility installation 12 Utility installation = Low impact industry
13 Any other use not listed in 13 Any other use not listed in column 1, including a use that is unknown = To be decided at the
column 1, including a use that is time of development approval
unknown
Notes:
(1) Development that is for provision of “trunk” infrastructure is exempt from and not subject to payment of infrastructure charges.
(2) Table 10.3 charges are specified at the base date and are subject to indexation in accordance with clause 9.5 Automatic increase provision of levied charge.
(3) Network Reductions:
a) The Stormwater component of the charge is excluded for development located outside the Coastal Area, Cooroy and Pomona PIA service catchments.
b) The Transport component of the charge is reduced by:
12% for development located outside the PIA service catchments; and
2% for development located inside the Boreen Point, Cooroibah and Kin Kin PIA service catchments.
(4) Reconfiguration of a lot for “Non-residential” development excludes the Stormwater network charge. Stormwater charges will only be calculated and applied
on subsequent development permits for material change of use or building work when the impervious area is able to be determined.
Council Resolution effective 15 August 2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original