Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

UPDATE TO INFRASTRUCTURE CHARGES RESOLUTION · ATTACHMENT 2 - NSC CHARGES RESOLUTION (No.8) 2024

of 29

Page text shows just the words. Original shows the document exactly as it was published.

                                                  8
                                         Noosa Shire Council
                                    Charges Resolution (No.8) 2024



2.5    Categorisation of uses to development classes

       (1)       A use under the local planning instrument as stated in column 1 of Table 10.3
                 (Schedule of Council adopted charges) is included within the Schedule 16 of the
                 Planning Regulation charge category stated in column 2 of Table 10.3 (Schedule
                 of Council adopted charges).

       (2)       The Council and the distributor-retailer are to allocate a use not otherwise stated
                 under subsection (1) to another similar use that the local government or
                 distributor-retailer decides to apply to the use (refer to Schedule 16 of the
                 Planning Regulation 2017).


  3.         Assumptions about future development
3.1    Purpose

       Section 3 states the assumptions about the type, scale, location and timing of future
       development.


3.2    Development assumptions about future development

                 (a)      the type, scale, location and timing of future development is identified in
                          the LGIP and/or local planning instrument

                 (b)      development inconsistent with the type, scale, location or timing
                          identified in the LGIP and/or local planning instrument will be subject to
                          assessment for conditions for extra trunk infrastructure costs in
                          accordance with Chapter 4 of the Planning Act 2016.


  4.         Priority infrastructure area
4.1    Purpose

       Section 4 states the priority infrastructure area for the Council.

4.2    Priority infrastructure area

       The priority infrastructure area is identified in the LGIP.




                               Council Resolution effective 15 August 2024
Log in to download the original file

ATTACHMENT 2 - NSC CHARGES RESOLUTION (No.8) 2024.pdf · 1.5 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.