Officer: Nadine Gorton
Direct Telephone: 07 53296215
Our Reference: MCU22/0154
Your Reference: 204099.T003
21 February 2023
AG22 Pty Ltd ATF Peregian Beach Shopping Centre Discretionary Trust
C/- NorthGroup Consulting
Unit 3/32 Billabong Street
STAFFORD QLD 4053
[email protected]
Dear Sir,
Decision Notice
Planning Act 2016
I refer to your application and advise that on 16 February 2023, Council decided to approve
the application, subject to conditions.
Details of the decision are as follows:
1. APPLICATION DETAILS
Application No: MCU22/0154
Street address: 214 David Low Way Peregian Beach
Real property description: Lot 74 P 9313
Planning Scheme: Noosa Plan 2020 (25 September 2020)
2. DECISION DETAILS
The following type of approval has been issued:
• Material Change of Use - Food and Drink Outlet, Office
3. CURRENCY PERIOD OF APPROVAL
The Currency Period for this development approval is stated in the conditions below.
4. ASSESSMENT MANAGER CONDITIONS
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied with
prior to the use commencing, and then compliance maintained at all times while the use
continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally comply with
the approved plans of development. The approved plans are listed in the following table
unless otherwise amended by these conditions.
PO Box 141 P. (07) 5329 6500 [email protected]
TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au
Page 1 of 8
Page 3
Plan No. Rev. Plan/Document Name Date
DA200-B B Proposed ground level plan prepared by DT Architect 08.02.2023
DA201-C C Proposed upper floor plan prepared by DT Architect 08.02.2023
DA202-A A Proposed section prepared by DT Architect 19.01.2023
DA203-B B Proposed elevations prepared by DT Architect 08.02.2023
DA204-B B Proposed elevations prepared by DT Architect 08.02.2023
DA400 - Finishes schedule prepared by DT Architect 19.01.2023
Building Appearance
3. Ground floor shopfront glazing along all frontages must be fully transparent to a
minimum of 65% of the street frontage to allow passive surveillance and encourage
social interaction and must be provided at full height (floor to ceiling).
4. Any security screens on the premises must consist of grille or translucent screens and
not solid shutters, screens or roller-doors.
5. All mechanical equipment and other service infrastructure located on the site must be:
a. located not less than 2 metres from a property boundary.
b. fully enclosed or screened such that they are not visible from the street frontages
nor adjoining properties. Roof materials must be non-reflective and designed with
colours and styles to minimise the visual impact of the development.
Weather Protection
6. Street awnings must be provided along the full length of the western, eastern and
southern frontages as shown on the approved plans. The awnings must have a minimum
width of 2.4 metres from the building line or the same unless otherwise approved and
must be designed to provide continuous solar and rain protection and promote all
weather activity.
7. All ground floor shopfront glazing must be protected against vandalism by the use of a
form of safety glass such as toughened or laminated glass.
8. The eastern balcony area above ground floor must not be enclosed by permanent
fixtures such as shutters, louvres, glass panelling or the like.
9. During operating hours, pedestrian areas and entrances/exits to all stairwells, lifts,
foyers and public toilets must be well lit with vandal resistant lighting and with intensities
to satisfy the requirements of Australian Standard AS1158 “Public Lighting Code”.
Lighting must be designed to reduce the contrast between shadows and well-lit areas.
10. The approved use must not operate outside the hours of 6am to 10pm seven days a
week, except for Food and Drink Outlet which may operate on Friday and Saturday until
12 midnight.
11. The requirements of this condition must be included in the Community Management
Statement for any body corporate for the subject site.
Operations
12. The operation of the food and drink outlet and associated activities must not result in
environmental nuisances such as noise, visual or odour impacts that unreasonably
diminish the amenity of the area or surrounding uses.
Page 2 of 8
Page 4
13. Any live music must be contained within an enclosed acoustically treated environment.
14. Acoustic live music (not reliant on electric or electronic equipment) must cease to
operate in outdoor spaces by:
a. 9:00pm Sunday – Thursday and public holidays
b. 10:00pm Friday and Saturday
15. Amplified live music must cease to operate in an outdoor space by 7:00pm seven days
per week.
Currency Period
16. This development approval lapses if the use has not happened by 16 February 2028
unless an application to extend the currency period is approved by Council.
Building Height
17. The maximum height of the development must not exceed RL17.36 as detailed on
proposed elevations DA203-A.
18. Certification must be submitted to Council from a Licensed Surveyor which certifies that
the building does not exceed the maximum height requirement of this Decision Notice.
Performance Bond
19. Security in the form of a cash bond or trading bank guarantee to the sum of $15,000
must be submitted to Council, to secure performance of all conditions of this approval,
prior to the issue of a Development Permit for Operational Works. The cash bond or
trading bank guarantee will be returned on performance of the conditions of approval
less any costs incurred by Council in respect of enforcing performance of this permit.
Council reserves the right to call upon the bond or guaranteed sum to effect compliance
with conditions.
Street Identification
20. The street address of the development must be clearly visible and discernible from the
primary frontage of the site by the provision of a street number and, where appropriate,
the building name.
DURING CONSTRUCTION
Retention of Existing Trees and Vegetation
21. All trees and surrounding vegetation identified on the detailed survey DWG 204099 004
DS rev 0 for retention must be protected in accordance with AS 4970, Protection of trees
on development sites.
22. A qualified person * must be engaged for the duration of the works to:
a. Oversee installation of all tree protection fencing prior to commencement of any
works onsite.
b. Supervise tree protection within the development site and frontages, prior to,
during and following construction in accordance with AS 4970, Protection of trees
on development sites.
c. Undertake a risk assessment of the ‘Pandanus tectorius’ that is extending within
the development footprint, and carry out amenity pruning in accordance with AS
4373, Pruning of amenity trees to protect the tree during the construction process.
*(Refer to Advisory Note)
Page 3 of 8
Page 5
Water & Sewer Connections
23. An underground connection to reticulated water and sewerage must be provided to the
development site in accordance with the standards and requirements of Northern SEQ
Distributor–Retailer Authority (Unitywater).
A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
(Unitywater) must be submitted to Council that certifies an underground connection to
reticulated water and sewerage has been provided to the development site.
Services
24. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
25. Certification must be submitted to Council from all relevant service providers (Energex,
NBN and Unitywater) which certifies that the development has met the requirements of
this Decision Notice and all applicable legislation at the time of construction.
Easements
26. Unless otherwise agreed in writing by the relevant service provider, any public or third-
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
All easements must be designed in accordance with the planning scheme and granted
at no cost to the Grantee. Where the Grantee is Council or a service authority, the
easement documentation must be in accordance with the Grantee’s standard easement
terms. Draft easement documentation must be submitted to Council for endorsement.
All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Damage to Services and Assets
27. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services
and assets must first be referred to the relevant service authority for approval.
DEMOLITION WORKS
Performance Bond
28. Security in the form of a cash bond or trading bank guarantee to the sum of $15,000
must be submitted to Council prior to the issue of a Development Permit for Building
Works for demolition, to secure the demolition conditions of this approval. The cash bond
or trading bank guarantee will be returned on performance of the demolition conditions
of this approval less any costs incurred by Council in respect of enforcing performance
of these demolition conditions. Council reserves the right to call upon the bond or
guaranteed sum to effect compliance with conditions.
Demolition must be undertaken in a manner that causes no detrimental effect upon the
amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-
borne hazards, atmospheric pollutants (including dust or odours) nuisance or any other
emissions in accordance with the nuisance provisions of the Environmental Protection
Act 1994.
Page 4 of 8
Page 6
Waste Management
29. A Waste Management Plan (demolition) must be submitted in accordance with Planning
Scheme Policy PSP9 - Waste Management and approved by Council’s Waste
Coordinator prior to issue of a development permit for Building Works for demolition,
removal, or relocation.
The purpose of the Waste Management Plan is to facilitate the segregation of waste for
the effective reuse and recycling of such materials. Segregated wastes attract
significantly reduced disposal fees at the landfill with some items free. Higher gate fees
are charged for mixed waste.
Waste storage areas must provide for adequate separation of all reusable, recyclable
and waste materials. These must be located so that they are convenient and safe to
use.
The Plan must contain the following information:
a. The areas for the storage and separation of waste shown on a site plan;
b. A waste management table as indicated below is to be completed showing how
waste material is to be segregated - recycled – reused or disposed; and
c. Table – Waste Management Table
Note * If a demolition contractor is undertaking works, then the Waste Management table
is to be completed by the demolition contractor.
Damage to infrastructure
30. Any damage to footpaths, street plantings, natural vegetation/trees kerb and channel,
bridges or roadways must be repaired or reinstated to at least pre-existing conditions.
Litter, erosion and sediment control
31. All waste materials must be removed from site. Litter, erosion and sediment control
Litter, erosion and sediment control measures must be installed and maintained until
soils are stabilised by turf, vegetation or sealed.
Note: it is an offence under the Environmental Protection Act 1994 to deposit or
potentially allow litter, waste, soil, or other contaminants to enter a waterway or storm
water drainage system (e.g. roadside gutter).
Asbestos
32. Removal of building materials containing asbestos must be undertaken by a licensed
asbestos removalist.
33. Asbestos removal work (Section 466) of the Work Health and Safety Regulation 2011
requires a licensed asbestos removalist to give notice to Workplace Health and Safety
Queensland (WHSQ) of licensed asbestos removal work at least five days before the
work commences. Notification must be made using Form 65: Notification of licensed
asbestos removal work, demolition work or emergency demolition.
34. All building materials containing asbestos products are wrapped and disposed of in
accordance with the Public Health Regulation 2006 and the Environmental Protection
Regulation 2008.
Note: Asbestos is a Regulated Waste. The Department of Environment & Science
licenses businesses that transport asbestos waste, and landfills that accept this waste.
35. All building materials containing asbestos, including asbestos cement sheeting or
roofing and lagging are removed from the building prior to demolition/relocation.
Page 5 of 8
Page 7
Plumbing and Drainage
36. It is a requirement of the ‘Standard Plumbing and Drainage Regulation 2019’ that at
demolition of a building, the existing sanitary drain upstream from the connection point
for a service provider’s sewerage system must be sealed watertight. This work is
deemed as notifiable Work and must be carried out by a suitably licenced plumber who
must submit an As Constructed plan and Form 4 (Notifiable Works Form) to the QBCC
(Queensland Building Construction Commission) within 10 days of completing the work.
37. A separate development permit for Operational Works must be submitted to and
approved by Council prior to the issue of an application for Building Approval. The
landscape plan is to detail the provision of:
• Permanent planters along the upper floor plan terrace area.
• Permanent planters along central lobby
• Internal green walls around internal stairwell
• Planter to support vine over pergola
• Feature tree and understorey planting of ground level.
All landscaping on site is to be maintained for the life of the development.
5. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form
part of the assessment manager conditions:
Activities within Road Reserve/Pathways/Car spaces
1. Safe vehicle and pedestrian access in the vicinity of the development mut be maintained
at all times. Should closures of footpath/roads/carspaces be necessary to carry out
construction works, a permit from Council’s Infrastructure Section must be obtained prior
to any works being undertaken.
2. Council encourages the implementation of sustainable and efficient energy
infrastructure to minimise energy consumption and the production of greenhouse gases.
In this regard, Council recommends the installation of solar panels for the development.
Infrastructure Charges
3. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges
Resolution” made pursuant to the planning legislation and regulations current at the time
of issue. For further information, please refer to https://www.noosa.qld.gov.au/planning-
development/development-tools-guidelines/infrastructure-charges
6. PROPERTY NOTES
Not applicable.
7. VARIATION APPROVAL DETAILS
Not applicable.
8. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit Required Subject of the required Development Permit
Development Permit for Operational Landscaping
Works
Development Permit for Building Works Demolition and Building
Page 6 of 8
Page 8
9. SUBMISSIONS
Not applicable.
10. RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from
the Planning Act 2016 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make
written representations to Council about the conditions contained within the development
approval. If Council agrees or agrees in part with the representations, a negotiated decision
notice will be issued. Only one negotiated decision notice may be given.
11. OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available on
line at www.noosa.qld.gov.au or at Council Offices.
Yours faithfully,
Patrick Murphy
Acting Manager, Development Assessment
Enc: Appeal Rights
Infrastructure Charge Notice
Approved Plans/Documents
Page 7 of 8
Page 9
Appeal Rights
PLANNING ACT 2016 & PLANNING REGULATION 2017
Chapter 6 Dispute resolution (3) The appellant or, for an appeal to a tribunal, the registrar must,
within the service period, give a copy of the notice of appeal to –
Part 1 Appeal rights
(a) the respondent for the appeal; and
229 Appeals to tribunal or P&E Court
(b) each co-respondent for the appeal; and
(1) Schedule 1 of the Planning Act 2016 states –
(c) for an appeal about a development application under schedule
(a) Matters that may be appealed to –
1, table 1, item 1 – each principal submitter for the
(i) either a tribunal or the P&E Court; or development application; and
(ii) only a tribunal; or (d) for and appeal about a change application under schedule 1,
table 1, item 2 – each principal submitter for the change
(iii) only the P&E Court; and
application; and
(b) The person-
(e) each person who may elect to become a co-respondent for the
(i) who may appeal a matter (the appellant); and appeal, other than an eligible submitter who is not a principal
submitter in an appeal under paragraph (c) or (d); and
(ii) who is a respondent in an appeal of the matter; and
(f) for an appeal to the P&E Court – the chief executive; and
(iii) who is a co-respondent in an appeal of the matter; and
(g) for an appeal to a tribunal under another Act – any other
(iv) who may elect to be a co-respondent in an appeal of the
person who the registrar considers appropriate.
matter.
(4) The service period is –
(2) An appellant may start an appeal within the appeal period.
(a) if a submitter or advice agency started the appeal in the P&E
(3) The appeal period is –
Court – 2 business days after the appeal has started; or
(a) for an appeal by a building advisory agency – 10 business
(b) otherwise – 10 business days after the appeal is started.
days after a decision notice for the decision is given to the
agency; or (5) A notice of appeal given to a person who may elect to be a co-
respondent must state the effect of subsection (6).
(b) for an appeal against a deemed refusal – at any time after the
deemed refusal happens; or (6) A person elects to be a co-respondent by filing a notice of election,
in the approved form, within 10 business days after the notice of
(c) for an appeal against a decision of the Minister, under chapter
appeal is given to the person.
7, part 4, to register premises or to renew the registration of
premises – 20 business days after a notice us published under 231 Other appeals
section 269(3)(a) or (4); or
(1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
(d) for an appeal against an infrastructure charges notice – 20 the Supreme Court decides a decision or other matter under this
business days after the infrastructure charges notice is given Act is affected by jurisdictional error, the decision or matter is non-
to the person; or appealable.
(e) for an appeal about a deemed approval of a development (2) The Judicial Review Act 1991, part 5 applies to the decision or
application for which a decision notice has not been given – matter to the extent it is affected by jurisdictional error.
30 business days after the applicant gives the deemed
(3) A person who, but for subsection (1) could have made an
approval notice to the assessment manager; or
application under the Judicial Review Act 1991 in relation to the
(f) for any other appeal – 20 business days after a notice of the decision or matter, may apply under part 4 of that Act for a
decision for the matter, including an enforcement notice, is statement of reasons in relation to the decision or matter.
given to the person.
(4) In this section –
Note – decision includes-
See the P&E Court Act for the court’s power to extend the appeal
(a) conduct engaged in for the purpose of making a decision; and
period.
(b) other conduct that relates to the making of a decision; and
(4) Each respondent and co-respondent for an appeal may be heard
in the appeal. (c) the making of a decision or failure to make a decision; and
(5) If an appeal is only about a referral agency’s response, the (d) a purported decision; and
assessment manager may apply to the tribunal or P&E Court to
(e) a deemed refusal.
withdraw from the appeal.
non-appealable, for a decision or matter, means the decision or
(6) To remove any doubt. It is declared that an appeal against an
matter-
infrastructure charges notice must not be about-
(a) is final and conclusive; and
(a) the adopted charge itself; or
(b) may not be challenged, appealed against, reviewed, quashed,
(b) for a decision about an offset or refund-
set aside or called into question in any other way under the
(i) the establishment cost of trunk infrastructure identified in Judicial Review Act 1991 or otherwise, whether by the
a LGIP; or Supreme Court, another court, a tribunal or another entity; and
(ii) the cost of infrastructure decided using the method (c) is not subject to any declaratory, injunctive or other order of
included in the local government’s charges resolution. the Supreme Court, another court, a tribunal or another entity
on any ground.
230 Notice of appeal
232 Rules of the P&E Court
(1) An appellant starts an appeal by lodging, with the registrar of the
tribunal or P&E Court, a notice of appeal that- (1) A person who is appealing to the P&E Court must comply with the
rules of the court that apply to the appeal.
(a) is in the approved form; and
(b) succinctly states the grounds of the appeal. (2) However, the P&E Court may hear and decide an appeal even if
the person has not complied with the rules of the P&E Court
(2) The notice of appeal must be accompanied by the required fee.
PO Box 141 P. (07) 5329 6500 [email protected]
TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au
Page 8 of 8
Page 10
DA204-B
1
ADJOINING SHOP
CP SP284446
26865
HOT WATER
802
610
1595 100 1665
SERVICE CORRIDOR NON-SLIP TILES
VOID OVER
1385
NON-SLIP TILES KITCHEN (TO FUTURE DETAIL)
SERVICES 1140
DAVID LOW WAY
350 950 515 1245
CLEANERS
BIN COLD
VILLAGE GREEN
1880
ROOM
RETAIL 1 ROOM
PWD 2680
FLOOR FINISH TO LATER DETAIL BAR (TO FUTURE DETAIL)
350 1650
NOTE:
OUTDOOR
10448
UP DINING
900
LIFT SUBJECT TO
FUTURE
FOOTPATH
STORE
PERMITS
1 NOTE: LOCATION OF
DA203-B 1 2 DA203-B
FOOD AND DRINK
2668
WALL MAY VARY
DA202-A
OUTLET
4451
RETAIL 2 LOBBY RESTAURANT
FLOOR FINISH TO LATER DETAIL
T1 FLOOR FINISH TO LATER DETAIL
(TO FUTURE DETAIL)
1650
UP
BAR BENCH
2891
610
600
GREENWALL
26954 PLANTER
350
350 5000 350 1650 3140 2891 2120 350 5090 350 4963 350
AWNING SHOWED DASHED NOTE:
OUTDOOR DINING SUBJECT TO
FUTURE FOOTPATH PERMITS
2
DA204-B 0 0.5 1.0 2.0 5.0m
PEREGIAN BEACH SHOPPING CENTRE
PROPOSED GROUND LEVEL PLAN
No. Description Date
REV. A PROPOSED UPPER FLOOR CHANGES 19-01-2023
DISCRETIONARY TRUST
REV. B ADDITION OF GREENWALL 08-02-2023
214 DAVID LOW WAY, PEREGIAN BEACH Project Number N/A
DA200-B
Email: [email protected]
Date 08/02/2023
Phone: 0412 254 395
Drawn by GRACE SHERWIN
Designed by DAVID TOOHEY SCALE: 1 : 100
Page 11
DA204-B
1
SCREEN
2440 26895 2560
REF.
POT PLANT
PRIVATE PWD UNISEX WC VOID
ROOM UNISEX + SHOWER
GLASS
LOUVRE SCREEN BALUSTRADE
4756
BOARDROOM SERVICES
ZONE FOOD AND
T1 KITCHEN
DRINK OUTLET
GRC PLANTERS
TERRACE
LIFT T1
350
KITCHEN
1 UP
DA203-B 1 ENTRY 2 DA203-B
DA202-A
LOBBY
4377
4378
OFFICE VOID
T1
LOUVRE SCREEN
PRIVATE
BATHROOM ROOM
600
POT PLANT
GRC PLANTERS
155
AWNINGS 345 AWNINGS
2
PLANTER GREENWALL DA204-B VINE CLEAR SHEET OVER PERGOLA 0 0.5 1.0 2.0 5.0m
PEREGIAN BEACH SHOPPING CENTRE
PROPOSED UPPER FLOOR PLAN
No. Description Date
REV. B PROPOSED UPPER FLOOR CHANGES 18-01-2023
DISCRETIONARY TRUST
REV. C ADDITION OF GREENWALL + PLANTERS 08-02-2023
214 DAVID LOW WAY, PEREGIAN BEACH Project Number N/A
DA201-C
Email: [email protected]
Date 08/02/2023
Phone: 0412 254 395
Drawn by GRACE SHERWIN
Designed by DAVID TOOHEY SCALE: 1 : 100
Page 12
BOUNDARY LINE
BOUNDARY LINE
LOUVRE SCREEN SKYLIGHT
SKYLIGHT
VOID
ROOF ROOF
410 1110 180
RL17.36 RL 17.36
410 1290
VOID
SCREEN VENT SCREEN VENT
W1 UPPER CEILING W1 UPPER CEILING
RL 15.56 1000 RL 15.56
1000 GRC PLANTER W2 W2
W2 W2
3400
620 8000
8000
W1
UPPER FLOOR W1 UPPER FLOOR
RL 12.6 RL 12.36
2500
W2 W2
BAR BENCH
2900
2975
W2 W2 W1
ACCOYA SHIPLAP
GROUND FLOOR CLADDING REFER TO
FINISHES SCHEDULE GROUND FLOOR
RL 9.36 RL 9.36
STEP
SHOPFRONT GLAZING SHOPFRONT GLAZING
(CLEAR ANODISED (CLEAR ANODISED
ALUMINIUM) ALUMINIUM)
PROPOSED WEST ELEVATION PROPOSED EAST ELEVATION
1 SCALE: 1 : 100
2 SCALE: 1 : 100
0 0.5 1.0 2.0 5.0m
PEREGIAN BEACH SHOPPING CENTRE
PROPOSED ELEVATIONS
No. Description Date
REV. A PROPOSED UPPER FLOOR CHANGES 19-01-2023
DISCRETIONARY TRUST
REV. B ADDITION OF GREENWALL + PLANTERS 08-02-2023
214 DAVID LOW WAY, PEREGIAN BEACH Project Number N/A
DA203-B
Email: [email protected]
Date 08/02/2023
Phone: 0412 254 395
Drawn by GRACE SHERWIN
Designed by DAVID TOOHEY SCALE: 1 : 100
Page 13
BOUNDARY LINE
BOUNDARY LINE
ROOF
RL 17.36
410 1110
SKYLIGHT
940
UPPER CEILING
410
EAVES EAVES RL 15.56
8000
CONCRETE BLOCK
UPPER FLOOR
RL 12.36
BOUNDARY WALL
AWNING AWNING
GROUND FLOOR
RL 9.36
PROPOSED NORTH ELEVATION
1 SCALE: 1 : 100
BOUNDARY LINE
BOUNDARY LINE
ROOF
RL 17.36
1290
2350
SKYLIGHT
SKYLIGHT
P1
UPPER CEILING
410
W1 W1
EAVES
EAVES RL 15.56
GRC PLANTERS
W2 W2 W2 W2 W2
3430
8000
UPPER FLOOR
AWNING WITH SIGNAGE
W1 P1 W1 AWNING WITH SIGNAGE
RL 12.36
P2
BAR BENCH
2880
W2 W2 W2 W2 W2 W2
GROUND FLOOR
SHOPFRONT GLAZING
GREENWALL SHOPFRONT GLAZING
RL 9.36
(CLEAR ANODISED ALUMINIUM)
PROPOSED SOUTH ELEVATION
(CLEAR ANODISED
ALUMINIUM)
2 SCALE: 1 : 100
0 0.5 1.0 2.0 5.0m
PEREGIAN BEACH SHOPPING CENTRE
PROPOSED ELEVATIONS
No. Description Date
REV. A PROPOSED UPPER FLOOR CHANGES 19-01-2023
DISCRETIONARY TRUST
REV. B ADDITION OF GREENWALL + PLANTERS 08-02-2023
214 DAVID LOW WAY, PEREGIAN BEACH Project Number N/A
DA204-B
Email: [email protected]
Date 08/02/2023
Phone: 0412 254 395
Drawn by GRACE SHERWIN
Designed by DAVID TOOHEY SCALE: 1 : 100
Used in these records
Existing development approval.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.