Existing development approval · MCU22/0154.01
Water & Sewer Connections
23. An underground connection to reticulated water and sewerage must be provided to the
development site in accordance with the standards and requirements of Northern SEQ
Distributor–Retailer Authority (Unitywater).
A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
(Unitywater) must be submitted to Council that certifies an underground connection to
reticulated water and sewerage has been provided to the development site.
Services
24. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
25. Certification must be submitted to Council from all relevant service providers (Energex,
NBN and Unitywater) which certifies that the development has met the requirements of
this Decision Notice and all applicable legislation at the time of construction.
Easements
26. Unless otherwise agreed in writing by the relevant service provider, any public or third-
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
All easements must be designed in accordance with the planning scheme and granted
at no cost to the Grantee. Where the Grantee is Council or a service authority, the
easement documentation must be in accordance with the Grantee’s standard easement
terms. Draft easement documentation must be submitted to Council for endorsement.
All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Damage to Services and Assets
27. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services
and assets must first be referred to the relevant service authority for approval.
DEMOLITION WORKS
Performance Bond
28. Security in the form of a cash bond or trading bank guarantee to the sum of $15,000
must be submitted to Council prior to the issue of a Development Permit for Building
Works for demolition, to secure the demolition conditions of this approval. The cash bond
or trading bank guarantee will be returned on performance of the demolition conditions
of this approval less any costs incurred by Council in respect of enforcing performance
of these demolition conditions. Council reserves the right to call upon the bond or
guaranteed sum to effect compliance with conditions.
Demolition must be undertaken in a manner that causes no detrimental effect upon the
amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-
borne hazards, atmospheric pollutants (including dust or odours) nuisance or any other
emissions in accordance with the nuisance provisions of the Environmental Protection
Act 1994.
Page 4 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Existing development approval.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.