Skip to the record
Search everything, all in one place.

Council archive · source document

Existing development approval · MCU22/0154.01

of 13

Text shows just the words. Original shows the document exactly as it was published.

      Plumbing and Drainage
36.   It is a requirement of the ‘Standard Plumbing and Drainage Regulation 2019’ that at
      demolition of a building, the existing sanitary drain upstream from the connection point
      for a service provider’s sewerage system must be sealed watertight. This work is
      deemed as notifiable Work and must be carried out by a suitably licenced plumber who
      must submit an As Constructed plan and Form 4 (Notifiable Works Form) to the QBCC
      (Queensland Building Construction Commission) within 10 days of completing the work.
37.   A separate development permit for Operational Works must be submitted to and
      approved by Council prior to the issue of an application for Building Approval. The
      landscape plan is to detail the provision of:
      •     Permanent planters along the upper floor plan terrace area.
      •     Permanent planters along central lobby
      •     Internal green walls around internal stairwell
      •     Planter to support vine over pergola
      •     Feature tree and understorey planting of ground level.
      All landscaping on site is to be maintained for the life of the development.
5.    ADVISORY NOTES

The following notes are included for guidance and information purposes only and do not form
part of the assessment manager conditions:
Activities within Road Reserve/Pathways/Car spaces
1.    Safe vehicle and pedestrian access in the vicinity of the development mut be maintained
      at all times. Should closures of footpath/roads/carspaces be necessary to carry out
      construction works, a permit from Council’s Infrastructure Section must be obtained prior
      to any works being undertaken.
2.    Council encourages the implementation of sustainable and efficient energy
      infrastructure to minimise energy consumption and the production of greenhouse gases.
      In this regard, Council recommends the installation of solar panels for the development.
Infrastructure Charges
3.    All developments and/or changes to existing developments may require payment of
      “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges
      Resolution” made pursuant to the planning legislation and regulations current at the time
      of issue. For further information, please refer to https://www.noosa.qld.gov.au/planning-
      development/development-tools-guidelines/infrastructure-charges
6.    PROPERTY NOTES

Not applicable.
7.    VARIATION APPROVAL DETAILS

Not applicable.
8.    FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit Required           Subject of the required Development Permit

 Development      Permit   for   Operational Landscaping
 Works

 Development Permit for Building Works         Demolition and Building




                                                                                      Page 6 of 8

Used in these records

About this file

File size
1.6 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Existing development approval.pdf · 1.6 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.