2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 1
The original of this document is very large (18.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Noosa Spit SEMP Final Report i
Executive Summary
Executive Summary
The Noosa Spit at Dog Beach has been identified as an erosion hot-spot, with narrowing of the man-made
peninsular presenting a risk of a future breakthrough. Primarily, this erosion is caused by natural migration of
the channel, driven by sand infilling of the river mouth, while boat traffic adjacent to the Dog Beach is a
secondary cause of bank erosion. Works completed in 2013 were successful in stabilising the western extent
of Dog Beach; however, the rate of shoreline recession in the middle section has since increased, prompting
the need for this investigation.
Avoiding a breakthrough at Noosa Spit is important for maintaining the multiple attributes that the community
currently values. The consequences of a breakthrough include:
• Reduced attenuation of the ocean tide and increases to peak high tide water levels in the lower Noosa
River. This reduces the freeboard for waterfront development and therefore increases the likelihood of
flooding driven by coastal and/or fluvial processes.
• Rapid and unpredictable morphological change following a breakthrough and further loss of coastal land
and open space that shelters existing development.
Within this projects, various shoreline erosion management options were considered for Dog Beach. A key
objective was to identify ways to reduce the risk of a breakthrough while maintaining or enhancing the
recreational, social and environmental values attributed to Dog Beach. The promoted management strategy
focuses on relocating sand from adjacent channels and shoals to replenish the Dog Beach shoreline. The
strategy seeks to provide protection from the risk of breakthrough by delivering a shoreline position equivalent
to the condition in 2013 with the following triggers for management action:
(1) The first trigger occurs when the recreational width at Dog Beach is lost. At this time beach nourishment
and the construction of ‘sand plugs’ to reduce the flow in the adjacent channel is to occur. These works
would be undertaken by a small cutter suction dredge, using a mobile pipeline to deliver the sand to the
placement locations. It is anticipated that the works would be repeated several times between now and
2040.
(2) The second trigger is represented by significant narrowing of The Spit width at Dog Beach (to ~20 m)
and signals that the shoreline replenishment and channel flow reduction strategy is not performing as
intended and/or the frequency of works is unsustainable. The notional 20 m width of land above the high
water mark represents the likely minimum development footprint required for land-based construction of
a seawall or similar shoreline protection structure.
The trigger-based approach is designed to avoid a seawall for as long as possible and only calls for
consideration of a seawall if the sand relocation works are unable to maintain the risk of a breakthrough at an
acceptable level. Ongoing resilience building actions, including revegetation and habitat management, are
expected to continue as part of routine maintenance.
The shoreline condition in 2019 suggests that the first trigger has been reached and therefore the shoreline
nourishment works proposed as part of the strategy could commence immediately.
G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\R.B23636.001.02.SEMP_final.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.