Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 1

of 109

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 Noosa Spit SEMP Final Report                                                                              79
 Shoreline Erosion Mitigation Options




4.3.2    Option 1b: sand plug at southern end of Dog Beach
         Figure 4-5 illustrates the model representation of the sand plug as the southern end of Dog Beach.
         Like Option 1a, it’s assumed a small cutter suction dredge and slurry pipeline would be used to
         relocate the sand from a nearby borrow area within the Noosa River estuary. Key features of the
         option include:

         • The sand plug is represented by adjusting the model bathymetry in the areas shown

         • The crest elevation of the sand plug is 0 mAHD (approximately mean sea level)

         • The estimated volume of sand needed to construct the plug is 17,000 m3 (additional volume would
           be required to nourish the shoreline).

         The impacts to peak tidal current figures show:

         • Very little change to peak flood current magnitude within the Dog Beach channel. Increases to
           current magnitude are predicted at the edges and over the crest of the sand plug. As described
           above for Option 1a, this suggests that the flood tide currents will gradually erode and smooth the
           constructed sand plug.

         • The pattern of impact to ebb tide currents is like Option 1a, with a significant reduction in
           magnitude at the Dog Beach channel and shoreline. Option 1a and 1b are similar in terms of the
           immediate benefit to Dog Beach erosion associated with ebb tide currents, but with less sand
           required to implement Option 1b.

         • An increase in ebb tide current magnitude through the central channel is observed, assumed to
           promote the development of a dominant ebb tide flow path through this area.

         • It is assumed that the sand plug would need to be maintained for the option to continue performing
           as intended. In comparison to Option 1a, the single sand plug at the southern end of Dog Beach
           may need to be reinstated at more regular intervals, potentially offsetting the benefit of the
           reduced sand volume needed for construction.

         The whole of life cost estimate for this option is $4.1M with annualised costs around $200,000/year.
         This estimate assumes five campaigns between 2020 and 2040. Each campaign would seek to
         relocate up to 50,000 m3 of sand.

         Like Option 1a, the potential for impact to environmental values is primarily related to the extractive
         dredging activities and disturbance to the estuarine habitats with opportunities to enhance terrestrial
         environmental values through revegetation and dune management programs to help stabilise the
         nourishment material. The increased frequency of dredging activities (i.e. more regular disturbance)
         is the reason Option 1b receives a lower score in comparison to Option 1a. The increased frequency
         of disturbance is also the reason for the lower score with respect to social benefits and risks to
         Council. Full details of the risk assessment results are provided in Appendix D.




 G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\R.B23636.001.02.SEMP_final.docx
Log in to download the original file

2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 1(PDF, 18MB).pdf · 18.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.