Original source · versioned page text
2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 1
The original of this document is very large (18.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Noosa Spit SEMP Final Report 83
Shoreline Erosion Mitigation Options
4.3.3 Option 2: extension of the existing groyne at Dog Beach
Figure 4-8 illustrates the model representation of the extension to the existing groyne. Key features
of the option include:
• The crest elevation of the groyne is 1 m above AHD (not overtopped under normal tidal conditions)
• The extension is similar in length to the existing geofabric sand container groyne (effectively
doubling the length of the existing structure).
The impacts to peak tidal current figures show:
• A moderate reduction (~0.2 to 0.4 m/s) in peak flood current magnitude at the Dog Beach channel
and shoreline.
• Increases to flood tide at the head of the proposed extension, effectively transferring the scour
currently observed at the existing structure. There is also a minor increase in peak flood current
magnitude through the central channel adjacent to the groyne structure.
• The peak ebb tide impacts are like Option 1a and 1b, with a significant reduction in magnitude at
the Dog Beach channel and shoreline. An increase in ebb tide current magnitude through the
central channel is also observed.
• The groyne extension option is considered ‘permanent’ and would be developed with a goal to
minimise ongoing maintenance requirements. The design would need to account for local scour
potential at the structure.
The whole of life cost estimate for this option is $1.8M with annualised costs around $90,000/year.
This estimate is based on the cost for similar works in 2012 (i.e. the existing training wall) with
adjustments for inflation. This includes beach nourishment as part of the capital costs. It is noted that
the extended structure is not expected to stabilise the entire length of shoreline and therefore
additional management actions and costs may be required toward the eastern extent of the Dog
Beach shoreline.
The potential for impact to environmental values is primarily related to the construction phase. There
would also be a notable impact to visual amenity.
The social benefits are primarily related to stabilising a longer section of shoreline and providing a
width of beach for recreational opportunities.
The risks to Council are generally low to medium and manageable. The exception being pedestrian
slip hazard at the crest of the structure and the submerged hazard which could result in injury when
swimming (diving) or boating near the structure. Similar risks are associated with the existing
structure, so the training wall extension does not represent a significant change in risk profile. Full
details of the risk assessment results are provided in Appendix D.
G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\R.B23636.001.02.SEMP_final.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.