Council archive · source document
Ecological Assessment_compressed · MCU22/0052
Connectivity Response
PO5 AO5 Yes, no clearing or barriers to
Development is designed and operated to Development is designed and operated to movement proposed.
maintain and enhance connectivity between maintain ecological linkages and maximise
and across ecologically important areas and opportunity for connectivity and the Additional revegetation along Kin
connecting habitat and support unimpeded movement of fauna by: Kin Creek will improve
and safe movement of terrestrial and aquatic (a) connectivity through the north-
ensuring protection of wildlife refuges; eastern portion of the property.
fauna.
(b) maintaining vegetation in patches of
the greatest possible size and within
the smallest possible edgetoarea
ratio;
(c) enhancing connectivity through
planting and rehabilitation works,
including across property
boundaries, to areas of national park,
state forest or reserve;
(d) avoiding the creation of physical
barriers and safety hazards (such as
roads, pedestrian access and instream
structures) along and within the
ecological linkage;
(e) providing mitigation measures such
as wildlife movement infrastructure,
fauna exclusion and directional
fencing, underpasses/overpasses and
traffic calming devices, signage and
lighting; and
(f) where offsets are necessary, delivering
offsets that support and enhance
ecological linkages.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Ecological Assessment_compressed.pdfRelated documentApplication case desk ↗
Ecological Assessment BA220095 - 332 Eastern Branch Road, Kin Kin QLD 4571 -.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.