            THE ONLY NAME IN SOILS                 UNIT 3/53 GATEWAY DR, NOOSAVILLE , 4566

                                   Ph.0754740900/ Fax.0754740901/ email: [email protected]

JOB NUMBER    15/0583-2      EFFLUENT DISPOSAL REPORT
CLIENT        GLENBRAE OPERATIONS.
SITE LOCATION EXISTING RESIDENCE/OFFICE & RV PARK,
              154 HOLTS ROAD, COOROY.
REPORT DATE   28/07/15 (AMENDED)



1.   INTRODUCTION

     The purpose of this report is to evaluate and define a suitable on-site sewerage treatment and
     disposal system for household effluents in accordance with Australian Standard 1547 - 2000
     “On-site domestic-wastewater management”. The Qld Plumbing & Wastewater Code has been
     used for reference purposes during the compiling of this report. This report has been amended
     due to information stating the existing office is also an existing 1 bedroom residence.

     This report relates exclusively to the existing residence/office & RV Park at 154 Holts Rd,
     Cooroy. This document has been prepared for the express purpose stated above. This document
     does not cover any other elements related to construction on the site.


2.   SITE DESCRIPTION AND WEATHER CONDITIONS

     The site is an existing RV park, which fronts a sealed road. The site has an existing
     residence/office, buildings and an amenities block currently disposing of effluent via an
     Advanced Secondary ASTP (Taylex ABS) with an unsuitable irrigation method.
     The slope configuration in relation to surface drainage is linear planar.
     The soil surface condition was moist at the time of testing. There was no evidence of cracking of
     the surface during the investigation.
     The site has no visible rock outcrops on the surface of the allotment.
     The proposed effluent disposal area is exposed to sun and wind.
     The proposed effluent disposal area is currently a partial nursery area. The proposed effluent
     disposal area falls at a slope of approximately 2% towards the north. Surface water drainage from
     adjoining allotments will not traverse this site. Surface water from the tested area will drain
     towards the north.
     The weather conditions prior to testing were periods of moist conditions.
     The site has a Dam approximately 160m downhill of the proposed effluent disposal area, while
     there is a watercourse approximately 110m downhill of the proposed effluent disposal area.

3.   SOIL PROFILE

     The borelogs carried out at the site, refer attached Site Plan for localities, indicate that the soil
     profile typically consists of a moist, brown, high plasticity SANDY CLAY. Underlying this is a
     moist, grey, high plasticity SILTY CLAY.
     Groundwater was not encountered during the field investigation.
     Rock was not encountered during the field investigation.

     RESERVE AREA
Full text of the other 9 pages

Page 2

     A 100% reserve effluent disposal area can be obtained on this allotment.

     Whilst every effort has been made to ensure that the borelogs carried out at the subject allotment
     are indicative of the soil profile over the site any discrepancy between the profile detailed in the
     borelogs and that observed during construction shall be referred to Global Testing for immediate
     attention.

4.   INVESTIGATION DETAILS

     The investigation carried out at the site included machine augered boreholes up to 2000mm
     depth and a series of three permeability test pits located as shown on the attached site report. All
     testing carried out was in accordance with Australian Standard 1547 - 2000 “On-site domestic-
     wastewater management”.


5.   TEST RESULTS AND CONCLUSIONS (TABLE A1)
      Test No.  Soil           Slope Setback   Recommended                                  Beavers
                Permeability   (m/m) Distance Design Irrigation                             Gardner
                (based on test       (m)      Rate (mm/week)                                Setback
                results)Ksat                   As per AS/NZS                                Distance
                                                 1547-2000
      PT 1           0.08
      PT 2                   0.08
      PT 3                   0.09
      Average                0.08           .02           10*                20                 1m

     *Minimum setback distance from a watercourse (when an Advanced Secondary ASTP is
      recommended) required by Noosa Council Policy.

     Determination of Soil Category (Table 4.1.1 of AS/NZS 1547:2000)
       Soil Category         Soil Texture         Structure           Indicative         Indicative
             BH1                                                    Permeability       Drainage class
                                                                    (ksat)(m/day)
              5               Light Clays         Moderately         0.06 to 0.12      Poorly Drained
        (00-1500mm)                               Structured
              6              Medium to            Moderately            < 0.06           Very Poorly
       (1500-2000mm)         Heavy Clays          Structured                              Drained

     The Design Irrigation Rate of 20 mm/week was adopted from the above results in Table A1.

     Noosa Council`s policy suggests that the use of a primary treated effluent disposal system
     will be satisfactory provided ;
         # Sufficient permeable surface soil overlying rock is present over the disposal area, not
          less than 1.2metres depth.
        # A suitable soil category material (as per AS1547-2000) is encountered.
        # A Minimum set-back distance of 50m is obtained.
        # Permeability rates are within the required parameters.
        # The site is located outside a catchment area.
     Not all the above requirements have been met, therefore it is concluded that the use of a
     primary treated effluent disposal system is not acceptable.
                                       Report 15/0583-2 edrpage2

Page 3

6.      RECOMMENDATIONS
         The Design Irrigation Rate of 20mm/week be adopted.
         The existing Advanced Secondary ASTP (Taylex ABS) is to be utilized, while the
          downhill septic tank and pump well (near the Dam) is to be utilized also.
         The existing irrigation method is to be disconnected.
         The new disposal system be by, # A Fixed Surface Spray Irrigation System, as per
          AS/NZS 1547:2000. Purple line is to be used from the Taylex ABS to the irrigation area.
          The disposal area is to be fenced (minimum 1200mm high), to restrict human and
          vehicular traffic.
         An in-line Filter is to be installed between the Treatment Plant and the Irrigation System.
          Regular maintenance of the Filter shall be undertaken, according to the manufacturers
          requirements.
         The area shall be surrounded by a 150mm high earth mound or similar.
         The spray irrigation system shall distribute the effluent evenly (via a K-Rain Valve)
          within the designated area through coarse spray heads suitable for use with effluent, and
          shall not produce aerosols. All ‘plumes’ shall be evenly distributed and fixed in place
          with a height of approx. 0.3m and have a throw of no greater than 2.0m. It is estimated
          that approximately 42 plumes would be required.
         Non-return valves and flush-out valves should be installed on irrigation lines.
         The disposal area should be rotary hoed to a depth of 200mm and gypsum added.
          Evergreen plants/vegetation/turf shall be planted to maximize evapo-transpiration.
         The disposal area required is 658m2.
          A daily flow rate of 1880 litres/day (8 caravan sites/ 16 persons @ 100 litres per
          person/per day, and the existing 1 bedroom residence/office (2 persons @ 140 litres per
          person/per day) has been adopted with a Design Irrigation Rate of 20mm/week, using
          Standard Water-reduction fixtures (Standard water-reduction fixtures include dual
          flush 6/3 litre (minimum) water closet, shower-flow restrictors, aerator faucets, and a
          water-conserving washing machine). These fixtures must be installed. This flow rate
          will accommodate the existing 1 bedroom residence/office and the
          8 x caravan sites using standard water-reduction fixtures only. A 100% reserve area (as
          per site plan) is to be kept free of buildings and traffic.
         The disposal area should be located in the vicinity of PT 1,PT 2 and PT 3 as per attached
          site plan.
         All set-back distances as required by the local authority shall be met;
          At least two signs stating “Recycled water- Do not drink” are to be erected on boundaries

        . Stormwater run-off including roofwater from buildings shall be diverted around and away
            from the disposal area. Imported fill may be required should there be insufficient soil available
            for the design of the disposal system.
            Please note: Personal Hygiene Products, Bleaches and detergents high in phosphorous will
            damage the capabilities of the Treatment System’s performance. Information should be
            sought by the Treatment System’s manufacturer for a guide of suitable products acceptable
            for the system.(some examples attached to this report).
Certification
The local authority may request that an inspection and certification is undertaken on the installation of the
system when nearing completion. The installer must contact Noosa Council prior to ‘burying’ the system,
if certification is required.
 Yours Sincerely,



Michael S. Pinkney (Laboratory Manager) Report 15/0583-2 EDR-page3

Page 4

                THE ONLY NAME IN SOILS

SOIL PROFILE REPORT
CLIENT:               Glenbrae Operations                      AUTHORIZED                Glenbrae Operations
                                                               BY:
PROJECT:              154 Holts Rd,                            DATE TESTED:              02/07/15
                      Cooroy.                                  JOB NO:                   15/0583-2

                        Drilling Method: Jacro 105 100mm                                            Borehole
                                                                                                     No: 1
    Depth           Description                                                     PENET.         Comments
                                                                               (blows per 100mm)
    (mm)
                                                                               1     2    3    4
       0            SANDY CLAY (CH)- High plasticity,
                    brown, fine to medium sand, moist,
      100           stiff.
      200
      300
      400
      500
      600
      700
      800
      900
     1000
     1100
     1200
     1300
     1400
     1500           SILTY CLAY (CH)- High plasticity,
                    pale grey, moist, stiff.
     1600
     1700
     1800
     1900
     2000           Hole Terminated.
     2100
     2200
     2300
     2400
     2500

Borelogging in accordance with AS1726-1993 Site Investigation Code




                                                        15/0583-2-edr Page 4

Page 5

             THE ONLY NAME IN SOILS

SOIL PROFILE REPORT
CLIENT:               Glenbrae Operations                      AUTHORIZED                Glenbrae Operations
                                                               BY:
PROJECT:              154 Holts Rd,                            DATE TESTED:              02/07/15
                      Cooroy.                                  JOB NO:                   15/0583-2


                        Drilling Method: Jacro 105 100mm                                            Borehole
                                                                                                     No: 2
                    Description                                                     PENET.         Comments
    Depth                                                                      (blows per 100mm)
    (mm)
                                                                               1     2    3    4
       0            SANDY CLAY (CH)- High plasticity,
                    brown, fine to medium sand, moist,
      100           stiff.
      200
      300
      400
      500
      600
      700
      800
      900
     1000
     1100
     1200
     1300
     1400
     1500           SILTY CLAY (CH)- High plasticity,
                    pale grey, moist, stiff.
     1600
     1700
     1800
     1900
     2000           Hole Terminated.
     2100
     2200
     2300
     2400
     2500

Borelogging in accordance with AS1726-1993 Site Investigation Code


                                                        15/0583-2-edr Page 5

Page 6

            THE ONLY NAME IN SOILS

SOIL PROFILE REPORT
CLIENT:               Glenbrae Operations                      AUTHORIZED                Glenbrae Operations
                                                               BY:
PROJECT:              154 Holts Rd,                            DATE TESTED:              02/07/15
                      Cooroy.                                  JOB NO:                   15/0583-2


                        Drilling Method: Jacro 105 100mm                                            Borehole
                                                                                                     No: 3
                    Description                                                     PENET.         Comments
    Depth                                                                      (blows per 100mm)
    (mm)
                                                                               1     2    3    4
       0            SANDY CLAY (CH)- High plasticity,
                    brown, fine to medium sand, moist,
      100           stiff.
      200
      300
      400
      500
      600
      700
      800
      900
     1000
     1100
     1200
     1300
     1400
     1500           SILTY CLAY (CH)- High plasticity,
                    pale grey, moist, stiff.
     1600
     1700
     1800
     1900
     2000           Hole Terminated.
     2100
     2200
     2300
     2400
     2500

Borelogging in accordance with AS1726-1993 Site Investigation Code

                                                        15/0583-2-edr Page 6

Page 7

* DO NOT Allow newspapers, disposable or sanitary napkins, rubber products,
         nappy liners, cotton buds etc. to enter the system.



* DO NOT Use an in-sink garbage grinder. These are not recommended by most
         councils as they can add extra loading equivalent to about 2 persons.



* DO NOT Use strong caustics, acids, alkalis or chemical detergents. These can
         damage the system and cause bad odours.




* DO NOT Use disinfectants or other bactericides.



* DO NOT Put grease/fats or food scraps down the kitchen sink i.e plates should be
         scraped resonably clean prior to washing up.


* NEVER       Dispose of used cooking oil or similar material down the sink.




                                     15/0583-2-edr Page 7

Page 8

                         Surface Irrigation system (sprays)
Plant Surface
                                          4m                                      0.3m plumes
    Ground Level




                                                                               Heavy droplet
                                                                               (Plumes e.g 10mm
                                                                                 feeder lines)
                                   25mm diameter poly lines laid beneath surface.

            150mm high mound surround

            Rotary-hoe to a depth of 200mm and add gypsum

                                               Plumes (side view)




            150mm High earth mound to surround area

                                   Typical Plan Layout of Manifold and Laterals for an
                                              Irrigation Area of 658m2
Fence to surround area
                                                                                   2m

                                                                                   4m
25mm dia poly lines
                                                                                   4m
To Taylex
ABS

                                                                                   4m
                                    2m                                      4m
6 port K-Rain
Valve                     28m                  Plant out or turf surface           4m



                                                                                   4m



                                                                                   4m

                                                                                 Land Slope
            Plumes
                                                                    23.5m
                                               Flush-out valves

Page 9

Page 10

    Job No: 15/0583-2               Date Tested: 02/07/15        Site : 154 Holts Rd, Cooroy Client : Glenbrae Operations              NOT TO SCALE




                                                         Utilize existing                      Amenities Block
                                                         Taylex ABS
   Proposed Surface Irrigation Area-
   658m2 (To be rotary hoed to a depth of
   200mm with gypsum added, to be
   planted out, bordered with a 150mm
   high earth mound, and fenced)
                                                                                                                 Utilize existing Septic
                                                                                                                 Tank and Pump Well


 BH3

                              BH3
                                 10m
                                                Toilet
                      2% Slope         PT3

        4m
                                         BH2
        PT1

                                         4m
        BH1
23.5m

                            K-Rain Valve
              PT2
                            (To be installed)

                                 28m

Used in these records

About this file

File size
965 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

3461EffluentDisposalRep.pdf · 965 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.