6. RECOMMENDATIONS
The Design Irrigation Rate of 20mm/week be adopted.
The existing Advanced Secondary ASTP (Taylex ABS) is to be utilized, while the
downhill septic tank and pump well (near the Dam) is to be utilized also.
The existing irrigation method is to be disconnected.
The new disposal system be by, # A Fixed Surface Spray Irrigation System, as per
AS/NZS 1547:2000. Purple line is to be used from the Taylex ABS to the irrigation area.
The disposal area is to be fenced (minimum 1200mm high), to restrict human and
vehicular traffic.
An in-line Filter is to be installed between the Treatment Plant and the Irrigation System.
Regular maintenance of the Filter shall be undertaken, according to the manufacturers
requirements.
The area shall be surrounded by a 150mm high earth mound or similar.
The spray irrigation system shall distribute the effluent evenly (via a K-Rain Valve)
within the designated area through coarse spray heads suitable for use with effluent, and
shall not produce aerosols. All ‘plumes’ shall be evenly distributed and fixed in place
with a height of approx. 0.3m and have a throw of no greater than 2.0m. It is estimated
that approximately 42 plumes would be required.
Non-return valves and flush-out valves should be installed on irrigation lines.
The disposal area should be rotary hoed to a depth of 200mm and gypsum added.
Evergreen plants/vegetation/turf shall be planted to maximize evapo-transpiration.
The disposal area required is 658m2.
A daily flow rate of 1880 litres/day (8 caravan sites/ 16 persons @ 100 litres per
person/per day, and the existing 1 bedroom residence/office (2 persons @ 140 litres per
person/per day) has been adopted with a Design Irrigation Rate of 20mm/week, using
Standard Water-reduction fixtures (Standard water-reduction fixtures include dual
flush 6/3 litre (minimum) water closet, shower-flow restrictors, aerator faucets, and a
water-conserving washing machine). These fixtures must be installed. This flow rate
will accommodate the existing 1 bedroom residence/office and the
8 x caravan sites using standard water-reduction fixtures only. A 100% reserve area (as
per site plan) is to be kept free of buildings and traffic.
The disposal area should be located in the vicinity of PT 1,PT 2 and PT 3 as per attached
site plan.
All set-back distances as required by the local authority shall be met;
At least two signs stating “Recycled water- Do not drink” are to be erected on boundaries
. Stormwater run-off including roofwater from buildings shall be diverted around and away
from the disposal area. Imported fill may be required should there be insufficient soil available
for the design of the disposal system.
Please note: Personal Hygiene Products, Bleaches and detergents high in phosphorous will
damage the capabilities of the Treatment System’s performance. Information should be
sought by the Treatment System’s manufacturer for a guide of suitable products acceptable
for the system.(some examples attached to this report).
Certification
The local authority may request that an inspection and certification is undertaken on the installation of the
system when nearing completion. The installer must contact Noosa Council prior to ‘burying’ the system,
if certification is required.
Yours Sincerely,
Michael S. Pinkney (Laboratory Manager) Report 15/0583-2 EDR-page3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
3461EffluentDisposalRep.pdfRelated documentApplication case desk ↗
3461EffluentDisposalRep.pdfRelated documentApplication case desk ↗
About this file
- File size
- 965 KB (small file)
- File type
No other editions are linked here.