Council archive · source document
Original Application Part 1 - IDAS Forms [As Published] · 132008.1787
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
2.1.1 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
(J Yes No
Ifno, is the proposed use listed in schedule 5 of the Integrated Planning Regulation 1998 and does it exceed the specified
threshold?
No [7] Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
IP Regulation, schedule 2, table 3, items 1(a) and 3
2.4.2 Is the use proposed in a local government area listed? * in State Planning Policy 2/02: Planning and Managing Development
Involving Acid Sulfate Soils?
[7] No - Goto 02.1.3 Yes
21 Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Calms, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloola, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Mornington, Noosa, Pine
Rivers, Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday
If yes, is the natural ground level of any part of the premises less than 20m AHD?
[[] No Yes
If yes, will the proposed use involve the following?
() Excavating more than 1,000m? of soil or sediment at or below 5m AHD No [Yes
(ii) Filling the premises with 1,000m3 or more of material with an average depth of fx] No [1 Yes
0.5m on land, soil or sediment at or below 5m AHD
If yes to either or both (i) or (ii) above - This application must be referred fo the Department of Natural Resources and Water
(NRW) as Advice Agency.
IP Regulation, schedule 2, table 3, em 4; State Planning Policy 2/02: Planning and Managing Development Invalving Acie! Saifate Svils, section 3.6
2.4.3 Does the proposed use involve the following?
(i) Carrying out operational work, completely or partly in a coastal, management district CL No fl Yes
(li) Carrying out building work, completely or partly in a coastal management district, that is the [No [x] Yes
construction of new premises with a gross floor area (GFA) of at least 1,000m?
(iii) Carrying out building work, completely or partly in a coastal management district, thatisthe [| No [] Yes
enlargement of the GFA of existing premises by more than 1,000m?
If yes to any one of (i) - (ili) above - This application must be referred to the Environmental Protection Agency (EPA) as Concurrence Agency.
IP Regulation, schedule 2, table 3, item 6
2.1.4 Do the premises include a lot containing the following?
() Acategory 1, 2 or 3 area shown on a Property Map of Assessable Vegetation (PMAV) [| No (1) Yes
(ii) If there is no PMAV for a lot, remnant vegetation [xl No (Yes
IP Regulation, schedule 2, table 3, item 11
2.1.5 Is any part of the premises in an area for which an area management advice has been given for unexploded ordnance?
No - Go to Q2.1.6 oO Yes - (Complete Form 1, Part N) This application must be referred to the Administering Authority as Concurrence
Agency.
le 2, 2
Is the proposed use of premises listed in schedule 13C of the Integrated Planning Regulation 1998 and does it exceed the
specified threshold?
No - Go fo Q2.1.7 Oo Yes - This application must be referred to Queensland Transport (QT) as Concurrence Agency.
IP Regulation, schedule 2, table 3, item 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Original Application Part 1 - IDAS Forms [As Published]Related documentApplication case desk ↗
0019199D.001.pdfRelated documentPublic source context ↗
About this file
- File size
- 4.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.