Minor Change Report

Attached to the e-mail Minor Change Application OPW17/0150.01.

of 8

Page text shows just the words. Original shows the document exactly as it was published.

       E. public notification if public notification was not required for the development
          application.

       Response: The change does not require the application to be publicly notified.



Given the above, the proposed change to the existing approval is a minor change in accordance
with Schedule 2 of the Planning Act 2016 and Schedule 1 of the Development Assessment Rules


DEVELOPMENT CONSISTENT WITH DEVELOPMENT CODES AND OTHER DECISIONS


In accordance with Section 81 of the Planning Act 2016, the Council must consider as part of its
assessment of the minor change’s application all matters the responsible entity would or may
assess against or have regard to, if the change application were a development application. The
Noosa Plan’s Watercourse Works code is the most relevant matter for assessment.

An assessment against Specific Outcome O5 is provided below:



 O5 Prescribed tidal works are designed and
 sited to ensure—

 a) they are contained within the prolongation   The site is used for recreational boat hire to the
 of boundaries of the lot;                       public. The constructed works and berthed
                                                 vessels are located within the lease area
                                                 boundaries.

 b) that when a vessel is berthed it does not    The term ‘berth’ implies a vessel’s allotted
 encroach over the prolongation of boundaries    place at a wharf. The vessels that are berthed
 of the lot;                                     at the site can be located within the lease
                                                 area, as required by condition 1 of the existing
                                                 development approval.

                                                 We have requested a change to condition 1
                                                 to change ‘moored’ to ‘berthed’ to better
                                                 reflect these performance criteria.

                                                 The existing approval for 2600mm setback
                                                 from      the    lease    boundary     would
                                                 accommodate the berthing of the hire boats,
                                                 however the area is not used for this. Larger
                                                 boats such as the coast guard and ferry that
                                                 use this area could not have docked within the
                                                 lease area to ferry terminal or refuel if the
                                                 2600mm setback was achieved.

                                                 It is therefore considered that the temporary
                                                 docking of vessels on the outer pontoon does
                                                 not constitute berthing or mooring.
Log in to download the original file

Minor Change Report.pdf · 236 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.