Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

Minor Change Report

Attached to the e-mail Minor Change Application OPW17/0150.01.

of 8

Page text shows just the words. Original shows the document exactly as it was published.

The setback to the outer lease boundary is controlled by the mooring requirements of the site. The
end of the jetty at 180 Gympie Tce is not used for mooring, and therefore a lessor setback should
be suitable in this instance. The new setbacks will not allow for mooring at the end of the facility
where the jetty encroaches as shown below.




The existing approved plans are already annotated ‘No Mooring at Any Time’. The minor change
to reduce the setback to the outer lease boundary from 2600mm to 3mm still allows for condition
1 on the decision notice to be satisfied.

It is unlikely that future use of the site will result in non-compliance issues. The encroaching part of
the jetty is used for the fueling of vessels not associated with the marine use of the facility (boat
hire) and a terminal for the Noosa Ferry, which needs access 364 days a year. Any mooring of
vessels along this part would impede those other operations that the jetty supports (See attached
letters from Noosa Ferry and other stake holders in the attached supporting documents).
Log in to download the original file

Minor Change Report.pdf · 236 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.