Original source · versioned page text
2020-10-12 GC Agenda - Item 6 - Attachment 1 - Proposal
Very large file: it may take a few minutes
The original of this document is very large (21.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
REV DESCRIPTION DRN DATE
A MCU DA Issue MS 25.02.20
New 1800 high frameless B MCU DA Issue MS 02.03.20
Feature
translucent glass pool fence New frameless glass New pool access BBQ C MCU DA Issue MS 06.03.20
New upstand wall to stepping stones
and gate on anodised pool fence on anodised steps and proprietary Existing ramp to
outer edge of pool between main New D Client Revisions MS 14.04.20
aluminium spigots aluminium spigots type handrail entry to be retained
and kids pool landscaping E MCU DA MS 05.08.20
surrounding Unit 205 terrace SETOUT POINT Property Boundary Information Response
TI
Planter Void dn New garden edging to
New 200 x 50 powdercoated
aluminium awning frame with COL up perimeter of turfed area
Gate
powdercoated 'timber-look' DP Gate
Kids pool Retain existing
aluminium battens under to G New concrete pavers / stepping
at landscaping and
New 1:20 ramp
existing terrace e stones connecting basement
Planter dn dn Main pool Existing pool OSHR
stair, entry and outdoor shower
garden edging to
(to be extended) council frontage
Seat
DP
GD
up up Approximate location
GD New landscaping to
U205 terrace of original opening in
Balance supplement existing
podium slab New turf
GD
(new tiled finish)
Pool terrace tank under DP
dn
(new tiled finish) COL Existing stair to basement
New planters to match
DP to be retained. New tiles
new garden edging
Existing Restaurant
to treads and landings Existing beach (no works)
GD Walkway
Gate
Planter
(new tiled finish) umbrella, stand and
dn table to be retained New, reconfigured entry / exit fire
New blockwork wall New tiled surface escape stairs, ramps and
Plunge planter, level with walkway to all terraces platforms to conform with current
Pool Planter building standards to future detail
SK dn dn dn dn dn
LB LB LB LB LB LB LB LB
New 1:20 ramp
up up up up up DP offsets DP offsets DP offsets DP offsets DP offsets
GD
Gate GD Gate Gate GD
Gate GD Gate GD Screen Screen
BO BO BO BO in wall in wall in wall in wall in wall
Existing beach U206 terrace U207 terrace U208 terrace U209 terrace U210 terrace U211 terrace U212 terrace U213 terrace U214 terrace U215 terrace U216 terrace
umbrella, stand and (new tiled finish) (new tiled finish) (new tiled finish) (new tiled finish) DP offsets (new tiled finish) (new tiled finish) (new tiled finish) (new tiled finish) (new tiled finish) (new tiled finish) (new tiled finish)
up dn DP
table to be retained in wall
Bricks
Bricks
Glass
Bricks
Bricks
Bricks
Bricks
Glass
fall
fall
fall
fall
fall
fall
fall
fall
fall
fall
fall
Glass
Glass
Glass
Glass
Glass
DP in wall Bricks
ir
Sta
GD
Gate
DP
try t
en uran
U205 terrace
sta
Sc
BUILDING A BUILDING B
Re
(new tiled finish) ree
up n
BO
Landing COL
HYD
dn
DP
n
ree
dn
Sc
U205 U206 U207 U208 U209 U210 U211 U212 U213 U214 U215 U216
BO BO
ir
Sta
p
0ram
1:2
U204 terrace
w
New roof over wine New storage and
Ne
(new tiled finish) Existing Units bar / lounge area. sanitary facilities
fa (no works) Provide fire separation above existing COL
ll
measures as part of Existing Units substation on elevated
NCC requirements (no works) floor to future details.
ct
DP
Du
up
Glass
Bricks
GP
Planter Under COL
Store
Walkway DP
DP in wall
n
BO
ree
(new tiled finish) Planter
Planter
Sc
New
Fascia gutter
U203 terrace Box gutter HYD
ick s
Roof PWD
Br las
s
G
(new tiled finish) 5° Planter COL
fa
Void
ll
U204 Void
D
54
30
Gate 0
5.6
R DP GP
A
FH Fascia gutter UnderCOL
Female
Planter DP COL COL DP Refuse COL GP COL GP
New Roof
O
DP COL DP Under DP Under Suite 2,
5°
DP in wall Existing Cnr Gard
R
Gate
COL
New Roof
Lift Core 01 Walkway Male
(new tiled finish) New 1:20 ramp Alexand
5°
BO BO BO
U202 terrace DP
PO Box
K
(new tiled finish) DP DP KEX
Screen
Screen
COL DP COL
FHR
DP DP DP
New Roof
P 07 54
R
ll
Screen
Line of glazed wall
U203 Existing
fa
(new tiled finish)
COL
2°
under shown dotted admin@
Lift Core 02
Walkway
Screen
A
BO KIN COL
Screen
P
Existing New Roof Existing
5°
Fire Stair 01 Fire Stair 02 D SUNCOAST RESORT BUSINESS CENTRE
New Roof
DP in wall New roof over entry court SUITE 2 CNR GARDAK ST & SURF RD
Valley gutter
2°
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.