Original source · versioned page text
2020-10-12 GC Agenda - Item 6 - Attachment 1 - Proposal
Very large file: it may take a few minutes
The original of this document is very large (21.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
REV DESCRIPTION DRN DATE
A MCU DA Issue MS 25.02.20
Generally throughout: B MCU DA Issue MS 02.03.20
- New render and paint finish to all external walls C MCU DA Issue MS 06.03.20
- New anodised aluminium (25µm coating) D Client Revisions MS 14.04.20
E MCU DA MS 05.08.20
sliding doors to terraces / balconies Information Response
- New anodised aluminium (25µm coating) windows
- New frameless glass balustrade with
anodised aluminium (25µm coating) uprights
- New tiles to walkways, terraces and balconies
Powdercoated Existing Fire Stair 03 core with Existing Lift Core 01 core with New roof structure over fire New 200 x 50 powdercoated aluminium awning portal
Select feature render New frameless glass balustrade with New powdercoated aluminium 15 m height line -
Hastings Street Frontage
Hastings Street Frontage
aluminium sun hood / feature powdercoated feature powdercoated stair extension. Provide roof Extension to frame to future detail, supported by RHS columns with
and paint finish to powdercoated aluminium uprights. gate and side screen to measured from NGL
Property Boundary
Property Boundary
box frame surround to aluminium placards and resort aluminium placards and resort cover for full extent of stair Lift Core 02 select powdercoated 'timber-look' aluminium battens
new blockwork walls Refer to DD80 series for more details recessed roof terrace entry at face of building
existing window opening signage fixed to blockwork wall signage fixed to blockwork wall and bridge link behind over and 50 x 50 SHS capping to top of frame
LIFT ROOF
approx.
(varies)
2393
SITE CONTINUES
LIFT PLANT
approx.
(varies)
2290
ROOF TERRACE
approx. (varies)
2768
THIRD FLOOR
approx. (varies)
Screen Screen
Screen Screen
2787
SECOND FLOOR
approx. (varies)
2756
Screen
FIRST FLOOR
approx. (varies)
3232
GROUND FLOOR
New steel stud wall with select
New powdercoated aluminium Remove existing water
Feature timber seat on Proposed new New awning cantilevered off Feature illuminated FC cladding in front of existing Feature powdercoated
automatic sectional garage door with exit Existing tenancies - feature and planter section.
recessed concrete base, shopfront glazing to existing wall and supported resort logo and entry blockwork wall with select aluminium trellis screen with
gate to side. Provide key card access to no works Provide new entry / exit gate
downlighting under existing tenancies by wall extensions signage to future detail aluminium sun hood box vertical landscaping on wires
garage door; panic bar to exit gate with fire escape stair behind
surround to window opening
SOUTHERN ELEVATION
Scale 1:100
New 200 x 50 powdercoated aluminium awning New 'PosiGlaze' balustrade system. New 200 x 50 powdercoated aluminium awning portal
Property Boundary
Property Boundary
frame with powdercoated aluminium 'timber- Existing Lift End Base channel 75 mm off side frame to future detail, supported by RHS columns with
look' battens under and select polycarbonate Core 01 behind walls with stainless steel toprail. Refer select powdercoated 'timber-look' aluminium battens
roof sheeting over to future detail to DD80 series for more details over and 50 x 50 SHS capping to top of frame
LIFT ROOF Suite 2,
15 m height line -
measured from NGL at face of building Cnr Gard
approx.
(varies)
2393
Alexand
PO Box
LIFT PLANT P 07 54
Powdercoated
approx.
(varies)
admin@
2290
aluminium sun hood /
box frame surround to
existing window opening
ROOF TERRACE H SUNCOAST RESORT BUSINESS CENTRE
approx. (varies)
A SUITE 2 CNR GARDAK ST & SURF RD
ALEXANDRA HEADLAND Qld 4572
2768
S PO BOX 6232 MAROOCHYDORE BC Qld 4558
T PH : 07 5443 5028 FAX:07 5479 2380
I ABN 23 123 917 724
THIRD FLOOR
N EMAIL: [email protected]
approx. (varies)
Screen Screen Screen Screen
G
2787
project
S
PROPOSED ALTERATIONS &
S ADDITIONS TO EXISTING
SECOND FLOOR
T RESORT BUILDING
approx. (varies)
R for
2756
E NETANYA RESORT
E
T at
FIRST FLOOR
75 HASTINGS STREET
approx. (varies)
Screen
NOOSA HEADS
3232
drawing
NEW WORKS - ELEVATIONS
GROUND FLOOR
New 'PosiGlaze' balustrade system. 100 x 25 powdercoated
New select render Proposed new New awning cantilevered off Feature timber seat on
End Base channel 75 mm off side aluminium batten screen spanning
and paint finish to shopfront glazing to existing wall and supported recessed concrete base,
all external walls
walls with stainless steel toprail. from top of existing upstand wall
existing tenancies by wall extensions downlighting under AS SHOWN
Refer to DD80 series for more details to underside of new roof over date 5/08/2020 drawn JP scale @A1
WESTERN ELEVATION drawing no. 19021 SD30.00 revision E
Scale 1:100
Copyright of this document remains the exclusive
property of SPROUT ARCHITECTS PTY LTD
ABN 23 123 917 724.
Contractors are to verify all dimensions and levels on
site prior to commencing. Report all discrepancies to
the Architect. Use figured dimensions in preference
0 5 10 20 to scaled.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.