REV DESCRIPTION DRN DATE
A MCU DA Issue MS 25.02.20
B MCU DA Issue MS 02.03.20
C MCU DA Issue MS 06.03.20
D Client Revisions MS 14.04.20
E MCU DA MS 05.08.20
Information Response
200 x 50 powdercoated aluminium
awning frame supported by
reinforced concrete blade columns.
Provide 50 x 20 battens to
underside of frame, select
polycarbonate roof sheeting over
150 x 50 hardwood
timber batten screen
New frameless glass New 1200 mm high blockwork 100 x 25 powdercoated aluminium
balustrade and gate with wall with select mosaic tile finish. pergola frame fixed to slab edge
anodised aluminium uprights, Provide feature water spout / downturn. Horizontal member fixed
fixed to slab edge downturn waterfall effect to kids pool area to slab edge / upstand wall above
100 x 25 powdercoated aluminium
pergola frame fixed to slab edge
New blockwork wall
planter. Top of wall to be
New outdoor shower area.
Select new fixtures to
Generally throughout:
downturn. Horizontal member fixed
to slab edge / upstand wall above
level with timber decking connect to existing plumbing - New render and paint finish to all external walls
- New anodised aluminium (25µm coating)
New concrete pavers / sliding doors to terraces / balconies
Feature timber seat
stepping stones on gravel bed - New anodised aluminium (25µm coating) windows
with downlighting
connecting basement stair,
under to future detail - New frameless glass balustrade with
entry and outdoor shower
anodised aluminium (25µm coating) uprights
- New tiles to walkways, terraces and balconies
Suite 2,
100 x 25 powdercoated aluminium
pergola frame fixed to slab edge Cnr Gard
downturn. Horizontal member fixed Alexand
to slab edge / upstand wall above
PO Box
New concrete pavers / 200 x 50 powdercoated aluminium awning frame
New frameless glass pool fence P 07 54
stepping stones on gravel bed supported by reinforced concrete blade
connecting basement stair, columns. Provide 50 x 20 battens to underside
and gate on anodised aluminium admin@
spigot fixings to future detail
entry and outdoor shower of frame, select polycarbonate roof sheeting over
5°
SUNCOAST RESORT BUSINESS CENTRE
5°
SUITE 2 CNR GARDAK ST & SURF RD
ALEXANDRA HEADLAND Qld 4572
PO BOX 6232 MAROOCHYDORE BC Qld 4558
PH : 07 5443 5028 FAX:07 5479 2380
ABN 23 123 917 724
EMAIL: [email protected]
2400
project
Pool terrace
(new tiled finish)
PROPOSED ALTERATIONS &
ADDITIONS TO EXISTING
RESORT BUILDING
50
for
Kids Pool
450
(water depth T.B.C.)
NETANYA RESORT
approx.
approx.
1260
1260
Planter
approx.
Main Pool
at
760
Balance
Void Void
Tank 75 HASTINGS STREET
NOOSA HEADS
drawing
DETAILED AREA - POOL
TERRACE / REAR ENTRY
Carpark
AS SHOWN
date 5/08/2020 drawn JP scale @A1
drawing no. 19021 SD60.05 revision E
Copyright of this document remains the exclusive
property of SPROUT ARCHITECTS PTY LTD
ABN 23 123 917 724.
SECTION C Contractors are to verify all dimensions and levels on
site prior to commencing. Report all discrepancies to
the Architect. Use figured dimensions in preference
Scale 1:50 0 5 10 to scaled.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.