2020-10-12 GC Agenda - Item 6 - Attachment 1 - Proposal
Very large file: it may take a few minutes
The original of this document is very large (21.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
REV DESCRIPTION DRN DATE
A MCU DA Issue MS 25.02.20
B MCU DA Issue MS 02.03.20
C MCU DA Issue MS 06.03.20
D Client Revisions MS 14.04.20
E MCU DA MS 05.08.20
Information Response
Key Changes - Legend
1 The extension of the outdoor dining area for
the Providore tenancy
2 A new awning over the Hastings Street side
of Bellissima tenancy for increased weather
protection
3 A new roof over the western side of the
Bellissima tenancy and service yard for
increased weather protection
4 A new roof over the foyer entry and car
8 9 8 9 set down area adjoining lobby for increased
weather protection and convenience
5 The extension of the existing fire stairs from
Level 3 to the roof level to meet fire and
evacuation codes
6 The extension of the eastern lift from Level 3
to the roof level to meet DDE standards
Generally throughout:
- New render and paint finish to all external walls 7 New covered walkway links to the fire stairs
on Level 4 for increased weather protection
- New anodised aluminium (25µm coating)
sliding doors to terraces / balconies 8 New feature pergolas to the rooftop terraces
- New anodised aluminium (25µm coating) windows for increased shade protection
- New frameless glass balustrade with
anodised aluminium (25µm coating) uprights
- New tiles to walkways, terraces and balconies BUILDING A BUILDING B 9 A new cantilevered awning above the north
facing units on the beach side for increased
weather protection
10 A new awning structure above the U205
terrace for increased weather protection
New roofing and anodised
aluminium batten structure to 11 A new rear entry structure between the
building and the beach for increased
balconies. Refer to SD60.06 weather protection
for perspectives and
description of new works
12 A new plunge pool and pergola over
to existing U205 terraced
New feature pergola and shower
area to rooftop terraces. Refer to
SD60.06 for perspectives and 13 New stair, substation, amenities and roof
description of new works structure to the eastern side of the building /
Sails entry
14 New shopfront and roof over 'Rumba Bar'
Void Void Void 7 as well as extension of Fire Stair 01
New feature pergola and shower
Suite 2,
area to rooftop terraces. Refer to
SD60.06 for perspectives and New lift core and fire exit stair Cnr Gard
extensions to rooftop terrace. Covered
description of new works Alexand
walkway links and screening. Refer to
SD60.07 for perspectives and PO Box
description of new works
P 07 54
admin@
SUNCOAST RESORT BUSINESS CENTRE
SUITE 2 CNR GARDAK ST & SURF RD
ALEXANDRA HEADLAND Qld 4572
PO BOX 6232 MAROOCHYDORE BC Qld 4558
PH : 07 5443 5028 FAX:07 5479 2380
ABN 23 123 917 724
EMAIL: [email protected]
project
PROPOSED ALTERATIONS &
ADDITIONS TO EXISTING
RESORT BUILDING
for
NETANYA RESORT
5 6 5 at
75 HASTINGS STREET
NOOSA HEADS
drawing
NEW WORKS - FOURTH FLOOR
SITE PLAN
AS SHOWN
date 5/08/2020 drawn JP scale @A1
drawing no. 19021 SD10.04 revision E
Copyright of this document remains the exclusive
N
property of SPROUT ARCHITECTS PTY LTD
ABN 23 123 917 724.
LEVEL 4 / ROOF TERRACE Contractors are to verify all dimensions and levels on
site prior to commencing. Report all discrepancies to
the Architect. Use figured dimensions in preference
Scale 1:200 0 5 10 20 30 40 to scaled.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.