Delegated Report - Code - Planning OPW19 0168
Author Monkeith Kadhum - Development Engineer Development Assessment APPLICATION DETAILS Application No. OPW19/0168 Applicant Ben Johnstone Proposal Operational Works - Vehicle Crossover Properly Made Date 1 August 2019 Information Request Date NA Information Response Date NA Decision Due Date < Report Completed Date 09/08/2019 Number of Submissions Not Applicable PROPERTY DETAILS Property Address Pandanus Cove 3 Mitti St Noosa Heads Qld 4567 RP Description Lot 0 BUP 2003 Land Area 809 m² Zone Semi-Attached Housing Assessment Type Code PROPOSAL The application seeks approval for Operational Works - Vehicle Crossover. assessment The application has been assessed against the following statutory planning instruments to the extent they are relevant to the development: State Planning Policy; South East Queensland Regional Plan; Planning Regulation 2017 The Noosa Plan. conclusion & reasons for decision The proposed development generally complies with the requirements of the planning scheme and does not raise any significant issues that cannot be addressed by reasonable and relevant conditions. The application is therefore recommended for approval. The report is provided in accordance with Section 63(5) of the Planning Act 2016. RECOMMENDATION With regard to Application No OPW19/0168 for a Operational Works - Vehicle Crossover situated at Pandanus Cove 3 Mitti St Noosa Heads Qld 4567 and described as Lot 0 BUP 2003 , it is recommended the application be approved in accordance with the following details for the Decision Notice: application details Application No: OPW19/0168 Street address: Pandanus Cove 3 Mitti St Noosa Heads Qld 4567 Real property description: Lot 0 BUP 2003 Planning Scheme: The Noosa Plan (8 June 2018) Decision details Council decided to issue the following type of approval: Development Permit for Operational Works - Vehicle Crossover . CURRENCY PERIOD of approval The currency period for this development approval is stated in the Condition 1 below. assessment manager conditions CURRENCY PERIOD The Currency Period for this development approval lapses if the development has not substantially started by <insert day due to lapse>, unless an application to extend the currency period is approved by Council. PRIOR TO CONSTRUCTION Engineering A condition report including photographs of the frontage of the site must be completed and submitted to Council at the prestart meeting. The principal contractor must have all the appropriate insurance and public liability documentation to carry out the works. The principal contractor is also responsible to ensure that any subcontractors also have the appropriate insurance and public liability documentation. Certificates demonstrating currency of public liability insurance and works insurance covering the works must be submitted to Council prior to the prestart meeting. Council must be contacted at least 5 working days prior to any works commencing to organise a prestart. The contact number to arrange a pre-start meeting is 5329 6245. The pre-start meeting must include the relevant parties for the following aspects of the works: Civil engineering works; A Construction Management Plan must be submitted to Council prior to the pre-start meeting and must specifically address the following: Traffic Management during the construction phase to address traffic safety issues and minimise impact on traffic flows in the local streets. Appropriate traffic signage in accordance with the Manual of Uniform Traffic Control Devices (MUTCD) during all stages of the works. Provision for safe pedestrian access across the frontage of the site both during and after working hours. All reasonable measures to minimise adverse environmental impact on other properties and the road’s users, including dust and noise emissions. Any conflict between the development and an existing or proposed service must be referred to the relevant service authority for determination prior to commencement of works. DURING CONSTRUCTION Engineering The integrity and condition of any existing public or Council infrastructure and services (above ground and/or underground) must not be adversely affected by the proposed works. The developer must meet any costs to repair damage to any Council asset during construction, where damage is a result of the development works. Damage to assets must be repaired immediately where it creates a hazard to the community. In circumstances where the damage does not create a hazard to the community, it must be repaired immediately on completion of the works associated with the development. All works must be constructed and work procedure undertaken in accordance with: The approved plans and conditions detailed in this Decision Notice. All relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines. The latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site. Works within Road Reserves Any removal of any existing trees within the road reserve is not permitted without Council’s prior written approval. Safe pedestrian access on all streets in the vicinity of the development must be maintained at all times. Should footpath/road closures be necessary to carry out construction works, Council’s Engineering Officer must be notified prior to the proposed closure and all requirements complied with. All works must match neatly with existing road and verge/footpath features. Additional works beyond the frontage may be required to provide an acceptable transition to existing road and verge/footpath profiles. Driveways Driveway crossover must be constructed generally in accordance with the current IPWEA standard drawing RS-051, Type A. The following must be complied with during the construction of the required crossover/driveway: The crossover maximum widths of 5.0m at the boundary line and 6.5 at kerb line. The driveway surfacing must consist of either an approved hot mixed asphaltic concrete or patterned/plain concrete. The driveway must be in accordance with the requirements of AS2890.1 Off-Street Car Parking for longitudinal and crossfall gradients. The driveway must be constructed so as to not cause ponding on, or direct stormwater runoff onto neighbouring properties. Where required, underground service conduits for water supply, electricity and any other services must be provided as part of the access driveway. Have a minimum clearance of 500mm from any Unitywater/Energex/Telstra asset, unless a written approval is obtained from Unitywater/Energex/Telstra and submitted to Council. Any stormwater kerb outlet in close proximity to the edge of the new driveway must be provided with an approved kerb adaptor. Any existing kerb sections requiring removal due to the works must be saw-cut and removed to allow for a smooth and neat finish with the new driveway. Any existing unnecessary or redundant property accesses must be removed, and the kerb, footpath and verge area reinstated to match the existing footpath and/or verge treatments. Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed or turf, and must be maintained by the developer until established. Pavement design for privately owned works must be undertaken in accordance with the relevant standards. Structural integrity of the driveway and car park areas will remain the responsibility of the property owner/developer. Stormwater Drainage The constructed driveway must not cause additional ponding on the road formation, the grassed verge or any adjoining property. Any proposed surface drainage grate or channel must be located wholly within private property. Environment - Erosion and Sediment Control Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994) must not be released from the site or to waters within the site, or be likely to be released should rainfall occur, unless all reasonable and practicable measures are taken to prevent or minimise the release and concentration of contamination. The contractor must ensure non-essential exposure of soil is prevented by restricting the extent of works and minimising the duration of soil exposure to adverse weather conditions. Exposed areas must be suitably covered/stabilised/reinstated as soon as practicable and prior to any predicted rainfall occurring. Erosion and sediment control measures must be installed and maintained to minimise erosion on the site and to minimise the export of sediment and associated pollutants from the site. The erosion and sediment control measures must be designed, installed and maintained in accordance with current best practice standards (refer to advisory notes). FOLLOWING CONSTRUCTION Upon completion of the work a certificate must be issued by an RPEQ or a suitably qualified person certifying that the works have been constructed in accordance with the requirements of this Operational Works permit. A final inspection and approval of the new driveway and completed reinstatement works by Council’s Inspector is required. Please contact Council on 5329 6245 to arrange for the inspection. referral agencies Not applicable. Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: General Advisory Notes As this driveway is a private structure, the owner/developer bears full responsibly for the standard of its construction, maintenance and any liabilities associated with its construction. It is recommended that professional advice be sought for the construction of the driveway to ensure that the driveway is constructed in accordance with the applicable standard drawing and engineering standards. Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time. Prestart Inspections Request Contact Council on 5329 6245 to arrange a prestart or an inspection giving a minimum of 5 business days notice of preferred inspection time. It should be noted prior to arranging a pre-start meeting the Appeal Period of 20 business days must have passed or the applicant must have provided Council with written confirmation that the applicant has accepted the conditions of Decision Notice and waived their appeal rights. If Council officers are required to undertake additional inspections of the same works, a reinspection fee will be applicable in accordance with Council’s Fees and Charges register applicable at the time. Environmental Advisory Notes The Environmental Protection Act 1994 states that a person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmental harm includes environmental nuisance. In this regard persons and entities, involved in the civil, earthworks, construction and landscaping phases of this development are to adhere to their ‘general environmental duty’ to minimise the risk of causing environmental harm. Erosion and Sediment Control Accepted best practice standards include: The Sunshine Coast Regional Council Manual for Erosion and Sediment Control V1.2 or other superseding document subsequently adopted by Council; Best Practice Erosion and Sediment Control, International Erosion Control Association (2008). property notes Not applicable. VARIATION approval details Not applicable. further development permits required Not applicable. submissions Not applicable. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. OTHER DETAILS If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. [word/footer1.xml] Page 2 of 6 [word/header1.xml] 3 [word/header2.xml] DEVELOPMENT ASSESSMENT DELEGATED REPORT
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Delegated Report - Code - Planning OPW19 0168.docx)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.