Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Approved Plans MCU20/0127 & OPW20/0211

of 19

Page text shows just the words. Original shows the document exactly as it was published.

Very large file: it may take a few minutes

The original of this document is very large (10.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 12, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                                                                                                                       SECTION            Y
                                                                                                                                                                                                                       SCALE 1:40 (A3)   C001
           TYPICAL BIORETENTION BASIN AND OVERFLOW PIT DETAIL
                                                             SCALE 1:40 (A3)

                                                                                                                           TYPICAL BIORETENTION CLEANOUT DETAIL
                                                                                                                                           SCALE 1:40 (A3)




                                              290




                              BIORETENTION BASIN
                        This bioretention basin reduces the pollution of
                          our waterways by reducing the amount of
                          heavy metals, litter, suspended solids, and
                                                                                210




                         nutrients discharged to the nearby waterway.




                                                                                                                                                                                                                                                 SCALE 1:40 (A3)


                        BIORETENTION EDUCATION SIGN                                                                                                          SECTION            X
            TO BE FIXED USING S/S SCREWS TO POST OR FENCE AT EACH BIORETENTION BASIN IN                                                                                                                                                          SCALE 1:200 (A3)
                                                                                                                                                             SCALE 1:40 (A3)   C001                                -
                                                                                                                                                                                                           NOOSA COUNCIL
                          A PUBLIC AREA OR VISIBLE TO PUBLIC FROM FOOTPATH

                                                                                                                                                                                                           APPROVED PLAN
                                           NOT TO SCALE

                                                                                                                                                                                                        MCU20/0127 & OPW20/0211
                                                                                                                                                                                                              6 April 2021




                                                                         SECTION THROUGH DRIVEWAY - WESTERN SIDE (EASTERN SIDE DIFFERS)




                                                                                                    Consulting Civil &                                                                PROPOSED INDUSTRIAL                                       192297              C300
                                                                                                    Structural Engineers                  STORMWATER DETAILS                          COMPLEX                11 LEO ALLEY ROAD,                                       C
                                                                                                    Project Management                                                                DEVCON CAPITAL 9 PTY   NOOSAVILLE
                           APPROVAL                                                                 & Planning                                                                        LTD
                                              Issue Date          Description             By

Document Set ID: 21403808
Version: 1, Version Date: 25/02/2021
Log in to download the original file

Approved Plans MCU20_0127 & OPW20_0211.pdf · 10.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.