Attached to the e-mail Visitor Accommodation Type 4 Conventional - 122 beds (Engineering Report, Economic Study, Geotechnical Investigation, Flood Certificate, Accoustic Report, Management Plan) MCU18/0102.msg.
The access ramp to the basement carpark will be exposed to the weather and therefore run off from
the ramp will need to be collected and disposed of. It is proposed to install a grated drain at the base of
the ramp to collect runoff. This will be discharged into a sealed storage tank and pump below the
basement car park which would be set up to pump to the street during a rainfall event. It is necessary
to have a sealed collection tank instead of a soak away pit due to the groundwater levels for the site
being above the basement level. A soak away drain located at the basement level connected to the
grated drain would, at times, act in reverse and allow ground water into the basement. (Refer Geotech
report). The catchment area of the ramp is approximately 84m2, so a 2500 litre tank would also provide
emergency storage for the equivalent of a 30mm rainfall in the event of a power failure. In an extreme
event, coinciding with a power failure, the basement area would offer additional storage capacity. For
example, if 500mm of rain was to fall with power being off, the depth of water accumulating in the
basement would be only 53mm in depth. To put this in perspective, data from the Bureau of
Meteorology indicates that the maximum daily rainfall recorded at Tewantin was 310mm in August
2007 – refer attached. The grated drain, storage tank and pump system would also be able to dewater
the basement area once the power was restored. It should be noted that the storage tank and pump is
not required to keep flood waters out of the basement.
3. Acid Sulphate Investigation and Management
Please refer to the separate report prepared by Core Consultants.
4. Stormwater Management
4.1. Existing network and legal point of discharge
Stormwater from the site would need to be piped to the street and discharged to the kerb and channel
using kerb adaptors as there is no existing stormwater pits in front of the development site to connect
to. The nearest stormwater pit is located approximately 40m to the east. An inspection of this pit has
identified that the invert level is less than 1.0m below the road surface. Based on minimum allowable
pipe grades and sizes, and existing road levels there would insufficient cover if a pipe was extended
from this pit to the closest point in front of the development site. Note the existing kerb and channel
has a grade of less than 0.5% and falls both east and west from the area in front of the site. ie the site
is located at the crest of the road. The discharge from the site would therefore be split to the east and
west side of the building and discharged to the street at both sides of the property. The reception area
roof area could be separately piped directly to the kerb and channel. The number of discharge points
can be determined during the detailed design of the building hydraulic plans.
4.2. Stormwater Quantity
The existing building and concrete pavement areas on the site have a combined area of 875m2. In
addition to this there is over 1080m2 of unsealed compacted gravel hardstand parking area surrounding
the existing building – this is best viewed in the 2015 aerial photo. Refer marked up aerial plan below
showing these areas. Given the nature of this hardstand pavement we believe that, conservatively,
50% of this area can be included in the impervious area of the existing site. As such the total impervious
area for the existing site is effectively 1415m2. The proposed development includes buildings and
impervious (paved areas) totalling 1433m2. Note the drying area on east side of building will be either
permeable paving or turfed. As there is only a minor increase in the impervious area we contend that
on-site detention is not necessary.
2
17699 - Bounce Hostel, 16 Mary Street Noosaville – Engineering Report – Rev A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.