5.       Car park and Service Vehicle access

     The ramp to the basement car park is shown on architectural drawing DA.06 by Zest Building Design.
     Tod consulting have checked the longitudinal grades and grade changes and confirm that the ramp
     meets the requirements of AS2890.1.2004 and Council standard drawing IPWEAQ RS-50. The car
     park layout shown on preliminary architectural drawing DA-03 provides car parking spaces that exceed
     the requirements of AS2890.1 for a user class 2 car park.

     Architectural Drawing DA01 by Zest shows the proposed service bay area on the eastern side of the
     site fronting Mary Street. Attached is a swept path diagram showing proposed movements for a service
     vehicle into and out of this space. Ref 17699-SK001. This diagram demonstrates that a service vehicle
     can enter and exit the site in a forward motion.



6.       Existing Sewer

     As noted in the introduction a 450 diameter trunk sewer crosses the site approximately 13m from the
     rear boundary. The sewer is currently 2.5 to 2.8m below existing surface levels but as a result of the
     higher floor levels required (as noted in section 2) the sewer will ultimately be over 3.0m deep.
     Discussions with Unitywater have confirmed that for a 3m deep sewer they require the proposed
     buildings to be set back a minimum of 3m from the centreline of the sewer and founded below the zone
     of influence. Architectural concept drawings have been amended to reflect this requirement. Structural
     drawings will be prepared as part of the detailed design.

7.       Conclusion

     We believe that this report demonstrates that the engineering aspects of the proposed development
     can be successfully and suitably managed, and as such we seek Councils support for the development
     application.


     Prepared by



     Doug Reynolds (RPEQ 9072)
     Tod Consulting Pty Ltd
     28 March 2018




                                                                                                         6
     17699 - Bounce Hostel, 16 Mary Street Noosaville – Engineering Report – Rev A
Log in to download the original file

Appendix F Engineering Report - 14-16 Mary Street, Noosaville - Bounce Hostels 15.6.2018.pdf · 3.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.