Original source · versioned page text
7. DA Approval - TPC2378
Town Planning Consent Permit TPC 2378 The open space and setback areas are to be landscaped in accordance with Council's Policy on Landscaping Guidelines and a properly prepared landscape plan to be submitted to and approved by the Shire Planner, prior to the issue of a Building Approval. Such landscaping is to be completed in accordance with the approved landscape plan, prior to the premises being occupied and maintained at all times thereafter to the reasonable satisfaction of the Shire Planner. Existing trees on the site and within road reserves are to be retained, except where required to be removed due to building operations or the conduct of the approved use. The landscape plans referred to above are to denote areas of existing vegetation or existing trees proposed to be retained. Construction work and other associated activities are permitted only during the hours of 7.00 a.m. to 6.00 p.m. Monday to Saturday. No work is permitted on public holidays, except where extended hours are approved by the Building Surveyor. Payment of contributions in accordance with Council's Policy on Water Supply and Sewerage Headworks, current at the time of Building Approval. An estimate only of the charges as at February, 1991 under the current policy is as follows:- Water Supply - $1,406 Sewerage - $1,990 TOTAL: $3,396 Please note that the headworks charges will alter in accordance with Price Index variations or if any amendment is made to Council's policy. If payment is not proposed to be made prior to the issue of Building Approval, a cash bond or trading bank guarantee for the required amount is to be lodged, prior to the release of that Approval. The contribution is then required to be made within fourteen (14) days of the issue of Building Approval. Disposal of septic and sullage wastes on site to the satisfaction of the Shire Engineer. Plans prepared by a registered Hydraulics Consultant are to be submitted to and approved by Council's Building Surveyor, prior to the issue of a Building Approval.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.