Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Appendix H - Engineering Services Report Part 2 of 2

Attached to the e-mail MCU14/0083 Appendices.

of 11

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                                                            MOGPROPMANAGEMENT PTY LTD
                                                                                                                LOT 102 SP241371 GATEWAY DRIVE, NOOSAVILLE
                                                                                                                               CIVIL WORKS
                                                                                                                                                                                                                                        Bunnings Warehouse




                                                                                                                                                                               E
                                                                                                                                                                            AY DRIV
                                                                                                                                                  Officeworks
                                                                                                                                                                                                                                                                                                                                                                                  DRAWING INDEX



                                                                                                                                                                          GATEW
                                                                                                                                                                                                          NE                                                                                                                                                       DRAWING NUMBER REVISION DRAWING DESCRIPTION
                                                                                                                                                                                                            WR                                                                                                                                                                  205-002-C01.01                    1                 DRAWING INDEX & LOCALITY
                                                                                                                                                                                                                      OA
                                                                                                                                                                                                                           D                                                                                                                                                    205-002-C02.01                    1                  EXISTING FEATURES PLAN
                                                                                                                                                                                                                                                                                                                                                                                205-002-C03.01                    1                    OVERALL LAYOUT PLAN
                                                                                                                                                                                                                                                                                                                                                                                205-002-C04.01                    1                     EARTHWORKS PLAN
                                                                                                                                                                                                                                                                                                                                                                                205-002-C10.01                    1                   DRAINAGE LAYOUT PLAN
                                                                                                                                                                                                                                                                                                                                                                                205-002-C11.01                    1              DRAINAGE LONGITUDINAL SECTION
                                                                                                                                                                                                                                                                                                                                                                                205-002-C13.01                    1                 DRAINAGE CATCHMENT PLAN
                                                                                                                                                                                                                                                                                                                                                                                205-002-C14.01                    1                  DRAINAGE CALCULATIONS
                                                                                                                                                                                                                                                                                                                                                                                205-002-C18.01                    1             EROSION & SEDIMENT CONTROL PLAN
                                                                                                                                                                                                                                           OAD
                                                                                                                                                                                                                              OS     AR                                                                                                                                         205-002-C19.01                    1           TURNING PATHS - 12.5m SINGLE UNIT TRUCK
                                                                                                                                                      LOCATION OF WORKS                                                  I NO                                                                                                                                                   205-002-C20.01                    1                     SITE DISTANCE PLAN
                                                                                                                                                                                                                 UND
                                                                                                                                                                                                         EUM


                                                                                                                                                                                                                                                                                                                                                                   GENERAL NOTES
                                                                                                                                                                                                                                                                                                                                                                   1.        These drawings shall be read in conjunction with the specifications, other consultants drawings
                                                                                                                                                                                                                                                                                                                                                                             and specifications, and all authority standard drawings and specifications.
                                                                                                                                                                                                                                                                                                                                                                   2.        Before proceeding with the work any discrepancies in the contract documents shall be referred
W:\205 Mogprop Management\205 002 MCU Gateway Dve Noosaville\Drawings\205-002-WORKING.dwg




                                                                                                                                                                                                                                                       REN                                                                                                                   for decision to the Superintendent.
                                                                                                                                                                                                                                                                                                                                                                   3.        All dimensions are in meters unless otherwise shown.
                                                                                                                                                                                                                                                                                                                                                                   4.        Do not scale from drawings, if in doubt, ASK!!
                                                                                                                                                                                                                                                          ESTR

                                                                                                                                                                                                                                                                                                                                                                   5.        The contractor shall verify all locations of services, prior to construction. The contractor is
                                                                                                                                                                                                                                                                                                                                                                             responsible for the costs involved in the protection and the repair of any damaged services as a
                                                                                                                                                                                                                                                              EET



                                                                                                                                                                                                                                                                                                                                                                             result of the work.
                                                                                                                                                                                                                                                                                                                                                                   6.        All materials and workmanship shall be in accordance with the Queensland Department of Main
                                                                                                                                                                                                                                                                                                                                                                             Roads Standard Specifications and the Local Authority's Requirements.
                                                                                                                                                                                                                                                                                                                                                                   7.        The contractor shall prepare a workplace health and safety plan for the project and shall not
                                                                                                                                                                                                                                                                                                                                                                             commence work until it is complete and evidence of such has been provided to the
                                                                                                                                                                                                                                                                                                                                                                             Superintendent.
                                                                                                                                                                          LOCALITY PLAN                                                                                                                                                                            8.        The contractor shall not commence works until all required insurances are in place and evidence
                                                                                                                                                                                  SCALE: 1:1000                                                                                                                                                                              of such has been provided to the Superintendent.
                                                                                                                                                                                                                                                                                                                                                                   9.        The contractor shall be responsible for notifying all relevant authorities before commencing
                                                                                                                                                                                                                                                                                                                                                                             work. Works shall not commence until a pre-start meeting is held with Council Officers.
                                                                                                                                                                                                                                                                                                                                                                   10.       Where traffic management is required as part of the works the contractor shall submit a traffic
                                                                                                                                                                                                                                                                                                PROPERTY DESCRIPTION                                                         management plan for approval by the superintendent prior to commencing work.
                                                                                                                                                                                                                                                                                                                                                                   11.       All environmental weeds shall be removed from the site.
                                                                                                                                                                                                                                                                                                  Lot 102 on SP241371                                              12.       All trees that are removed shall be mulched. The mulch shall be stockpiled on site for use in
                                                                                                                                                                                                                                                                                                                                                                             erosion and sediment control or landscaping.
                                                                                                                                                                                                                                                                                                                                                                   13.       All levels are AHD.                                                          PRELIMINARY ISSUE
                                                                                                                                                       CLIENT                                                                                                                                                          APPROVED                              SCALE
                                                                                                                                                                                                                                                                                                                                                                                                                   LOT 102 SP241371 GATEWAY DRIVE, NOOSAVILLE
                                                                                                                                                           MOGPROP                                                                                                                                                                                            1:1000     0     10   20   30   40   50   60   A1
                                                                                            PROJECT MANAGEMENT - ENGINEERING - PLANNING
                                                                                                                                                       MANAGEMENT PTY LTD                                                                                                                                                                                     1:2000                                         A3                     DRAWING INDEX & LOCALITY
                                                                                            SUNSHINE COAST      MACKAY           CAIRNS                                                                                                                                                                                RPEQ
                                                                                            (07) 5493 3649      (07) 4957 4988   (07) 4041 5118                                        1     PRELIMINARY ISSUE                                                    07/08/14      RH         KP        JB        ----                                                                                               DRAWING NUMBER                                        REVISION

                                                                                            projexpartners.com.au                                                                     No.                              Description                                  Date       Drawn     Design    Check     RPEQ                                                                                                                     205-002-C01.01                         1
                                                                                                                                                                                      THIS DRAWING MAY ONLY BE USED FOR THE PURPOSE FOR WHICH IT WAS PREPARED BY PARTIES AGREED TO BY PROJEX PARTNERS & MUST NOT BE USED BY ANYONE ELSE OR FOR ANY OTHER PURPOSE
Log in to download the original file

Appendix H - Engineering Services Report Part 2 of 2.pdf · 1.7 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.