Appendix H - Engineering Services Report Part 2 of 2
Attached to the e-mail MCU14/0083 Appendices.
DRAINAGE CATCHMENT LEGEND
255.5 New Contours
New Drainage Pipe
Catchment Areas
Gully Pit, Field Inlet,
Manhole, Headwall
New Pit No./Line No.
Existing Stormwater Pipe
BUNNINGS WAREHOUSE
255.5 Existing Contours
SHOPPING PRECINCT
NEW R CATCHMENT AREA TABLE
OAD
VE
18.0 CATCHMENT AREA
17
DRI
C1 0.0101 Ha
.5
17
.0
C2 0.0097 Ha
Y
.5 C3 0.0084 Ha
EWA
1818.5
C4 0.0561 Ha
18.5 54.
9
C5 0.0386 Ha
GAT
C3
C2
C1 50
.0
17.0
19
45.0
.0
40.0
35.0
17
30.0
25.0
.5
19.0
0.0
20.0
5.0
15.0
10.0
18
18
.0
.5
19.5
C4
C5
20.0
19.5
W:\205 Mogprop Management\205 002 MCU Gateway Dve Noosaville\Drawings\205-002-WORKING.dwg
20.0
19.5
ROAD
D I NOOSA
EUMUN
CATCHMENT AREAS
SCALE 1:1000 (A3) PRELIMINARY ISSUE
CLIENT APPROVED SCALE
LOT 102 SP241371 GATEWAY DRIVE, NOOSAVILLE
MOGPROP 1:250 0 5 10 15 A1
PROJECT MANAGEMENT - ENGINEERING - PLANNING
MANAGEMENT PTY LTD 1:500 A3 DRAINAGE CATCHMENT PLAN
SUNSHINE COAST MACKAY CAIRNS RPEQ
(07) 5493 3649 (07) 4957 4988 (07) 4041 5118 1 PRELIMINARY ISSUE 07/08/14 RH KP JB ---- DRAWING NUMBER REVISION
projexpartners.com.au No. Description Date Drawn Design Check RPEQ 205-002-C13.01 1
THIS DRAWING MAY ONLY BE USED FOR THE PURPOSE FOR WHICH IT WAS PREPARED BY PARTIES AGREED TO BY PROJEX PARTNERS & MUST NOT BE USED BY ANYONE ELSE OR FOR ANY OTHER PURPOSE