Original source · versioned page text
2016-04-28 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 28 APRIL 2016
B. Approve application No. REC15/0022 for Reconfiguring a Lot (1 Lot into 2 Lots &
Access Easement), subject to the following conditions:
When Conditions Must Be Complied With
1. Unless otherwise stated, all works required by the conditions of this Decision
Notice must be completed prior to submission of the subdivision plan to Council
for compliance assessment.
Approved Lot Reconfiguration Plan
2. The lot reconfiguration shall be carried out generally in accordance with approved
plan No. 3049PROP titled Proposed Subdivision Lots 1 & 2 and Emt E in Lot 1
Cancelling Lot 30 on SP170751 123 Eumundi Road Noosaville by John Dawson
Surveys Pty Ltd and dated 18/9/2015, subject to the following amendment:
a. 2.0m x 2.0m truncation for the proposed dividing boundaries near the
southeast corner of the proposed access handle.
3. All lot numbering on the subdivision plan to be submitted to Council for
compliance assessment must remain as shown on the Approved Plans.
4. The development must be undertaken and operated in a manner that causes no
detrimental effect upon the amenity of the neighbourhood by reason of the
creation of excessive noise, lighting nuisance or other emissions.
Easements
5. Unless otherwise agreed in writing by the relevant service provider, any public or
third party infrastructure located on the subject site must be placed within an
easement registered against the title of the property.
6. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the Grantee’s
standard easement terms. Draft easement documentation must be submitted to
Council for endorsement.
7. All works must be kept clear of any existing or proposed easements on the
subject land, unless agreed otherwise in writing by the Grantee.
Vehicle Access
8. All vehicle access to proposed Lots 1 and 2 must be via the proposed access
easement and a single shared access driveway in Eumundi Noosa Road. The
driveway must be located generally in the same location as the existing driveway.
Stormwater
9. The site must be provided with a stormwater drainage system connecting to a
lawful point of discharge. The works must be undertaken in accordance with an
Operational Works approval, and must include:
9.1. Stormwater system designed and constructed in accordance with Council’s
Planning Scheme Policy 5 – Engineering Design Standards – Roads,
Drainage and Earthworks
9.2. No adverse impact on other properties and the road’s footpath and grassed
verge (eg by diverting flows and/or blocking flows and causing additional
ponding)
9.3. Where applicable, extension of the site stormwater system to
accommodate stormwater from external site, including registration of
drainage easements
Page 9 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.