INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 21 JULY 2015
COMMUNITY SERVICES DEPARTMENT
SECTION RECENT ACHIEVEMENTS CURRENT PRIORITIES LOOKING AHEAD
Waste Management Development of the 2015/2016 Development of a draft 5 year Capital Finalisation of the Towards Zero Waste
Waste Management Budget. Works program. Strategy following consideration of the
Responding to requests for Removal of stormwater accumulated Community Jury deliberations.
information from the Community Jury. in Cell 2.2 Eumundi Rd Landfill. Finalisation of the Business Continuity
Completed concrete crushing of a large Delivery of Annual Kerbside Bulk Waste Plan
stockpile of concrete. Collection Service commencing in Tendering the 2015/16 Capital Works
Called an RFQ for the collection of August. Program.
hazardous chemicals collected at Waste Include separate mattress collection Preparation of new Waste Management
Transfer Stations and Eumundi Rd service in annual bulk kerbside service Contract.
landfill. Reporting to Council on Commencing development of Asset
Improved monitoring of methane at the Recommendations of the Community Management Plan.
th
landfill and recapped small areas where Jury received 15 July 2015. Develop In-house Waste Education
methane is escaping from capped areas Reviewing the Provisions fund for future Campaign.
due to dry conditions. landfill costs with Michael Shave. Preparing for the use of the first section
Secured a contractor to mulch Reviewing the current waste of cell 2.2 at Landfill approx. Dec 2015.
accumulation of green waste due to management contract with Cleanaway
absence of contractor in north and compliance conditions at landfill.
Queensland following tropical cyclone. Reviewing quotations for the collection
Extension of the Green waste mulching and removal of Hazardous waste.
contract with ARG.
Attendance at presentation by JFE
Technologies (Japan) with Unitywater -
advanced waste treatment and energy
recovery options.
Implemented weekly landfill audit
inspections with Cleanaway.
Substantially completed capital project
Sedimentation Pond upgrade and Bio
Basin
Prepared Emergency Debris Storage &
Disposal Sub Plan for Noosa Disaster
Management Plan
Page 18 of 48
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.