OPW16/0125 - SARA Concurrence
Our reference: SPL-0516-030663 30 May 2016 Baguba Pty Ltd C/- Superior Approvals PO BOX 920 [email protected] Dear Sir/ Madam Concurrence agency response before application is made—with conditions 26 Noosa Parade, Noosa Heads (Lot 12 on N21841) (Related to section 271 and given under section 285 of the Sustainable Planning Act 2009) Reference is made to your correspondence dated 26 May 2016 requesting the Department of Infrastructure, Local Government and Planning provide a referral agency response for the proposed development before the development application is made to the assessment manager. Applicant details Applicant name: Baguba Pty Ltd Applicant contact details: C/- Superior Approvals PO Box 920 [email protected] Site details Street address: 26 Noosa Parade, Noosa Heads QLD 4567 Real property description: Lot 12 on N21841 Local government area: Sunshine Coast Regional Council Application details Proposed development: Development Permit for Operational Work- Tidal Works (Pontoon for private use) Page 1 SEQ North Region Level 8, Mike Ahern Building 12 First Avenue PO Box 1129 Maroochydore QLD 4558
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 6 pages
Page 2
SPL-0516-030663
Aspects of development and type of approval being sought
Nature of Brief Proposal of
Approval Type Level of Assessment
Development Description
Operational Work – Tidal
Operational Work Development Permit Works (Pontoon for private Code Assessment
use)
Referral triggers
The development application would be referred to the department under the following
provisions of the Sustainable Planning Regulation 2009:
Referral trigger: Schedule 7, Table 2, Item 15 — Tidal Works
Schedule 7, Table 2, Item 13 — Tidal Works
Documents supplied to support request
Version and
Plan / Report title Author Reference no.
date
Site Plan, Elevation and Superior Jetties 13441 D01
General Notes 13/04/2016
Conditions
Under section 287(1) (a) of the Sustainable Planning Act 2009, the department requires
that the conditions set out in Attachment 1 attach to any development approval.
Reasons for decision to impose conditions
Under section 289(1) of the Sustainable Planning Act 2009, the department is required to
set out the reasons for the decision to impose conditions. These reasons are set out in
Attachment 2.
Pursuant to section 272(3) of the Sustainable Planning Act 2009, you will not be required to
refer your application to the department if you submit this response in its entirety when
making the application to the assessment manager, and the following conditions are
satisfied:
Any changes to the proposal before the application is made to the assessment manager
do not result in a substantially different development to that which was presented to the
department with the request for a referral agency response
The development application must be made to the assessment manager within 12
months of the date of this referral agency response.
If you require any further information, please contact Gabriel Escobar, Planning Officer, on
3432 2408 or via email [email protected] who will be pleased to assist.
Department of Infrastructure, Local Government and Planning Page.2
Page 3
SPL-0516-030663
Yours sincerely
Garth Nolan
Manager Planning
enc: Attachment 1—Conditions to be imposed
Attachment 2—Reasons for decision to impose conditions
Attachment 3—Approved plans and specifications
Department of Infrastructure, Local Government and Planning Page.3
Page 4
SPL-0516-030663
Our reference: SPL-0516-030663
Attachment 1—Conditions to be imposed
No. Conditions Condition timing
Development Permit for Operational Work- Pontoon and Deck
Schedule 7, Table 2, Item 15 – Pursuant to section 255D of the Sustainable Planning Act
2009, the chief executive administering the Sustainable Planning Act 2009 nominates the
Director-General of the Department of Department of Transport and Main Roads to be the
assessing authority for the development to which this development approval relates for the
administration and enforcement of any matter relating to the following condition(s):
General
The development must be carried out generally in
accordance with the following plans:
1. At all times
Site Plan, Elevation and General Notes Superior
Jetties, 13/04/2016, 13441.
Tidal Works
The structure must be lit/marked in accordance with the
following specifications, such that it does not cause a risk to
1. the safe navigation of other ships: At all times
section 3 of AS4282-1997 Control of the obtrusive
effects of outdoor lighting
The construction, operation or maintenance of the structure,
and any ship berthed, moored or attached to the structure,
must not:
2. At all times
encroach into, pass over or under a navigation
corridor; or
be located in a high risk maritime zone
Any debris or similar obstruction generated whilst
While works are
3. undertaking the work must be removed from the waterway
occurring
and suitably disposed of at the applicant’s expense.
Prior to the
All piles and/or structures to be demolished, both above
completion of the
4. and below the waterline must be completely
works
extracted/removed.
Schedule 7, Table 2, Item 13 – Pursuant to section 255D of the Sustainable Planning Act
2009, the chief executive administering the Sustainable Planning Act 2009 nominates the
Director-General of the Department of the Department of Environment and Heritage
Protection to be the assessing authority for the development to which this development
approval relates for the administration and enforcement of any matter relating to the
following condition(s):
All works to be constructed and maintained in a safe
condition in accordance with the plans/drawings listed on
5. At all times
the Owner’s consent notice provided by the Department of
Environment and Heritage Protection
Department of Infrastructure, Local Government and Planning Page 4
Page 5
SPL-0516-030663
No. Conditions Condition timing
The works to which this approval relates are to be for a
6. At all times
private purpose only.
Any operator and contractor involved in the works to which
this approval relates must:
a) be provided a copy of the these referral agency
conditions; During
7.
b) install all measures, plant and equipment necessary construction
to ensure compliance with the conditions; and
c) operate such measures, plant and equipment in a
proper and efficient manner.
For the proposed works only use materials which are free
During
8. from contaminants as defined under section 11 of the
construction
Environmental Protection Act 1994.
Should the works become damaged as a result of erosion,
flooding or storm tide inundation, the registered
9. At all times
landowner(s) of the subject land shall be responsible for the
removal of all debris at their own expense.
Department of Infrastructure, Local Government and Planning Page 5
Page 6
SPL-0516-030663 Our reference: SPL-0516-030663 Attachment 2—Reasons for decision to impose conditions The reasons for this decision are: To ensure the development is carried out generally in accordance with the plans of development submitted with the application To ensure that at all times, all lights on or above the development site do not interfere with safe navigation in surrounding waterways. To ensure the development does not encroach on the navigation corridor or high risk maritime zone to ensure the safe passage of vessels. To ensure that debris from the development does not create a hazard to navigation. To ensure that there is no residual material that could create a hazard to navigation. Development works must comply with the approved plans to avoid unacceptable impact on coastal values and physical coastal processes. RPEQ signoff indicates the development is appropriately designed and is structurally sound. Ensures that the coastal resource (State land) is appropriately administered under the Coastal Protection and Management Act 1995 and the Land Act 1994. Ensures impacts on coastal values (water quality) are avoided or minimised. Ensures importation of materials does not result in adverse impacts on coastal values. Chemical and other contaminants have the potential to have an unacceptable impact on coastal values. Damaged structures can impact on coastal resources and public safety. Department of Infrastructure, Local Government and Planning Page 6
Page 7
SPL-0516-030663 Our reference: SPL-0516-030663 Attachment 3— Approved plans and specifications Department of Infrastructure, Local Government and Planning Page 7
Used in these records
OPW16/0125 - SARA Concurrence.pdfRelated documentApplication case desk ↗
About this file
- File size
- 247 KB (small file)
- File type
No other editions are linked here.