OPW16/0125 - SARA Concurrence
SPL-0516-030663
Our reference: SPL-0516-030663
Attachment 1—Conditions to be imposed
No. Conditions Condition timing
Development Permit for Operational Work- Pontoon and Deck
Schedule 7, Table 2, Item 15 – Pursuant to section 255D of the Sustainable Planning Act
2009, the chief executive administering the Sustainable Planning Act 2009 nominates the
Director-General of the Department of Department of Transport and Main Roads to be the
assessing authority for the development to which this development approval relates for the
administration and enforcement of any matter relating to the following condition(s):
General
The development must be carried out generally in
accordance with the following plans:
1. At all times
Site Plan, Elevation and General Notes Superior
Jetties, 13/04/2016, 13441.
Tidal Works
The structure must be lit/marked in accordance with the
following specifications, such that it does not cause a risk to
1. the safe navigation of other ships: At all times
section 3 of AS4282-1997 Control of the obtrusive
effects of outdoor lighting
The construction, operation or maintenance of the structure,
and any ship berthed, moored or attached to the structure,
must not:
2. At all times
encroach into, pass over or under a navigation
corridor; or
be located in a high risk maritime zone
Any debris or similar obstruction generated whilst
While works are
3. undertaking the work must be removed from the waterway
occurring
and suitably disposed of at the applicant’s expense.
Prior to the
All piles and/or structures to be demolished, both above
completion of the
4. and below the waterline must be completely
works
extracted/removed.
Schedule 7, Table 2, Item 13 – Pursuant to section 255D of the Sustainable Planning Act
2009, the chief executive administering the Sustainable Planning Act 2009 nominates the
Director-General of the Department of the Department of Environment and Heritage
Protection to be the assessing authority for the development to which this development
approval relates for the administration and enforcement of any matter relating to the
following condition(s):
All works to be constructed and maintained in a safe
condition in accordance with the plans/drawings listed on
5. At all times
the Owner’s consent notice provided by the Department of
Environment and Heritage Protection
Department of Infrastructure, Local Government and Planning Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW16/0125 - SARA Concurrence.pdfRelated documentApplication case desk ↗
About this file
- File size
- 247 KB (small file)
- File type
No other editions are linked here.