Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2014-12-18 Ordinary Meeting Minutes

of 58

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                   MINUTES


          Ordinary Meeting

      Thursday, 18 December 2014

                  commencing at 6pm
        Council Chambers, 9 Pelican Street, Tewantin




Crs Noel Playford (Chair), Bob Abbot, Sandy Bolton, Joe Jurisevic,
Frank Pardon, Tony Wellington, Frank Wilkie
Log in to download the original file

2014-12-18 Ordinary Meeting Minutes(PDF, 557KB).pdf · 570 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 57 sections

Section 2

ORDINARY MEETING MINUTES                                                   18 DECEMBER 2014



1   ATTENDANCE & APOLOGIES

    COUNCILLORS
    Councillor N Playford, Mayor
    Councillor B Abbot
    Councillor S Bolton
    Councillor J Jurisevic
    Councillor F Pardon
    Councillor T Wellington
    Councillor F Wilkie

    EXECUTIVE
    B de Chastel, Chief Executive Officer
    A Rogers, Director Community Services
    M Shave, Director Corporate Services
    M Drydale, Director Planning & Infrastructure
    D Iezzi, Executive Manager


    APOLOGIES
    Nil.


    The meeting commenced at 6.00pm.




2   CONFIRMATION OF MINUTES
    Council Resolution

    Moved:            Cr Bolton
    Seconded:         Cr Pardon

    The Minutes of the Ordinary Meeting held on 20 November 2014 be received and
    confirmed.
                                                                         Carried.


3   MAYORAL MINUTES

    Nil.




4   NOTIFIED MOTIONS

    Nil.




                       This is not an official copy of Council’s Minutes
                                                                                 Page 2 of 58

Section 3

ORDINARY MEETING MINUTES                                                     18 DECEMBER 2014


5    CONSIDERATION OF COMMITTEE RECOMMENDATIONS


INFRASTRUCTURE & SERVICES COMMITTEE RECOMMENDATIONS
9 DECEMBER 2014 - Crs Sandy Bolton (Chair), Bob Abbot, Frank Pardon, Noel Playford
Other Councillors in Attendance: Crs Joe Jurisevic and Frank Wilkie


The Recommendations from the Infrastructure and Services Committee were
adopted without discussion or further amendment.

Council Resolution

Moved:           Cr Pardon
Seconded:        Cr Bolton

The Infrastructure & Services Committee recommendations dated 9 December 2014 be adopted.
                                                                                       Carried.



1    COUNCIL CABS & FLEXILINK SERVICES REVIEW
     Item not dealt with by Infrastructure & Services Committee. Referred to General
     Committee for consideration.
     Reason for referral: Infrastructure & Services Committee requested a further report
     providing more detailed information on costings, eligibility and criteria


2    NOOSA COUNCIL TRAFFIC ADVISORY AND SPEED MANAGEMENT COMMITTEE -
     AUGUST 2014
     That Council note the report by the Design Services Manager to the Infrastructure &
     Services Committee Meeting dated 9 December 2014 detailing the key outcomes of the
     Noosa Traffic Advisory and Speed Management Committee meeting held on 14 August
     2014.


3    NOOSA SOCIAL PLAN 2016-2023 - WAY FORWARD
     That Council note the report by the Community Development Coordinator to the
     Infrastructure & Services Committee Meeting dated 9 December 2014 and
     A.     Agree that work commence on developing a new Noosa Social Plan 2016 -2023
     B.     Approve the proposed membership of the Noosa Social Plan Reference Group as per
            Attachment 1




                         This is not an official copy of Council’s Minutes
                                                                                   Page 3 of 58

Section 4

ORDINARY MEETING MINUTES                                                  18 DECEMBER 2014


4   ANNUAL DISASTER MANAGEMENT REPORT 2014
    That Council note the report by the Director Community Services to the Infrastructure &
    Services Committee dated 9 December 2014 and:
    A.   Appoint members to the Noosa Local Disaster Management Group (LDMG) for 2015
         as set out in Attachment 1; and
    B.   Request the Local Disaster Coordinator in liaison with the Noosa LDMG to develop a
         Noosa Local Disaster Management Plan for adoption by Council prior to 30 June
         2015.


5   WASTE COLLECTION SERVICES POLICY
    Item not dealt with by Infrastructure & Services Committee. Referred to General
    Committee for consideration.
    Reason for referral: Infrastructure & Services Committee requested a further report
    outlining suggested amendments to the Policy



6   WASTE MANAGEMENT CONTRACT 1415T006 AND IMPROVED CHEMICAL DOSING
    AND MONITORING
    That Council note the report by the Manager Waste and Environmental Health and the
    Project Manager to the Infrastructure & Services Committee Meeting dated 9 December
    2014 and
    A.   Award Contract 1415T006 to Sunstate Group Pty Ltd for the lump sum amount of
         $840,510;
    B.   Allocate $175,000 from the Waste Management Reserve to cover the additional
         funding for delivery of contract 1415T006;
    C.   Agree to proceed with the design and construction of improved chemical dosing and
         monitoring equipment for the project, which are outside the scope of Contract
         1415T006, at an estimated cost of $120,000, with costs allocated from the Waste
         Management Reserve; and
    D.   Agree to budget adjustments being made in the next budget review.




                      This is not an official copy of Council’s Minutes
                                                                                Page 4 of 58

Section 5

ORDINARY MEETING MINUTES                                                     18 DECEMBER 2014


PLANNING & ORGANISATION COMMITTEE RECOMMENDATIONS
9 DECEMBER 2014 – Crs. Frank Wilkie (Chair), Joe Jurisevic, Noel Playford,
Tony Wellington
Other Councillors in Attendance: Nil.


The Recommendations from the Planning and Organisation Committee were
adopted without discussion or further amendment.

Council Resolution

Moved:           Cr Wilkie
Seconded:        Cr Wellington

The Planning & Organisation Committee recommendations dated 9 December 2014 be adopted.
                                                                                        Carried.



1    DEVELOPMENT APPLICATION FOR RECONFIGURATION OF 3 LOTS INTO 17 LOTS
     SITUATED AT 55 LAKE MACDONALD DRIVE, COOROY - REC13/0146
     That Council note the report by the Development Planner to the Planning & Organisation
     Committee Meeting dated 9 December 2014 regarding Application No. REC13/0146 for a
     Development Permit for Reconfiguration of a lot (3 lots into 17 lots) situated at 55 Lake
     Macdonald Drive, Cooroy and:
     A.     Grant a Preliminary Approval in accordance with the following conditions:
            PLANNING
            Preliminary Approval
            1.   Prior to the issue of a Development Permit a revised flood strategy must be
                 provided. The flood strategy must demonstrate a non-worsening at the site’s
                 boundaries for rain events up to and including the 1%AEP based on the
                 following:
                 a.    conventional bioretention/detention for the developed portion of the site.
                       The flood strategy must not rely upon increasing floodplain roughness to
                       achieve flood storage requirements
                 b.    modified flood plain storage to offset any impacts created by vegetation
                       rehabilitation and restoration of the western tributary
                 c.    works in the tributary must not include extensive re-profiling and/or
                       armouring of the existing watercourse.
            When Conditions Must Be Complied With
            2.   Unless otherwise stated, all works required by the conditions of this Decision
                 Notice must be completed prior to Council endorsement of the Plan of Survey.
            Approved Plans
            3.   Development undertaken in accordance with this approval must generally
                 comply with the approved plans of development. The approved plans are listed
                 in the following table unless otherwise amended by these conditions.


                         This is not an official copy of Council’s Minutes
                                                                                    Page 5 of 58

Section 6

ORDINARY MEETING MINUTES                                                 18 DECEMBER 2014



              Plan No.       Rev.   Plan, prepared by                               Date
              10-3032AP5B           Plan of Lot Reconfiguration of Lot 5 on         02-07-14
                                    SP266731 & Parts of Lot 137 on MCH978 &
                                    Lot 2 on RP173883 (Stage 3)
              1225-89        A      Revegetation & Rehabilitation Management        1   October
                                    Plan – Eastern Tributary Stage 5 & 6 and as     2014
                                    annotated by Council
        4.   All lot numbering on the subdivision plan to be submitted to Council for
             compliance assessment must remain as shown on the Approved Plans.
        5.   The development must be undertaken and operated in a manner that causes
             no detrimental effect upon the amenity of the neighbourhood by reason of the
             creation of excessive noise, lighting nuisance or other emissions.
        Road & Park Names
        6.   The proposed names of roads and parks must be lodged with the application
             for a Development Permit for Operational Works. Names are to be:
             a.   Relevant to Australian, preferably local, history ,flora, fauna, culture,
                  landscape or physical characteristics;
             b.   If used, personal names should commemorate persons who have
                  contributed significantly to the development of the region; demonstrated
                  outstanding levels of civic service; or achieved role-model status in the
                  wider community or donated property or funds for community benefit; and
                  be recognised in memoriam;
             c.   Park names should be unique within the locality;
             d.   Approval will not be given to a name that may construed as advertising, is
                  more than one word, understanding that a geographic relationship such
                  as Cooroy Mountain is permissible; is insensitive to diverse cultures and
                  does not accord with community standards; and is not concise, easy to
                  pronounce and spell and be without accent marks, apostrophes or
                  hyphens.
        7.   All street signs on new roads (public and private) and parks must be erected
             prior to works being accepted on maintenance.
        Boundary Encroachments
        8.   Certification must be submitted to Council from a Licensed Surveyor which
             certifies that:
             a.   all constructed access and roadworks (including associated fill batters
                  and retaining walls) are fully contained within a dedicated reserve or
                  registered easement
             b.   all utility services and connections (eg. electricity, telecommunications,
                  water, sewerage) are wholly located within the lot they serve or
                  alternatively included within an easement
             c.   all retaining walls and structures are fully contained within the lot they
                  retain
             d.   any fill, including fill batters, are wholly contained within the subject site
                  and not on adjacent properties




                    This is not an official copy of Council’s Minutes
                                                                                  Page 6 of 58

Section 7

ORDINARY MEETING MINUTES                                                     18 DECEMBER 2014


        Water & Sewer Connections
        9.   An underground connection to reticulated water and sewerage must be
             provided to each lot in accordance with the standards and requirements of
             Northern SEQ Distributor–Retailer Authority (Unitywater).
        10.   A Certificate of Completion from the Northern SEQ Distributor–Retailer
              Authority (Unitywater) must be submitted to Council that certifies an
              underground connection to reticulated water and sewerage has been provided
              to each lot.
        Performance Bond
        11. Security in the form of a cash bond or trading bank guarantee to the sum of
             $20,000 must be submitted to Council, to secure performance of all conditions
             of this approval, prior to the issue of a Development Permit for Operational
             Works. The cash bond or trading bank guarantee will be returned on
             performance of the conditions of approval less any costs incurred by Council in
             respect of enforcing performance of this permit. Council reserves the right to
             call upon the bond or guaranteed sum to effect compliance with conditions.
        Landscaping & Ecology
        12.   Landscaping and rehabilitation works must be undertaken in accordance with
              an Operational Works approval and Planning Scheme Policy - PSP 3
              Landscaping Plants and Guidelines. An ecological rehabilitation and
              landscaping plan must be submitted, prepared by a suitably qualified person*
              and must include in particular:
              a.   Western Tributary - the area to be rehabilitated must be generally 10m
                   from the top of bank of the western tributary and the whole of The Noosa
                   Plan’s mapped Riparian Buffer area to the western side of the western
                   tributary.
              b.   Eastern Tributary - the area to be rehabilitated must be generally in
                   accordance with the approved Revegetation & Rehabilitation
                   Management Plan – Eastern Tributary Stage 5 & 6
              c.   details of the treatment to all batters, armoury, plantings, weed treatment,
                   location of services/utilities and rehabilitation.
              d.   a maintenance period of no less than 3 years
              e.   a species palette and densities table incorporating the species selection
                   of only native indigenous species
              f.   measurable and achievable criteria on which the performance of the
                   floristic and structural component of the re-vegetation strategy can be
                   assessed annually over three years, including no weeds at the end of the
                   re-vegetation period
              g.   provision of 1 street tree with a minimum pot size of 100 litres planted
                   within the road reserve for every 8 metres of road frontage including
                   around the cul de sac’s
              h.   control of all weeds species listed in the following standards and
                   legislation:
                   i.       declared plants under the Land Protection (Pest and Stock Route
                            Management) Act 2002 and sub-ordinate Regulation 2003
                   ii.      Council Listed Environmental Weeds, Exotic Grasses and other
                            plants identified in writing by Council (*refer to Advisory Note)


                         This is not an official copy of Council’s Minutes
                                                                                   Page 7 of 58

Section 8

ORDINARY MEETING MINUTES                                                    18 DECEMBER 2014


        13.   All rehabilitation and re-vegetation of the eastern tributary (waterway) must be
              completed prior to Council endorsement of the Plan of Survey.
        Dedication of Land as Reserve
        14.   The area identified as lot 100 Park must be dedicated to the Crown as a
              reserve for Park purposes. The land to be dedicated is “non-trunk
              infrastructure” for the purposes of the Sustainable Planning Act 2009.
        Active Park
        15.   Active park embellishments must be provided generally in accordance with
              drawing number 14/005-S01, titled Erindale Park, Cooroy Proposed Park Land
              Development Concept Plan, prepared by Play Environment Consulting dated
              13.05.14 and 14/005-S01 and 14/005-S02, titled Erindale Park, Cooroy
              Proposed Park Land Development Concept Plan, prepared by Play
              Environment Consulting dated 17.11.14. All works to be dedicated are “non-
              trunk infrastructure” for the purposes of the Sustainable Planning Act 2009.
        Works within Protected Land
        16.   The following works must be undertaken within the land to be dedicated to the
              Crown as Park reserve:
              a.      footbridge and pathway
              b.      All rehabilitation and re-vegetation of the eastern and western tributaries
                      (watercourses)
              c.      Active Park embellishments in accordance with this Decision Notice.
              All works must be undertaken in accordance with an Operational Works
              approval.
        ENGINEERING
        External Works
        17.   A new intersection must be constructed joining Blue Wren Place with the new
              road. The works must be undertaken in accordance with an Operational Works
              approval, and must include in particular:
              a.      vehicle priority maintained to Blue Wren Place
              b.      provision of sight distances adequate for the design speed of the road
              c.      installation of street lighting
              All works to be dedicated are “non-trunk infrastructure” for the purposes of the
              Sustainable Planning Act 2009.
        New Roads
        18.   The new roads shown on the Approved Plans must be constructed in
              accordance with the conditions of this Decision Notice and dedicated as road
              reserve at no cost to Council. The works must be undertaken in accordance
              with an Operational Works approval and must include in particular:
              a.      a reserve width of 15 metres minimum widened where applicable to
                      encompass the cul-de-sacs and the necessary verge areas
              b.      sealing, kerbing and channelling
              c.      an “Access Road” in accordance with Council’s Planning Scheme Policy
                      5 – Engineering Design Standards - Road, Drainage and Earthworks
              d.      construction of pedestrian footpaths in accordance with the conditions of
                      this Decision Notice
                        This is not an official copy of Council’s Minutes
                                                                                   Page 8 of 58

Section 9

ORDINARY MEETING MINUTES                                                   18 DECEMBER 2014


              e.    installation of street lighting
              f.    modifications to existing services
              g.    cul-de-sacs in accordance with Council’s Planning Scheme Policy 5 –
                    Engineering Design Standards - Road, Drainage and Earthworks
              h.    bollards or similar approved barriers on the western side of the new road
                    that prevent vehicles from entering into the proposed bio-swale and park
              i.    flood immunity in accordance with QUDM
              All works to be dedicated are “non-trunk infrastructure” for the purposes of the
              Sustainable Planning Act 2009.
        Pedestrian and Bicycle Facilities
        19.   Pedestrian and bicycle facilities must be provided for the development. The
              works must be undertaken in accordance with an Operational Works approval
              and must include in particular:
              a.    a 2 metre wide footpath within the road verge on the eastern side of the
                    new road extending to join with the existing pathway in Blue Wren Place
              b.    pram ramps on both sides of Blue Wren Place at the intersection with the
                    new road
              c.    a 2 metre wide footpath within proposed Lot 100 extending to the
                    pathway and footbridge as shown on plan number 1225-62A dated 9/14
                    prepared by Callaghan and Toth
              d.    a 2 metre wide footpath within the new road (between lots 25 & 26) and
                    proposed Lot 100 connecting the cul-de-sac of the new road to the
                    existing pathway network in Lake Macdonald Drive.
              All pedestrian and bicycle facilities to be dedicated are “non-trunk infrastructure”
              for the purposes of the Sustainable Planning Act 2009.
        Stormwater Drainage.
        20.   The site must be provided with a stormwater drainage system connecting to a
              lawful point of discharge. The works must be undertaken in accordance with an
              Operational Works approval, and must include in particular:
              a.    the drainage structures generally as shown on the Approved Plans
              b.    the provision of Level 2 inter-allotment drainage for proposed Lots 26-28
                    including registration of drainage easements
              c.    provision of kerb adapters for all new lots that discharge into the new road
              d.    extension of the site stormwater system to accommodate stormwater
                    from applicable areas external to the site, including registration of
                    drainage easements
              e.    a maintenance path to any proposed bioretention basin that is suitable for
                    Council’s maintenance vehicles
        21.   A stormwater quality treatment system must be provided for the development.
              The works must be undertaken in accordance with an Operational Works
              approval and the Bioretention Technical Design Guidelines (Water by Design)
              and must include in particular:
              a.    stormwater quality treatment devices generally in accordance with the
                    Approved Plans


                      This is not an official copy of Council’s Minutes
                                                                                    Page 9 of 58

Section 10

ORDINARY MEETING MINUTES                                                       18 DECEMBER 2014


              b.    bioretention devices which:
                    i.        are designed generally in accordance with IPWEQA Standard
                              Drawing No. WSUD-001
                    ii.       are designed to ensure that flows which exceed the treatment
                              capacity of the device avoid damaging of the filter media or
                              subjecting the filter media to excessive sediment loads
                    iii.      are provided with a free-draining outlet from the sub-soil drainage
                              system
        22.   Where bio-retention devices (or similar) are required within a residential
              allotment the devices:
              a.    must be installed prior to the sealing of the Survey Plan
              b.    must be protected by a covenant.
              c.    a maintenance handbook, able to be provided to future owners, must be
                    prepared for the system to outline how the system works and the level of
                    maintenance that will be regularly required. The maintenance handbook
                    must be submitted to Council for approval and for records purposes prior
                    to the sealing of the Survey Plan.
        23.   Detailed life cycle costing must be prepared for the stormwater quality
              treatment system by a Registered Professional Engineer Queensland and
              submitted to Council prior to the issue of any Development Permit for
              Operational Works.
        Electricity and Telecommunication Services
        24.   Underground reticulated electricity and telecommunication services must be
              provided to each lot in accordance with an approval for Operational Works and
              the standards and requirements of the relevant service provider.
        25.   Unless otherwise stipulated by telecommunications legislation at the time of
              construction, the development must be provided with all necessary conduits,
              pits and pipes to accommodate the future connection of optic fibre technology
              telecommunications.
        26.   Certification must be submitted to Council from all relevant service providers
              which certifies that the development has met the requirements of this Decision
              Notice and all applicable legislation at the time of construction.
        Easements
        27.   Easements for inter-allotment drainage within Lots 26-28 which encompass the
              constructed drainage structures.
        28.   Unless otherwise agreed in writing by the relevant service provider, any public
              or third party infrastructure located on the subject site must be placed within an
              easement registered against the title of the property.
        29.   All easements must be designed in accordance with the planning scheme and
              granted at no cost to the Grantee. Where the Grantee is Council or a service
              authority, the easement documentation must be in accordance with the
              Grantee’s standard easement terms. Draft easement documentation must be
              submitted to Council for endorsement.
        30.   All works must be kept clear of any existing or proposed easements on the
              subject land, unless agreed otherwise in writing by the Grantee.



                           This is not an official copy of Council’s Minutes
                                                                                    Page 10 of 58

Section 11

ORDINARY MEETING MINUTES                                                 18 DECEMBER 2014


        Earthworks and Retaining Walls
        31.   All fill and associated batters must be undertaken in accordance with an
              Operational Works approval, and contained entirely within the subject site
              unless written permission from the respective landowner(s) is provided to
              Council.
        UNITYWATER
        The following Unitywater conditions are applied in accordance with the South East
        Queensland (Distribution and Retail) Restructuring Act 2009 and Unitywater’s Interim
        Connections Policy. The conditions below form part of a water connection aspect
        which are taken to be a water approval for a staged connection. Any future
        applications must be made to Unitywater under South East Queensland (Distribution
        and Retail) Restructuring Act 2009. Unitywater can be contacted as follows:
        Phone:     1300 0 Unity (1300 086 489)
        Email:     [email protected]
        Web:       www.unitywater.com
        32.   Reticulated water must be provided to each lot in the development. This must
              include:
              a.   Ensuring that internal water pipes are wholly contained within the lot they
                   will serve.
              b.   An approved water meter for each lot in accordance with Unitywater and
                   SEQ Standard Drawings.
              c.   Provision of a water service from the existing 100mm diameter water
                   main to service located in Blue Wren Place to service each lot within the
                   proposed subdivision in accordance with Unitywater and SEQ Standard
                   Drawings.
              d.   Water meters must be located on alternative boundaries to electrical
                   pillars
              e.   The fire-fighting demand on Unitywater’s water supply system from the
                   development must not exceed 15 litres per second
        33.   Reticulated sewerage must be provided to each lot in the development. This
              must include:
              a.   Ensuring sewer house drains are wholly contained within the Lot they will
                   serve.
              b.   Provision of sewerage infrastructure to within the property boundaries of
                   each Lot within the proposed subdivision.
        34.   A minimum clearance of 1.5 metres must be maintained between Unitywater
              sewers and proposed building envelopes, buildings and other structures
        35.   Easements of between 3 and 10 metres must be provided over all Unitywater
              sewers located within property boundaries in accordance with the SEQ
              standards. Easements shall be centred over the pipe. Easement terms shall be
              the most current registered dealing held by the Department of Natural
              Resources & Mines and shall not be altered or amended.
        36.   Stormwater retention systems and gross pollutant traps must maintain a
              minimum clearance of 1.5 metres from Unitywater water supply and sewerage
              infrastructure



                     This is not an official copy of Council’s Minutes
                                                                               Page 11 of 58

Section 12

ORDINARY MEETING MINUTES                                                  18 DECEMBER 2014


        37.   Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
              Unitywater water mains and 1.5 metres from Unitywater sewerage mains.
              Landscaping plants within these clearances must be low growing when mature
              and suitable Unitywater approved varieties.
        38.   Construction works undertaken in the vicinity of Unitywater water supply or
              sewerage infrastructure must not adversely affect the integrity of the
              infrastructure. All costs associated with repair, replacement or alteration of
              infrastructure must be met by the applicant.
        Advisory Notes
        Aboriginal Cultural Heritage Act 2003
        1.    There may be a requirement to establish a Cultural Heritage Management Plan
              and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003
              (ACH Act).
              The ACH Act establishes a cultural heritage duty of care which provides that: “A
              person who carries out an activity must take all reasonable and practicable
              measures to ensure the activity does not harm Aboriginal cultural heritage”. It is
              an offence to fail to comply with the duty of care. Substantial monetary
              penalties may apply to individuals or corporations breaching this duty of care.
              Injunctions may also be issued by the Land and Resources Tribunal, and the
              Minister administering the ACH Act can also issue stop orders for an activity
              that is harming or is likely to harm Aboriginal cultural heritage or the cultural
              heritage value of Aboriginal cultural heritage.
              You should contact the Cultural Heritage Unit on 07 32476212 to discuss any
              obligations under the ACH Act 2003.
        Infrastructure Charges
        2.    This Development Permit will trigger an “Adopted Infrastructure Charge Notice”
              (if applicable) to be issued in accordance with Council’s “Adopted Infrastructure
              Charges Resolution” under the State Planning Regulatory Provision (Adopted
              Charges) and the Sustainable Planning Act 2009.
        Qualified Persons
        3.    For the purpose of preparing a Rehabilitation Plan, a qualified person is
              considered to be a landscape architect or ecologist with a minimum of 3 years
              current experience in the field of landscape design.
        Building and Construction Industry (Portable Long Service Leave) Levy
        4.    The QLeave levy must be paid prior to the issue of a development permit where
              it is required. Council will not be able to issue a Decision Notice without receipt
              of details that the Levy has been paid. QLeave contact: 1800 803 481 (free call)
              or (07) 3212 6855.
        Co-ordination of Operational Works Assessment
        5.    Additional application fees apply to Operational Work applications where the
              different aspects of the works are lodged separately. Significant savings in
              application fees will result if all works are lodged in a single application.




                      This is not an official copy of Council’s Minutes
                                                                                 Page 12 of 58

Section 13

ORDINARY MEETING MINUTES                                                   18 DECEMBER 2014


         Preparation of a Preliminary Construction Management Plan
         6.   A preliminary Construction Management Plan must be submitted with the
              Operational Works application and must address the following:
              a.    traffic management during all aspects of the construction phase including:
                    i.     a Traffic Management Control Plan in accordance with the Manual
                           of Uniform Traffic Control Devices (MUTCD) detailing all temporary
                           signage and traffic control measures prior to construction
                    ii.    maintenance of safe pedestrian access for the areas affected by the
                           works during and after daily construction has ceased
                    iii.   proposed fencing to the site during the construction phase of the
                           development
                    iv.    approval of the Traffic Management Control Plan by the Department
                           of Transport and Main Roads (DTMR) for any works on State
                           controlled roads
                    v.     provision for worker car parking
              b.    maintenance and protection of water quality and existing drainage lines
                    through the construction site, through the implementation of appropriate
                    erosion and sediment control measures
              c.    works programme identifying key components of the works and their
                    respective durations
              d.    establishment of a communication protocol with the general public,
                    adjoining owners, emergency services and local businesses to advise of
                    agreed construction times, impacts on traffic, services and other relevant
                    issues
              e.    identification of complaint management procedures including:
                    i.     contact details for the on-site manager
                    ii.    dispute resolution procedures
              f.    details on the location of external fill sites/sources, the haulage route,
                    type of vehicle to be utilised during filling operations and frequency of
                    usage. NB any damage to the existing road system as a result of
                    haulage operations shall be fully repaired at the applicant’s expense
              g.    it is acknowledged that the preliminary Construction Management Plan
                    will be a draft document requiring finalisation upon appointment of the
                    Principal Contractor employed to construct the works and a final
                    document will be required to be submitted at the Pre-Start Meeting for the
                    project.
         UNITYWATER
         7.   Connection to the Unitywater live water supply and live sewerage system must
              be undertaken by Unitywater at the applicant’s cost.
    B.   Include the following property notes:
         REC13/0146 – Stormwater Treatment Device
         The following notation applies to approved lots 26, 27 and 28:
         “A private stormwater treatment device is located within this allotment and the owner
         is responsible for any maintenance”
         “This property contains a stormwater treatment device protected by a covenant, and
         a maintenance handbook is available under separate application which outlines the
         maintenance requirements.”

                       This is not an official copy of Council’s Minutes
                                                                                Page 13 of 58

Section 14

ORDINARY MEETING MINUTES                                                    18 DECEMBER 2014


2   DEVELOPMENT APPLICATION FOR RECONFIGURATION OF 2 LOTS INTO 6 LOTS
    SITUATED AT 1-11 WILGEE COURT COOROY - REC14/0008
    That Council note the report by the Development Planner to the Planning & Organisation
    Committee Meeting dated 9 December 2014 regarding Application No. REC14/0008 for a
    Development Permit for Reconfiguration of a lot (2 lots into 6 lots) situated at 1 – 11 Wilgee
    Court Cooroy and approve the application in accordance with the following conditions:
    PLANNING
    When Conditions Must Be Complied With
    1.   Unless otherwise stated, all works required by the conditions of this Decision Notice
         must be completed prior to Council endorsement of the Plan of Survey.
    Approved Plans
    2.   Development undertaken in accordance with this approval must generally comply
         with the approved plans of development. The approved plans are listed in the
         following table unless otherwise amended by these conditions.
           Plan No.          Rev.   Plan, prepared by                              Date
           10-3032AP6B3             Plan of Proposed Reconfiguration of Lot 8 on   14-10-14
                                    SP266743 (being part of Lot 137 on MCH978
                                    & Lot 2 on RP173883) and as annotated by
                                    Council

           1225-89           A      Revegetation & Rehabilitation Management       1 October 2014
                                    Plan – Eastern Tributary Stage 5 & 6 and as
                                    annotated by Council

    3.   All lot numbering on the subdivision plan to be submitted to Council for compliance
         assessment must remain as shown on the Approved Plans.
    4.   The development must be undertaken and operated in a manner that causes no
         detrimental effect upon the amenity of the neighbourhood by reason of the creation of
         excessive noise, lighting nuisance or other emissions.
    Road & Park Names
    5.   The proposed names of roads and parks must be lodged with the application for a
         Development Permit for Operational Works. Names are to be:
         a.    Relevant to Australian, preferably local, history ,flora, fauna, culture, landscape
               or physical characteristics;
         b.    If used, personal names should commemorate persons who have contributed
               significantly to the development of the region; demonstrated outstanding levels
               of civic service; or achieved role-model status in the wider community or
               donated property or funds for community benefit; and be recognised in
               memoriam;
         c.    Park names should be unique within the locality;
         d.    Approval will not be given to a name that may construed as advertising, is more
               than one word, understanding that a geographic relationship such as Cooroy
               Mountain is permissible; is insensitive to diverse cultures and does not accord
               with community standards; and is not concise, easy to pronounce and spell and
               be without accent marks, apostrophes or hyphens.
    6.   All street signs on new roads (public and private) and parks must be erected prior to
         works being accepted on maintenance.


                        This is not an official copy of Council’s Minutes
                                                                                   Page 14 of 58

Section 15

ORDINARY MEETING MINUTES                                                     18 DECEMBER 2014


    Boundary Encroachments
    7.    Certification must be submitted to Council from a Licensed Surveyor which certifies
          that:
          a.   all constructed access and roadworks (including associated fill batters and
               retaining walls) are fully contained within a dedicated reserve or registered
               easement
          b.   all utility services and connections (eg. electricity, telecommunications, water,
               sewerage) are wholly located within the lot they serve or alternatively included
               within an easement
          c.   all retaining walls and structures are fully contained within the lot they retain
          d.   any fill, including fill batters, are wholly contained within the subject site and not
               on adjacent properties
    Water & Sewer Connections
    8.    An underground connection to reticulated water and sewerage must be provided to
          each lot in accordance with the standards and requirements of Northern SEQ
          Distributor–Retailer Authority (Unitywater).
    9.    A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
          (Unitywater) must be submitted to Council that certifies an underground connection to
          reticulated water and sewerage has been provided to each lot.
    Performance Bond
    10.   Security in the form of a cash bond or trading bank guarantee to the sum of $10,000
          must be submitted to Council, to secure performance of all conditions of this
          approval, prior to the issue of a Development Permit for Operational Works. The cash
          bond or trading bank guarantee will be returned on performance of the conditions of
          approval less any costs incurred by Council in respect of enforcing performance of
          this permit. Council reserves the right to call upon the bond or guaranteed sum to
          effect compliance with conditions.
    Landscaping & Ecology
    11.   Lot 15 must be removed from within the Riparian Buffer Overlay of The Noosa Plan
          and the boundary setback a minimum of 10 metres from the top of bank, whichever is
          the greater. The area removed from the lot must be rehabilitated in accordance with
          the conditions of this Decision Notice.
    12.   Landscaping and rehabilitation works must be undertaken in accordance with an
          Operational Works approval and Planning Scheme Policy - PSP 3 Landscaping
          Plants and Guidelines and must include an ecological rehabilitation and landscaping
          plan, prepared by a suitably qualified person* and must include in particular:
          a.   the area to be rehabilitated and re-vegetated must be generally in accordance
               with the approved Revegetation & Rehabilitation Management Plan – Eastern
               Tributary Stage 5 & 6
          b.   details of the treatment to all batters, armoury, plantings, weed treatment,
               location of services/utilities and rehabilitation.
          c.   a maintenance period of no less than 3 years
          d.   a species palette and densities table incorporating the species selection of only
               native indigenous species




                       This is not an official copy of Council’s Minutes
                                                                                     Page 15 of 58

Section 16

ORDINARY MEETING MINUTES                                                    18 DECEMBER 2014


          e.   measurable and achievable criteria on which the performance of the floristic
               and structural component of the re-vegetation strategy can be assessed
               annually over three years, including no weeds at the end of the re-vegetation
               period
          f.   provision of 1 street tree with a minimum pot size of 100 litres planted within the
               road reserve for every 8 metres of road frontage including around the cul de
               sac
          g.   control of all weeds species listed in the following standards and legislation:
               i.    declared plants under the Land Protection (Pest and Stock Route
                     Management) Act 2002 and sub-ordinate Regulation 2003
               ii.   Council Listed Environmental Weeds, Exotic Grasses and other plants
                     identified in writing by Council (*refer to Advisory Note)
    13.   All rehabilitation of the eastern tributary (waterway) including the construction of the
          footbridge must be completed prior to Council endorsement of the Plan of Survey.
    ENGINEERING
    External Works
    14.   A new intersection must be constructed joining Cordwood Drive with the new road
          (Masonry Street). The works must be undertaken in accordance with an Operational
          Works approval, and must include in particular:
          a.   vehicle priority maintained to Cordwood Drive
          b.   provision of sight distances adequate for the design speed of the road
          c.   installation of street lighting
          All works to be dedicated are “non-trunk infrastructure” for the purposes of the
          Sustainable Planning Act 2009.
    New Roads
    15.   The new road (Masonry Street) shown on the Approved Plans must be constructed in
          accordance with the conditions of this Decision Notice and dedicated as road reserve
          at no cost to Council.
          The road to be dedicated is “non-trunk infrastructure” for the purposes of the
          Sustainable Planning Act 2009.
    16.   The new road (Masonry Street) as shown on the Approved Plans must be
          constructed. The works must be undertaken in accordance with an Operational
          Works approval and must include in particular:
          a.   a reserve width of 15 metres minimum widened where applicable to encompass
               the cul-de-sac and the necessary verge areas
          b.   sealing, kerbing and channelling
          c.   an “Access Road” in accordance with Council’s Planning Scheme Policy 5 –
               Engineering Design Standards - Road, Drainage and Earthworks
          d.   construction of pedestrian footpaths in accordance with the conditions of this
               Decision Notice
          e.   installation of street lighting
          f.   modifications to existing services.
          g.   A cul-de-sac in accordance with Council’s Planning Scheme Policy 5 –
               Engineering Design Standards - Road, Drainage and Earthworks
          All works to be dedicated is “non-trunk infrastructure” for the purposes of the
          Sustainable Planning Act 2009.

                        This is not an official copy of Council’s Minutes
                                                                                   Page 16 of 58

Section 17

ORDINARY MEETING MINUTES                                                    18 DECEMBER 2014


    Pedestrian and Bicycle Facilities
    17.   Pedestrian and bicycle facilities must be provided for the development. The works
          must be undertaken in accordance with an Operational Works approval and must
          include in particular:
          a.   a 2 metre wide footpath within the road verge on the western side of “Masonry
               Street” extending to join with the existing pathway in Cordwood Drive
          b.   pram ramps on both sides of “Masonry Street” at the intersection with
               Cordwood Drive
          c.   the pathway and footbridge located generally as shown on plan number 1225-
               62A dated 9/14 prepared by Callaghan and Toth excepting that the pathway
               sections are to be a minimum 2 metres wide.
          The pathway and footbridge to be dedicated is “non-trunk infrastructure” for the
          purposes of the Sustainable Planning Act 2009.
    Stormwater Drainage
    18.   The site must be provided with a stormwater drainage system connecting to a lawful
          point of discharge. The works must be undertaken in accordance with an Operational
          Works approval, and must include in particular:
          a.   The drainage structures generally as shown on the Approved Plans
          b.   The provision of Level 2 inter-allotment drainage for proposed Lots 14-16
               including registration of drainage easements
          c.   Provision of kerb adapters for all new lots that discharge into the new road
          d.   Extension of the site stormwater system to accommodate stormwater from Lot
               1 RP173883 and other applicable areas external to the site, including
               registration of drainage easements.
          e.   A maintenance path to the bioretention basin that is suitable for Council’s
               maintenance vehicles
          All infrastructure to be dedicated is “non-trunk infrastructure” for the purposes of the
          Sustainable Planning Act 2009.
    19.   The existing stormwater drainage system for Lots 5-7 on SP266743 must be modified
          to discharge into the bioretention basin.
    20.   A stormwater quality treatment system must be provided for the development. The
          works must be undertaken in accordance with an Operational Works approval and
          the Bioretention Technical Design Guidelines (Water by Design) and must include in
          particular:
          a.   stormwater quality treatment devices generally in accordance with the
               Approved Plans
          b.   bioretention devices which:
               i.     are designed generally in accordance with IPWEQA Standard Drawing
                      No. WSUD-001
               ii.    are designed to ensure that flows which exceed the treatment capacity of
                      the device avoid damaging of the filter media or subjecting the filter media
                      to excessive sediment loads
               iii.   are provided with a free-draining outlet from the sub-soil drainage system
          All infrastructure to be dedicated is “non-trunk infrastructure” for the purposes of the
          Sustainable Planning Act 2009.

                        This is not an official copy of Council’s Minutes
                                                                                   Page 17 of 58

Section 18

ORDINARY MEETING MINUTES                                                    18 DECEMBER 2014


    21.   Detailed life cycle costing must be prepared for the stormwater quality treatment
          system by a Registered Professional Engineer Queensland and submitted to Council
          prior to the issue of any Development Permit for Operational Works.
    Stormwater and Flood Management
    22.   Stormwater and flood management for the development must be provided generally
          in accordance with the provisions identified for the eastern tributary in the Stormwater
          and Flooding Report prepared by BSM and dated 15 September 2014. The works
          must be undertaken in accordance with an Operational Works approval and must
          include in particular:
          a.    a non-worsening at the site boundaries
          b.    certification must be submitted to Council at the completion of works from an
                RPEQ which certifies that the development has met the stormwater and
                flooding requirements of this Decision Notice
    Electricity and Telecommunication Services
    23.   Underground reticulated electricity and telecommunication services must be provided
          to each lot in accordance with an approval for Operational Works and the standards
          and requirements of the relevant service provider.
    24.   Unless otherwise stipulated by telecommunications legislation at the time of
          construction, the development must be provided with all necessary conduits, pits and
          pipes to accommodate the future connection of optic fibre technology
          telecommunications.
    25.   Certification must be submitted to Council from all relevant service providers which
          certifies that the development has met the requirements of this Decision Notice and
          all applicable legislation at the time of construction.
    Easements
    26.   Easements for inter-allotment drainage must be provided within Lots 11, and 14-16
          which encompass the constructed drainage structures.
    27.   An easement for drainage purposes must be registered against the title of proposed
          Lot 10 in favour of Council over the land area identified as the eastern portion of
          proposed Lot 10 with extents defined as the full frontage to Wilgee Court to the east,
          Lot 5 SP266743 to the north, extending along the southern boundary of proposed Lot
          13 in REC14/0009 and the road reserve boundary to the eastern boundary of
          proposed Lot 100 in REC14/0009, along the southern boundary of Lot 100 in
          REC14/0009, then perpendicular to the southern boundary of proposed Lot 10 and
          returning to Wilgee Court. Draft easement documentation must be submitted to
          Council for endorsement
    28.   Unless otherwise agreed in writing by the relevant service provider, any public or third
          party infrastructure located on the subject site must be placed within an easement
          registered against the title of the property.
    29.   All easements must be designed in accordance with the planning scheme and
          granted at no cost to the Grantee. Where the Grantee is Council or a service
          authority, the easement documentation must be in accordance with the Grantee’s
          standard easement terms. Draft easement documentation must be submitted to
          Council for endorsement.
    30.   All works must be kept clear of any existing or proposed easements on the subject
          land, unless agreed otherwise in writing by the Grantee.



                        This is not an official copy of Council’s Minutes
                                                                                   Page 18 of 58

Section 19

ORDINARY MEETING MINUTES                                                    18 DECEMBER 2014


    Earthworks and Retaining Walls
    31.   All fill and associated batters must be undertaken in accordance with an Operational
          Works approval, and contained entirely within the subject site.
    Advisory Notes
    Aboriginal Cultural Heritage Act 2003
    1.    There may be a requirement to establish a Cultural Heritage Management Plan
          and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH
          Act).
          The ACH Act establishes a cultural heritage duty of care which provides that: “A
          person who carries out an activity must take all reasonable and practicable measures
          to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to
          fail to comply with the duty of care. Substantial monetary penalties may apply to
          individuals or corporations breaching this duty of care. Injunctions may also be issued
          by the Land and Resources Tribunal, and the Minister administering the ACH Act can
          also issue stop orders for an activity that is harming or is likely to harm Aboriginal
          cultural heritage or the cultural heritage value of Aboriginal cultural heritage.
          You should contact the Cultural Heritage Unit on 07 32476212 to discuss any
          obligations under the ACH Act.
    Infrastructure Charges
    2.    This Development Permit will trigger an “Adopted Infrastructure Charge Notice” (if
          applicable) to be issued in accordance with Council’s “Adopted Infrastructure
          Charges Resolution” under the State Planning Regulatory Provision (Adopted
          Charges) and the Sustainable Planning Act 2009.
    Qualified Persons
    3.    For the purpose of preparing a Rehabilitation Plan, a qualified person is considered to
          be a landscape architect or ecologist with a minimum of 3 years current experience in
          the field of landscape design.
    Building and Construction Industry (Portable Long Service Leave) Levy
    4.    The QLeave levy must be paid prior to the issue of a development permit where it is
          required. Council will not be able to issue a Decision Notice without receipt of details
          that the Levy has been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212
          6855.
    Co-ordination of Operational Works Assessment
    5.    Additional application fees apply to Operational Work applications where the different
          aspects of the works are lodged separately. Significant savings in application fees
          will result if all works are lodged in a single application.
    Preparation of a Preliminary Construction Management Plan
    6.    A preliminary Construction Management Plan must be submitted with the Operational
          Works application and must address the following:
          a.   traffic management during all aspects of the construction phase including:
               i.    a Traffic Management Control Plan in accordance with the Manual of
                     Uniform Traffic Control Devices (MUTCD) detailing all temporary signage
                     and traffic control measures prior to construction
               ii.   maintenance of safe pedestrian access for the areas affected by the
                     works during and after daily construction has ceased


                        This is not an official copy of Council’s Minutes
                                                                                   Page 19 of 58

Section 20

ORDINARY MEETING MINUTES                                                    18 DECEMBER 2014


               iii.   proposed fencing to the site during the construction phase of the
                      development
               iv.    approval of the Traffic Management Control Plan by the Department of
                      Transport and Main Roads (DTMR) for any works on State controlled
                      roads
               v.     provision for worker car parking
         b.    maintenance and protection of water quality and existing drainage lines through
               the construction site, through the implementation of appropriate erosion and
               sediment control measures
         c.    works programme identifying key components of the works and their respective
               durations
         d.    establishment of a communication protocol with the general public, adjoining
               owners, emergency services and local businesses to advise of agreed
               construction times, impacts on traffic, services and other relevant issues
         e.    identification of complaint management procedures including:
               i.     contact details for the on-site manager
               ii.    dispute resolution procedures
         f.    details on the location of external fill sites/sources, the haulage route, type of
               vehicle to be utilised during filling operations and frequency of usage. NB any
               damage to the existing road system as a result of haulage operations shall be
               fully repaired at the applicant’s expense
         g.    it is acknowledged that the preliminary Construction Management Plan will be a
               draft document requiring finalisation upon appointment of the Principal
               Contractor employed to construct the works and a final document will be
               required to be submitted at the Pre-Start Meeting for the project.



3   DEVELOPMENT APPLICATION FOR RECONFIGURATION OF 2 LOTS INTO 6 LOTS
    PLUS 1 PARK LOT SITUATED AT 1 - 11 WILGEE COURT, COOROY - REC14/0009
    That Council note the report by the Development Planner to the Planning & Organisation
    Committee Meeting dated 9 December 2014 regarding Application No. REC14/0009 for a
    Development Permit for Reconfiguration of a lot (2 lots into 6 lots) situated at 1 – 11 Wilgee
    Court Cooroy and:
    A.   Approve the application in accordance with the following conditions:
         PLANNING
         When Conditions Must Be Complied With
         1.    Unless otherwise stated, all works required by the conditions of this Decision
               Notice must be completed prior to Council endorsement of the Plan of Survey.
         Approved Plans
         2.    Development undertaken in accordance with this approval must generally
               comply with the approved plans of development. The approved plans are listed
               in the following table unless otherwise amended by these conditions.




                        This is not an official copy of Council’s Minutes
                                                                                   Page 20 of 58

Section 21

ORDINARY MEETING MINUTES                                                 18 DECEMBER 2014



              Plan No.         Rev.    Plan, prepared by                        Date

              10-3032AP7B4             Plan of Proposed Reconfiguration of      14-10-14
                                       Lot 8 on SP266743 (being part of
                                       Lot 137 on MCH978 & Lot 2 on
                                       RP173883)

              1225-89          A       Revegetation   &      Rehabilitation     1 October 2012
                                       Management Plan – Eastern Tributary
                                       Stage 5 & 6 and as annotated by
                                       Council

        3.   All lot numbering on the subdivision plan to be submitted to Council for
             compliance assessment must remain as shown on the Approved Plans.
        4.   The development must be undertaken and operated in a manner that causes
             no detrimental effect upon the amenity of the neighbourhood by reason of the
             creation of excessive noise, lighting nuisance or other emissions.
        Road & Park Names
        5.   The proposed names of roads and parks must be lodged with the application
             for a Development Permit for Operational Works. Names are to be:
             a.   Relevant to Australian, preferably local, history, flora, fauna, culture,
                  landscape or physical characteristics;
             b.   If used, personal names should commemorate persons who have
                  contributed significantly to the development of the region; demonstrated
                  outstanding levels of civic service; or achieved role-model status in the
                  wider community or donated property or funds for community benefit; and
                  be recognised in memoriam;
             c.   Park names should be unique within the locality;
             d.   Approval will not be given to a name that may construed as advertising, is
                  more than one word, understanding that a geographic relationship such
                  as Cooroy Mountain is permissible; is insensitive to diverse cultures and
                  does not accord with community standards; and is not concise, easy to
                  pronounce and spell and be without accent marks, apostrophes or
                  hyphens.
        6.   All street signs on new roads (public and private) and parks must be erected
             prior to works being accepted on maintenance.
        Boundary Encroachments
        7.   Certification must be submitted to Council from a Licensed Surveyor which
             certifies that:
             a.   all constructed access and roadworks (including associated fill batters
                  and retaining walls) are fully contained within a dedicated reserve or
                  registered easement
             b.   all utility services and connections (eg. electricity, telecommunications,
                  water, sewerage) are wholly located within the lot they serve or
                  alternatively included within an easement
             c.   all retaining walls and structures are fully contained within the lot they
                  retain
             d.   any fill, including fill batters, are wholly contained within the subject site
                  and not on adjacent properties
                    This is not an official copy of Council’s Minutes
                                                                                Page 21 of 58

Section 22

ORDINARY MEETING MINUTES                                                     18 DECEMBER 2014


        Water & Sewer Connections
        8.    An underground connection to reticulated water and sewerage must be
              provided to each lot in accordance with the standards and requirements of
              Northern SEQ Distributor–Retailer Authority (Unitywater).
        9.    A Certificate of Completion from the Northern SEQ Distributor–Retailer
              Authority (Unitywater) must be submitted to Council that certifies an
              underground connection to reticulated water and sewerage has been provided
              to each lot.
        Performance Bond
        10.   Security in the form of a cash bond or trading bank guarantee to the sum of
              $10,000 must be submitted to Council, to secure performance of all conditions
              of this approval, prior to the issue of a Development Permit for Operational
              Works. The cash bond or trading bank guarantee will be returned on
              performance of the conditions of approval less any costs incurred by Council in
              respect of enforcing performance of this permit. Council reserves the right to
              call upon the bond or guaranteed sum to effect compliance with conditions.
        Landscaping & Ecology
        11.   Landscaping and rehabilitation works must be undertaken in accordance with
              an Operational Works approval and Planning Scheme Policy - PSP 3
              Landscaping Plants and Guidelines. An ecological rehabilitation and
              landscaping plan must be submitted, prepared by a suitably qualified person*
              and must include in particular:
              a.   the area to be rehabilitated and re-vegetated must be generally in
                   accordance with the approved Revegetation & Rehabilitation
                   Management Plan – Eastern Tributary Stage 5 & 6 and
              b.   details of the treatment to all batters, armoury, plantings, weed treatment,
                   location of services/utilities and rehabilitation.
              c.   a maintenance period of no less than 3 years
              d.   a species palette and densities table incorporating the species selection
                   of only native indigenous species
              e.   measurable and achievable criteria on which the performance of the
                   floristic and structural component of the re-vegetation strategy can be
                   assessed annually over three years, including no weeds at the end of the
                   re-vegetation period.
              f.   provision of 1 street tree with a minimum pot size of 100 litres planted
                   within the road reserve for every 8 metres of road frontage including
                   around the cul de sac
              g.   control of all weeds species listed in the following standards and
                   legislation:
                   i.       declared plants under the Land Protection (Pest and Stock Route
                            Management) Act 2002 and sub-ordinate Regulation 2003
                   ii.      Council Listed Environmental Weeds, Exotic Grasses and other
                            plants identified in writing by Council (*refer to Advisory Note)
        12.   All rehabilitation and re-vegetation of the eastern tributary (waterway) including
              works within the Park and the construction of the footbridge must be completed
              prior to Council endorsement of the Plan of Survey.


                         This is not an official copy of Council’s Minutes
                                                                                  Page 22 of 58

Section 23

ORDINARY MEETING MINUTES                                                  18 DECEMBER 2014


        Dedication of Land as Reserve
        13.   The area identified as lot 100 Park on the Approved Plans must be dedicated to
              the Crown as a reserve for Park purposes. The land to be dedicated is “non-
              trunk infrastructure” for the purposes of the Sustainable Planning Act 2009.
        Works within Protected Land
        14.   The following works must be undertaken within the land to be dedicated to the
              Crown as Park reserve:
              a.   footbridge and pathway
        ENGINEERING
        External Works
        15.   A new intersection must be constructed joining Cordwood Drive with the new
              road (Masonry Street). The works must be undertaken in accordance with an
              Operational Works approval, and must include in particular:
              a.   vehicle priority maintained to Cordwood Drive
              b.   provision of sight distances adequate for the design speed of the road
              c.   installation of street lighting
              All works to be dedicated are “non-trunk infrastructure” for the purposes of the
              Sustainable Planning Act 2009.
        New Roads
        16.   The new road (Masonry Street) shown on the Approved Plans must be
              constructed in accordance with the conditions of this Decision Notice and
              dedicated as road reserve at no cost to Council. The works must be undertaken
              in accordance with an Operational Works approval and must include in
              particular:
              a.   a reserve width of 15 metres minimum widened where applicable to
                   encompass the cul-de-sac and the necessary verge areas
              b.   sealing, kerbing and channelling
              c.   An “Access Road” in accordance with Council’s Planning Scheme Policy
                   5 – Engineering Design Standards - Road, Drainage and Earthworks
              d.   construction of pedestrian footpaths in accordance with the conditions of
                   this Decision Notice
              e.   installation of street lighting
              f.   modifications to existing services
              g.   A cul-de-sac in accordance with Council’s Planning Scheme Policy 5 –
                   Engineering Design Standards - Road, Drainage and Earthworks.
              All works to be dedicated are “non-trunk infrastructure” for the purposes of the
              Sustainable Planning Act 2009.
        Pedestrian and Bicycle Facilities
        17.   Pedestrian and bicycle facilities must be provided for the development. The
              works must be undertaken in accordance with an Operational Works approval
              and must include in particular:
              a.   a 2 metre wide footpath within the road verge on the western side of
                   “Masonry Street” extending to join with the existing pathway in Cordwood
                   Drive
                      This is not an official copy of Council’s Minutes
                                                                               Page 23 of 58

Section 24

ORDINARY MEETING MINUTES                                                       18 DECEMBER 2014


              b.    pram ramps on both sides of “Masonry Street” at the intersection with
                    Cordwood Drive
              c.    the pathway and footbridge located generally as shown on plan number
                    1225-62A dated 9/14 prepared by Callaghan and Toth excepting that the
                    pathway sections are to be a minimum 2 metres wide.
              The footpath and footbridge to be dedicated are “non-trunk infrastructure” for
              the purposes of the Sustainable Planning Act 2009.
        Stormwater Drainage.
        18.   The site must be provided with a stormwater drainage system connecting to a
              lawful point of discharge. The works must be undertaken in accordance with an
              Operational Works approval, and must include in particular:
              a.    The drainage structures generally as shown on the Approved Plans
              b.    provision of kerb adapters for all new lots that discharge into the new road
              c.    extension of the site stormwater system to accommodate stormwater
                    from Lot 1 RP173883 and other applicable areas external to the site,
                    including registration of drainage easements
              d.    a maintenance path to the bioretention basin that is suitable for Council’s
                    maintenance vehicles
              All infrastructure to be dedicated is “non-trunk infrastructure” for the purposes of
              the Sustainable Planning Act 2009.
        19.   The existing stormwater drainage system for Lots 5-7 on SP266743 must be
              modified to discharge into the bioretention basin.
        20.   A stormwater quality treatment system must be provided for the development.
              The works must be undertaken in accordance with an Operational Works
              approval and the Bioretention Technical Design Guidelines (Water by Design)
              and must include in particular:
              a.    stormwater quality treatment devices generally in accordance with the
                    Approved Plans
              b.    bioretention devices which:
                    i.        are designed generally in accordance with IPWEQA Standard
                              Drawing No. WSUD-001
                    ii.       are designed to ensure that flows which exceed the treatment
                              capacity of the device avoid damaging of the filter media or
                              subjecting the filter media to excessive sediment loads
                    iii.      are provided with a free-draining outlet from the sub-soil drainage
                              system
              All infrastructure to be dedicated is “non-trunk infrastructure” for the purposes of
              the Sustainable Planning Act 2009.
        21.   Detailed life cycle costing must be prepared for the stormwater quality
              treatment system by a Registered Professional Engineer Queensland and
              submitted to Council prior to the issue of any Development Permit for
              Operational Works.




                           This is not an official copy of Council’s Minutes
                                                                                    Page 24 of 58

Section 25

ORDINARY MEETING MINUTES                                                  18 DECEMBER 2014


        Stormwater and Flood Management
        22.   Stormwater and flood management for the development must be provided
              generally in accordance with the provisions identified for the eastern tributary in
              the Stormwater and Flooding prepared by BSM and dated 15 September 2014.
              The works must be undertaken in accordance with an Operational Works
              approval and must include in particular:
              a.    a non-worsening at the site boundaries
              b.    certification must be submitted to Council at the completion of works from
                    an RPEQ which certifies that the development has met the stormwater
                    and flooding requirements of this Decision Notice
        Electricity and Telecommunication Services
        23.   Underground reticulated electricity and telecommunication services must be
              provided to each lot in accordance with an approval for Operational Works and
              the standards and requirements of the relevant service provider.
        24.   Unless otherwise stipulated by telecommunications legislation at the time of
              construction, the development must be provided with all necessary conduits,
              pits and pipes to accommodate the future connection of optic fibre technology
              telecommunications.
        25.   Certification must be submitted to Council from all relevant service providers
              which certifies that the development has met the requirements of this Decision
              Notice and all applicable legislation at the time of construction.
        Easements
        26.   An easement for inter-allotment drainage must be provided within Lot 11 which
              encompasses the constructed drainage structures.
        27.   An easement for drainage purposes must be registered against the title of
              proposed Lot 17 in favour of Council over the land area identified as the eastern
              portion of proposed Lot 17 with extents defined as the full frontage to Wilgee
              Court to the east, Lot 5 SP266743 to the north, extending along the southern
              boundary of proposed Lot 13 and the road reserve boundary to the eastern
              boundary of proposed Lot 100, along the southern boundary of Lot 100, then
              perpendicular to the southern boundary of proposed Lot 17 and returning to
              Wilgee Court. Draft easement documentation must be submitted to Council for
              endorsement.
        28.   Unless otherwise agreed in writing by the relevant service provider, any public
              or third party infrastructure located on the subject site must be placed within an
              easement registered against the title of the property.
        29.   All easements must be designed in accordance with the planning scheme and
              granted at no cost to the Grantee. Where the Grantee is Council or a service
              authority, the easement documentation must be in accordance with the
              Grantee’s standard easement terms. Draft easement documentation must be
              submitted to Council for endorsement.
        30.   All works must be kept clear of any existing or proposed easements on the
              subject land, unless agreed otherwise in writing by the Grantee.
        Earthworks and Retaining Walls
        31.   All fill and associated batters must be undertaken in accordance with an
              Operational Works approval, and contained entirely within the subject site.



                      This is not an official copy of Council’s Minutes
                                                                                 Page 25 of 58

Section 26

ORDINARY MEETING MINUTES                                                      18 DECEMBER 2014


        Advisory Notes
        Aboriginal Cultural Heritage Act 2003
        1.   There may be a requirement to establish a Cultural Heritage Management Plan
             and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003
             (ACH Act).
             The ACH Act establishes a cultural heritage duty of care which provides that: “A
             person who carries out an activity must take all reasonable and practicable
             measures to ensure the activity does not harm Aboriginal cultural heritage”. It is
             an offence to fail to comply with the duty of care. Substantial monetary
             penalties may apply to individuals or corporations breaching this duty of care.
             Injunctions may also be issued by the Land and Resources Tribunal, and the
             Minister administering the ACH Act can also issue stop orders for an activity
             that is harming or is likely to harm Aboriginal cultural heritage or the cultural
             heritage value of Aboriginal cultural heritage.
             You should contact the Cultural Heritage Unit on 07 32476212 to discuss any
             obligations under the ACH Act.
        Infrastructure Charges
        2.   This Development Permit will trigger an “Adopted Infrastructure Charge Notice”
             (if applicable) to be issued in accordance with Council’s “Adopted Infrastructure
             Charges Resolution” under the State Planning Regulatory Provision (Adopted
             Charges) and the Sustainable Planning Act 2009.
        Qualified Persons
        3.   For the purpose of preparing a Rehabilitation Plan, a qualified person is
             considered to be a landscape architect or ecologist with a minimum of 3 years
             current experience in the field of landscape design.
        Building and Construction Industry (Portable Long Service Leave) Levy
        4.   The QLeave levy must be paid prior to the issue of a development permit where
             it is required. Council will not be able to issue a Decision Notice without receipt
             of details that the Levy has been paid. QLeave contact: 1800 803 481 (free call)
             or (07) 3212 6855.
        Co-ordination of Operational Works Assessment
        5.   Additional application fees apply to Operational Work applications where the
             different aspects of the works are lodged separately. Significant savings in
             application fees will result if all works are lodged in a single application.
        Preparation of a Preliminary Construction Management Plan
        6.   A preliminary Construction Management Plan must be submitted with the
             Operational Works application and must address the following:
             a.    traffic management during all aspects of the construction phase including:
                   i.        a Traffic Management Control Plan in accordance with the Manual
                             of Uniform Traffic Control Devices (MUTCD) detailing all temporary
                             signage and traffic control measures prior to construction
                   ii.       maintenance of safe pedestrian access for the areas affected by the
                             works during and after daily construction has ceased
                   iii.      proposed fencing to the site during the construction phase of the
                             development


                          This is not an official copy of Council’s Minutes
                                                                                   Page 26 of 58

Section 27

ORDINARY MEETING MINUTES                                                      18 DECEMBER 2014


                    iv.      approval of the Traffic Management Control Plan by the Department
                             of Transport and Main Roads (DTMR) for any works on State
                             controlled roads
                    v.       provision for worker car parking
               b.   maintenance and protection of water quality and existing drainage lines
                    through the construction site, through the implementation of appropriate
                    erosion and sediment control measures
               c.   works programme identifying key components of the works and their
                    respective durations
               d.   establishment of a communication protocol with the general public,
                    adjoining owners, emergency services and local businesses to advise of
                    agreed construction times, impacts on traffic, services and other relevant
                    issues
               e.   identification of complaint management procedures including:
                    i.       contact details for the on-site manager
                    ii.      dispute resolution procedures
               f.   details on the location of external fill sites/sources, the haulage route,
                    type of vehicle to be utilised during filling operations and frequency of
                    usage. NB any damage to the existing road system as a result of
                    haulage operations shall be fully repaired at the applicant’s expense
               g.   it is acknowledged that the preliminary Construction Management Plan
                    will be a draft document requiring finalisation upon appointment of the
                    Principal Contractor employed to construct the works and a final
                    document will be required to be submitted at the Pre-Start Meeting for the
                    project.
    B.   Include the following property note:
         REC14/0009 – Gas Pipeline Buffer
         The following notation applies to approved lots 10, 11, 12, and 13:
         The allotment is within 200 metres of a gas pipeline easement. Enquiries regarding
         the future construction and operation of the pipeline should be directed to the gas
         pipeline licence holder - APA Group on 33236148 or PO Box 6569, Upper Mt Gravatt,
         QLD 4122.




4   COMBINED DEVELOPMENT APPLICATION REC13/0148 & MCU13/0226 FOR
    RECONFIGURING A LOT (2 INTO 25 LOTS & PARK) AND A S242 PRELIMINARY
    APPROVAL FOR DETACHED HOUSING IN THE COMMUNITY SERVICES ZONE AT
    PEARSONS RD AND 55 LAKE MACDONALD DRIVE, COOROY
    That Council note the report by the Development Planner to the Planning & Organisation
    Committee Meeting dated 9 December 2014 regarding Combined Application No.
    REC13/0148 & MCU13/0226 for a Development Permit for Reconfiguring a Lot (2 into 25);
    and Preliminary Approval for Material Change of Use under Section 242 of the Sustainable
    Planning Act 2009 for development to be carried out in accordance with the Detached
    House zone, situated at Pearsons Rd & 55 Lake Macdonald Dr Cooroy, and




                          This is not an official copy of Council’s Minutes
                                                                                   Page 27 of 58

Section 28

ORDINARY MEETING MINUTES                                                   18 DECEMBER 2014


    A.   Approve the application in accordance with the following conditions:
         Preliminary Approval for Material Change of Use under Section 242 of the
         Sustainable Planning Act 2009 for development to be carried out in accordance
         with the Detached Housing Zone on Lot 135 on MCH978
         When Conditions must be Complied With
         1.   Unless otherwise stated, all conditions of this Decision Notice must be complied
              with prior to the use commencing, and then compliance maintained at all times
              while the use continues.
         Approved Plans
         2.   Development undertaken in accordance with this approval must generally
              comply with the approved plans of development. The approved plans are listed
              in the following table and may be amended by these conditions.
                Plan No.        Rev.   Plan/Document Name                               Date
                10-3032AZ1A     -      Plan of Proposed Reconfiguration of Lot 135 on   06/05/2014
                                       MCH978 drawn by Max Watterson & Associates

         Nature and Extent of Approved Use
         3.   This approval overrides the planning scheme pursuant to s242 of the Sustainable
              Planning Act 2009 for the life of the approval to the extent that development on
              the site must comply with the development provisions for the Detached Housing
              zone within the Cooroy & Lake Macdonald Locality under The Noosa Plan.
         Development Permit for Reconfiguring a Lot (2 into 25 and Park)
         When Conditions Must Be Complied With
         1.   Unless otherwise stated, all works required by the conditions of this Decision
              Notice must be completed prior to submission of the subdivision plan to Council
              for compliance assessment.
         Approved Plans
         2.   Development undertaken in accordance with this approval must generally
              comply with the approved plans of development. The approved plans are listed
              in the following table unless otherwise amended by these conditions.
                Plan No.        Rev.   Plan/Document Name                               Date
                10-3032AZ1A     -      Plan of Proposed Reconfiguration of Lot 135 on   06/05/2014
                                       MCH978 drawn by Max Watterson & Associates

         3.   All lot numbering on the subdivision plan to be submitted to Council for
              compliance assessment must remain as shown on the Approved Plans.
         4.   The development must be undertaken and operated in a manner that causes
              no detrimental effect upon the amenity of the neighbourhood by reason of the
              creation of excessive noise, lighting nuisance or other emissions.
         Road & Park Names
         5.   The proposed names of roads and parks must be lodged with the application
              for a Development Permit for Operational Works. Names are to be:
              a.    Relevant to Australian, preferably local, history ,flora, fauna, culture,
                    landscape or physical characteristics;



                      This is not an official copy of Council’s Minutes
                                                                                  Page 28 of 58

Section 29

ORDINARY MEETING MINUTES                                                  18 DECEMBER 2014


              b.   If used, personal names should commemorate persons who have
                   contributed significantly to the development of the region; demonstrated
                   outstanding levels of civic service; or achieved role-model status in the
                   wider community or donated property or funds for community benefit; and
                   be recognised in memoriam;
              c.   Park names should be unique within the locality;
              d.   Approval will not be given to a name that may construed as advertising, is
                   more than one word, understanding that a geographic relationship such
                   as Cooroy Mountain is permissible; is insensitive to diverse cultures and
                   does not accord with community standards; and is not concise, easy to
                   pronounce and spell and be without accent marks, apostrophes or
                   hyphens.
        6.    All street signs on new roads (public and private) and parks shall be erected
              prior to works being accepted on maintenance.
        Security Bond
        7.    Security in the form of a cash bonds or trading bank guarantees to the sum of
              $20,000 must be submitted, to secure performance of all conditions of this
              approval, prior to the issue of a Development Permit for Operational Works.
              The cash bond or trading bank guarantee will be returned on performance of
              the conditions of approval less any costs incurred by Council in respect of
              enforcing performance of this permit.
        Boundary Encroachments
        8.    Certification must be submitted to Council from a Licensed Surveyor which
              certifies that:
              a.   All constructed access and roadworks (including associated fill batters
                   and retaining walls) are fully contained within a dedicated reserve or
                   registered easement.
              b.   All utility services and connections (eg. electricity, telecommunications,
                   water, sewerage) are wholly located within the lot they serve or
                   alternatively included within an easement.
              c.   All retaining walls and structures are fully contained within the lot they
                   retain.
              d.   Any fill, including fill batters, are wholly contained within the subject site
                   and not on adjacent properties.
        Landscaping
        9.    Landscaping in the road reserve is to be in accordance with PSP03 –
              Landscaping Plants & Guidelines and a properly prepared landscape plan,
              prepared by a suitably qualified Landscape Architect or Horticulturalist. The
              landscape plans are to be submitted and approved as part of the Operational
              Works incorporating landscaping. Where other permits for Operational Works
              for roads, drainage or access are required, the landscaping layout shall be
              based on approved drawings for those Operational Works.
        10.   The landscaping plans shall include:
              a.   A minimum 2m wide landscaping buffer along the Elm Street frontage,
                   including a 2m truncation of the western property boundaries of lots 44-47
                   with Elm Street to establish screening vegetation on the site.



                      This is not an official copy of Council’s Minutes
                                                                                 Page 29 of 58

Section 30

ORDINARY MEETING MINUTES                                                      18 DECEMBER 2014


              b.   The densely planted buffer shall be located so as to allow for adequate
                   sight lines, be clear of existing and proposed services within the road
                   reserve, including the footpath, power lines (using appropriate species
                   where applicable), bus stop design and to provide shade to pedestrians.
              c.   Retention of existing local origin trees located within the proposed parks,
                   which are not required to be removed for the bioretention basin. An
                   arborist must inspect the trees before and after works, to confirm they are
                   not affected by any earthworks;
              d.   New roads are to be landscaped with a minimum of 1 street tree with a
                   minimum pot size of 100 litres planted within the road reserve for every 8
                   metres of road frontage including around the cul de sac, which provide a
                   good-sized canopy to allow good shade once fully mature. Further to the
                   native street trees recommended for planting within PSP03, Council also
                   recommends the planting of 100 litre appropriate edible fruit tree species
                   as part of the road reserve plantings and located at the end of each
                   property boundary, to minimise impacts from construction and future
                   driveways.
              e.   Tree plantings must maintain a minimum horizontal clearance a minimum
                   distance of:
                   i.        2m from stormwater catchpits;
                   ii.       4m from overhead lighting; and
                   iii.      Landscaping plants within these clearances must be low growing
                             when mature and suitable Council approved varieties.
        11.   Landscaping of the road reserve is to be completed in accordance with the
              approved landscaping plan prior to acceptance of the development ‘On
              Maintenance’ and maintained thereafter for a three (3) year period to the
              reasonable satisfaction of Council.
        Vegetation Protection & Weed Removal
        12.   Prior to issue of a Development Permit for Operational Works, an Ecological
              Restoration Plan and Specifications for the proposed park shall be approved by
              Council. The restoration plan shall include the following:
              a.   A plan indicating revegetation, including a species palette incorporating
                   the species selection of only native indigenous species;
              b.   Measurable and achievable criteria on which the performance of the
                   floristic and structural component of the re-vegetation strategy can be
                   assessed annually over 3 years, including no weeds in the park area for
                   all of the annual assessments and at the end of the re-vegetation period.
              c.   Control of all weed species listed in the following standards and
                   legislation:
                   i.      Declared plants under the Land Protection (Pest and Stock Route
                           Management) Act 2002 and sub-ordinate Regulation 2003.
                   ii.     Council listed Environmental Weeds, exotic grasses and other
                           plants identified in writing by Council.
              d.   All rehabilitation and revegetation must be completed prior to Council
                   endorsement of the Plan of Survey.
              e.   The area identified as Park on the Approved Plans must be dedicated to
                   the Crown as a reserve for Park purposes.
                   The land to be dedicated is “non-trunk infrastructure” for the purposes of
                   the Sustainable Planning Act 2009.

                          This is not an official copy of Council’s Minutes
                                                                                   Page 30 of 58

Section 31

ORDINARY MEETING MINUTES                                                 18 DECEMBER 2014


        ENGINEERING
        External Works
        13.   Elm Street must be upgraded for the length of its frontage to the subject site.
              The works must be undertaken in accordance with an Operational Works
              approval and must include in particular:
              a.   construction of kerb and channelling (OR table drain) and underground
                   stormwater drainage for the full frontage of the development site;
              b.   installation of street, pathway and bus stop lighting; and
              c.   widening and sealing of the existing road pavement to include the bus
                   stop and the entry and departure tapers.
                   The Elm St pathway infrastructure is imposed pursuant to s646 of the
                   Sustainable Planning Act 2009 being necessary trunk infrastructure
                   identified by Council’s LGIP to service the development. All other
                   infrastructure is imposed pursuant to s665 of the Sustainable Planning
                   Act 2009 being non-trunk infrastructure.
        14.   The new road must join smoothly with the existing formation of Blue Wren
              Court. The works must be undertaken in accordance with an Operational Works
              approval and be designed and constructed in accordance with Council’s
              Planning Scheme Policy 5 – Engineering Design Standards - Roads, Drainage
              and Earthworks. The works must include in particular:
              a.   provision of sight distances adequate for the design speed of the road;
              b.   relocation of the existing footpath, services and property accesses; and
              c.   retention of all existing parking facilities on Blue Wren Court.
              This condition is imposed pursuant to s665 of the Sustainable Planning Act
              2009 being non-trunk infrastructure.
        Bus Stop
        15.   The developer must design and construct a bus stop on the Elm Street frontage
              of the site. The works must be undertaken in accordance with an Operational
              Works approval and must include in particular:
              a.   The proposed bus stop is to be “Indented” and be in accordance with the
                   current TransLink Public Transport Infrastructure Manual. The bus stop
                   must contain all Mandatory and Preferred components as stated in the
                   manual, and be constructed in accordance with the new Noosa Council
                   Custom Design Rural Bus Shelter; and
              b.   The design for the bus stop shall consider a Pedestrian Refuge Island
                   and a coupled bus stop (indented but unsheltered) on the opposite side of
                   Elm Street for future construction.
              This condition is imposed pursuant to s665 of the Sustainable Planning Act
              2009 being non-trunk infrastructure.
        Blue Wren Close Road Works
        16.   The developer must construct 4 indented carparking bays on the northern side
              of Blue Wren Close between the development site and Lake Macdonald Drive
              with the final location determined in conjunction with Council. The works must
              be undertaken in accordance with an Operational Works approval.
              This condition is imposed pursuant to s665 of the Sustainable Planning Act
              2009 being non-trunk infrastructure.

                     This is not an official copy of Council’s Minutes
                                                                                Page 31 of 58

Section 32

ORDINARY MEETING MINUTES                                                  18 DECEMBER 2014


        New Roads
        17.   The new roads shown on the Approved Plans must be constructed in
              accordance with the conditions of this Decision Notice and dedicated as road
              reserve at no cost to Council.
              This condition is imposed pursuant to s665 of the Sustainable Planning Act
              2009 being non-trunk infrastructure.
        18.   The new roads as shown on the Approved Plans must be designed and
              constructed in accordance with Council’s Planning Scheme Policy 5 –
              Engineering Design Standards - Roads, Drainage and Earthworks. The works
              must be undertaken in accordance with an Operational Works approval and
              must include in particular:
              a.   Reserve and formation widths to an “Access Road” standard;
              b.   sealing, drainage, kerbing and channelling;
              c.   construction of pedestrian footpaths in accordance with the conditions of
                   this Decision Notice;
              d.   installation of street and pathway lighting; and
              e.   For roads terminating in a cul-de-sac, a circular turning area of sufficient
                   size to accommodate the single forward motion turn of a Waste Collection
                   Vehicle (WCV) clear of private driveways on-street parking and speed
                   control devices.
        19.   A temporary sealed turnaround facility must be constructed at the end of each
              road left temporarily incomplete as a result of the development staging. The
              temporary turnaround facility must be in accordance with an Operational Works
              approval and must be of sufficient size to accommodate the 3-point turn
              manoeuvre of a Waste Collection Vehicle (WCV).
              This condition is imposed pursuant to s665 of the Sustainable Planning Act
              2009 being non-trunk infrastructure.
        Property Access and Driveways
        20.   A residential driveway must be constructed to Lots 43-47. The residential
              driveway for Lot 44 must extend for the full length of the access handle. The
              works must be undertaken in accordance with an Operational Works approval.
        21.   Vehicle access to Lots 44-46 is limited to the new road only. A clause must be
              included in the contract of sale for Lots 44-46 which prohibits vehicle access
              being taken from Elm Street.
        Pedestrian and Bicycle Facilities
        22.   Pedestrian and bicycle facilities must be provided for the development. The
              works must be undertaken in accordance with an Operational Works approval
              and must include in particular:
              a.   a new 2 metre wide footpath within the road verge for the entire length of
                   the site’s frontage to Elm Street;
              b.   a 2 metre wide footpath along southern side of the new road and
                   extending to the existing pathway in Blue Wren Close;
              c.   a 2 metre wide path across the frontages of proposed lots 33 and 34;
              d.   a 2 metre wide footpath between lots 46 and 47 extending from the new
                   path in Elm Street to the path in the new road; and
              e.   Pram crossings where applicable.
              This condition is imposed pursuant to s665 of the Sustainable Planning Act
              2009 being non-trunk infrastructure.
                      This is not an official copy of Council’s Minutes
                                                                                Page 32 of 58

Section 33

ORDINARY MEETING MINUTES                                                  18 DECEMBER 2014


        Stormwater Drainage
        23.   The site must be provided with a stormwater drainage system connecting to a
              lawful point of discharge. The works must be undertaken in accordance with an
              Operational Works approval and the Queensland Urban Drainage Manual, and
              must include in particular:
              a.    the works generally as shown on drawing number 1225-33 revision A and
                    dated 06/14 prepared by Callaghan and Toth;
              b.    provision of kerb adapters for all new lots; and
              c.    extension of the site stormwater system to accommodate stormwater
                    from external to the site, including registration of drainage easements.
              This condition is imposed pursuant to s665 of the Sustainable Planning Act
              2009 being non-trunk infrastructure.
        24.   All elements of the stormwater drainage system, including any necessary scour
              protection, must be wholly contained within the subject site, existing and/or new
              road reserves.
        Easements
        25.   Unless otherwise agreed in writing by the relevant service provider, any public
              or third party infrastructure located on the subject site must be placed within an
              easement registered against the title of the property.
        26.   All easements must be designed in accordance with the planning scheme and
              granted at no cost to the Grantee. Where the Grantee is Council or a service
              authority, the easement documentation must be in accordance with the
              Grantee’s standard easement terms. Draft easement documentation must be
              submitted to Council for endorsement.
        27.   All works must be kept clear of any existing or proposed easements on the
              subject land, unless agreed otherwise in writing by the Grantee.
        Earthworks and Retaining Walls
        28.   All fill and associated batters must be contained entirely within the subject site
              unless written permission from the respective landowner(s) is provided to
              Council.
        29.   All earthworks must be undertaken in accordance with the provisions of
              Australian Standard AS3798: Guidelines on Earthworks for Commercial and
              Residential Developments.
        30.   Where the development involves excavation or filling over, or adjacent to,
              drainage, water supply or sewerage infrastructure, all access chamber surface
              levels must be adjusted to provide a freeboard of 100mm above the finished
              ground surface level.
        31.   All retaining walls must be designed and constructed in accordance with the
              planning scheme and must be certified by an RPEQ where exceeding 1.0m in
              height. All retaining walls that are publicly accessible and exceed 1.0m in
              height must be fitted with a commercial grade safety fence.
        Electricity and Telecommunication Services
        32.   Underground reticulated electricity and telecommunication services must be
              provided to each lot in accordance with an approval for Operational Works and
              the standards and requirements of the relevant service provider.



                      This is not an official copy of Council’s Minutes
                                                                                 Page 33 of 58

Section 34

ORDINARY MEETING MINUTES                                                  18 DECEMBER 2014


        33.   Unless otherwise stipulated by telecommunications legislation at the time of
              construction, the development must be provided with all necessary conduits,
              pits and pipes to accommodate the future connection of optic fibre technology
              telecommunications.
        34.   Certification must be submitted to Council from all relevant service providers
              which certifies that the development has met the requirements of this Decision
              Notice and all applicable legislation at the time of construction.
        Street and Pathway Lighting
        35.   Street lighting and pathway lighting throughout the subdivision shall have a high
              energy efficient rating to the reasonable satisfaction of Council and shall
              generally be provided in accordance with the principles of Council’s Planning
              Scheme Policy 5.
        UNITYWATER
        The following Unitywater conditions are applied in accordance with the South East
        Queensland (Distribution and Retail) Restructuring Act 2009 and Unitywater’s Interim
        Connections Policy. The conditions below form part of a water connection aspect
        which are taken to be a water approval for a staged connection. Any future
        applications must be made to Unitywater under South East Queensland (Distribution
        and Retail) Restructuring Act 2009. Unitywater can be contacted at
        [email protected]
        Water and Sewerage
        36.   Reticulated water must be provided to each lot in the development. This must
              include:
              a.   Ensuring that internal water pipes are wholly contained within the lot they
                   will serve.
              b.   An approved water meter for each lot in accordance with Unitywater and
                   SEQ Standard Drawings.
              c.   Provision of a water service from the existing 100mm diameter water
                   main located in Blue Wren Place to service each lot within the proposed
                   subdivision in accordance with Unitywater and SEQ Standard Drawings.
              d.   Water meters must be located on alternative boundaries to electrical
                   pillars.
              e.   The fire-fighting demand on Unitywater’s water supply system from the
                   development must not exceed 15 litres per second.
        37.   Reticulated sewerage must be provided to each lot in the development. This
              must include:
              a.   Ensuring sewer house drains are wholly contained within the Lot they will
                   serve.
              b.   Provision of sewerage infrastructure to within the property boundaries of
                   each lot within the proposed subdivision.
        38.   A minimum clearance of 1.5 metres must be maintained between Unitywater
              sewers and proposed building envelopes, buildings and other structures
        39.   Easements of between 3 and 10 metres must be provided over all Unitywater
              sewers located within property boundaries in accordance with the SEQ
              standards. Easements shall be centred over the pipe. Easement terms shall be
              the most current registered dealing held by the Department of Natural
              Resources & Mines and shall not be altered or amended.

                      This is not an official copy of Council’s Minutes
                                                                                Page 34 of 58

Section 35

ORDINARY MEETING MINUTES                                                  18 DECEMBER 2014


        40.   Stormwater retention systems and gross pollutant traps must maintain a
              minimum clearance of 1.5 metres from Unitywater water supply and sewerage
              infrastructure
        41.   Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
              Unitywater water mains and 1.5 metres from Unitywater sewerage mains.
              Landscaping plants within these clearances must be low growing when mature
              and suitable Unitywater approved varieties.
        42.   Construction works undertaken in the vicinity of Unitywater water supply or
              sewerage infrastructure must not adversely affect the integrity of the
              infrastructure. All costs associated with repair, replacement or alteration of
              infrastructure must be met by the applicant.
        ADVISORY NOTES
        The following notes are included for guidance and information purposes only and do
        not form part of the assessment manager conditions:
        Aboriginal Cultural Heritage Act 2003
        1.    There may be a requirement to establish a Cultural Heritage Management Plan
              and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003
              (ACH Act).
              The ACH Act establishes a cultural heritage duty of care which provides that: “A
              person who carries out an activity must take all reasonable and practicable
              measures to ensure the activity does not harm Aboriginal cultural heritage”. It is
              an offence to fail to comply with the duty of care. Substantial monetary
              penalties may apply to individuals or corporations breaching this duty of care.
              Injunctions may also be issued by the Land and Resources Tribunal, and the
              Minister administering the ACH Act can also issue stop orders for an activity
              that is harming or is likely to harm Aboriginal cultural heritage or the cultural
              heritage value of Aboriginal cultural heritage.
              You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any
              obligations under the ACH Act.
        Co-ordination of Operational Works Assessment
        2.    Additional application fees apply to Operational Work applications where the
              different aspects of the works are lodged separately. Significant savings in
              application fees will result if all works are lodged in a single application.
        Preparation of a Preliminary Construction Management Plan
        3.    A preliminary Construction Management Plan must be submitted with the
              Operational Works application and must address the following:
              a.   traffic management during all aspects of the construction phase including:
                   i.     a Traffic Management Control Plan in accordance with the Manual
                          of Uniform Traffic Control Devices (MUTCD) detailing all temporary
                          signage and traffic control measures prior to construction.
                   ii.    maintenance of safe pedestrian access for the areas affected by the
                          works during and after daily construction has ceased.
                   iii.   proposed fencing to the site during the construction phase of the
                          development.
                   iv.    approval of the Traffic Management Control Plan by the Department
                          of Transport and Main Roads (DTMR) for any works on State
                          controlled roads.
                   v.     provision for worker car parking.

                      This is not an official copy of Council’s Minutes
                                                                                 Page 35 of 58

Section 36

ORDINARY MEETING MINUTES                                                       18 DECEMBER 2014


             b.      maintenance and protection of water quality and existing drainage lines
                     through the construction site, through the implementation of appropriate
                     erosion and sediment control measures
             c.      works programme identifying key components of the works and their
                     respective durations
             d.      establishment of a communication protocol with the general public,
                     adjoining owners, emergency services and local businesses to advise of
                     agreed construction times, impacts on traffic, services and other relevant
                     issues
             e.      identification of complaint management procedures including:
                     i.       contact details for the on-site manager
                     ii.      dispute resolution procedures
             f.      details on the location of external fill sites/sources, the haulage route,
                     type of vehicle to be utilised during filling operations and frequency of
                     usage. NB any damage to the existing road system as a result of haulage
                     operations shall be fully repaired at the applicant’s expense
             g.      it is acknowledged that the preliminary Construction Management Plan
                     will be a draft document requiring finalisation upon appointment of the
                     Principal Contractor employed to construct the works and a final
                     document will be required to be submitted at the Pre-Start Meeting for the
                     project.
        Property Notes
        4.   The following property notes shall be placed against the relevant lots advising
             the following:
                   A Rail and Traffic Noise Study has been undertaken for new buildings on
                     this property. New buildings shall be constructed in accordance with the
                     conclusions of the study and the Queensland Development Codes (QDC)
                     MP 4.4 – Building in a Transport Corridor (or equivalent codes/guidelines
                     at the time of building).
                   No direct vehicular access to Elm Street is permitted.
        Development Compliance Inspection
        5.   Prior to the commencement of the use, please contact Council to arrange a
             Development Compliance Inspection.
        Unitywater
        6.   Connection to the Unitywater live water supply and live sewerage system must
             be undertaken by Unitywater at the applicant’s cost.
        Infrastructure Charges
        7.   This Development Permit triggers an “Infrastructure Charge Notice” to be
             issued in for Council “trunk” infrastructure in accordance with Council’s
             “Adopted Infrastructure Charges Resolution” under the State Planning
             Regulatory Provision (Adopted Charges) and the Sustainable Planning Act
             2009.




                           This is not an official copy of Council’s Minutes
                                                                                    Page 36 of 58

Section 37

ORDINARY MEETING MINUTES                                                     18 DECEMBER 2014


    B.   Find the following are sufficient grounds to justify the decision despite the conflict with
         the Planning Scheme:
         1.    The development provides for a practical infill development to support a
               growing urban settlement of permanent residents in Cooroy.
         2.    The proposal is compatible with the residential zoned land surrounding the site;
         3.    The proposed residential uses are compatible with the constrained site access
               provided via Blue Wren Place, with more intensive development unlikely to be
               suitable.
         4.    The use of the site for residential uses will not unduly impact Cooroy’s ability to
               provide for a range of community uses.


5   DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE FOR AN
    UNDEFINED USE - TEMPORARY SHORT-TERM SELF-CONTAINED RV STOP AT 154
    HOLTS ROAD, COOROY - MCU14/0060
    Item not dealt with by Planning & Organisation Committee.               Referred to General
    Committee for consideration.
    Reason for referral: Planning & Organisation Committee Councillors suggest a
    significant reduction in the length of time for visitor stays.


6   DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE FOR AN
    INDUSTRIAL BUSINESS - TYPE 2 PRODUCTION, ALTERATION, REPACKAGING &
    REPAIRING (SOFT DRINK FACTORY) AT 271 LAKE MACDONALD DRIVE, LAKE
    MACDONALD - MCU14/0073
    That Council note the report by the Coordinator Planning to the Planning & Organisation
    Committee Meeting dated 9 December 2014 regarding Application No. MCU14/0073 for a
    Development Permit for Material Change of Use for an Industrial Business - Type 2
    Production, alteration, repackaging & repairing (Soft Drink Factory) situated at 271 Lake
    Macdonald Drive, Lake Macdonald and:
    A.   Approve the application in accordance with the following conditions:
         PLANNING
         When Conditions Must be Complied With
         1.    Unless otherwise stated, all conditions of this Decision Notice must be complied
               with prior to the use commencing, and then compliance maintained at all times
               while the use continues.
         Approved Plans
         2.    Development undertaken in accordance with this approval must generally
               comply with the approved plans of development. The approved plans are listed
               in the following table unless otherwise amended by these conditions.
                Plan No.              Rev.   Plan/Document Name                             Date
                1281-14 Sheet 02      -      Site Plan – Drawn by Zenith Design             -

                1281-14 Sheet 03      -      GF Overall - – Drawn by Zenith Design          -

                1281-14 Sheet 04      -      GF Office Layout – Drawn by Zenith Design      -




                       This is not an official copy of Council’s Minutes
                                                                                     Page 37 of 58

Section 38

ORDINARY MEETING MINUTES                                                  18 DECEMBER 2014



               1281-14 Sheet 05     -      FF Overall – Drawn by Zenith Design          -

               1281-14 Sheet 06     -      FF Office Layout – Drawn by Zenith Design    -

               1281-14 Sheet 07     -      Elevations – Drawn by Zenith Design          -

               1281-14 Sheet 12     -      Driveway Layout – Drawn by Zenith Design     -
        Nature and Extent of Approved Use
        3.    The extent of the approved use is limited to that part of the existing building
              identified on the approved plans.
        4.    The approved use must not operate outside of the hours of 7am to 5pm
              Monday to Saturday.
        5.    No more than 30 employees shall be on site at any one time.
        6.    Any display and retail sale of goods resulting from the premises must remain an
              ancillary component to the approved use and must not exceed 200m 2 of use
              area.
        Heavy Vehicle Movements
        7.    Heavy vehicle movements associated with the approved use shall not exceed
              10 return trips per day.
        Street Identification
        8.    The street address of the development must be clearly visible and discernible
              from the frontage of the site by the provision of a street number and, where
              appropriate, the building name.
        Performance Bond
        9.    Security in the form of a cash bond or trading bank guarantee to the sum of
              $10,000 must be submitted to Council, to secure performance of all conditions
              of this approval, prior to commencement of operational works associated with
              the development. The cash bond or trading bank guarantee will be returned on
              performance of the conditions of approval less any costs incurred by Council in
              respect of enforcing performance of this permit. Council reserves the right to
              call upon the bond or guaranteed sum to effect compliance with condition.
        CIVIL ENGINEERING

        External Works
        10.   That part of the Lake Macdonald Drive frontage of the site extending from the
              existing culvert adjacent to “Gate 2” to a point approximately 85 metres to the
              south west must be upgraded. The works must be undertaken in accordance
              with an Operational Works approval and must include in particular:
              a.    linemarking to clearly indicate a left turn lane for vehicles accessing the
                    site
              b.    road widening to provide for the left turn lane (where necessary)
              c.    reconstruction of the existing table drain to ensure that the road formation
                    is free draining
              d.    the reshaping of the verge to ensure that sediment is not transported onto
                    the road formation.



                      This is not an official copy of Council’s Minutes
                                                                                 Page 38 of 58

Section 39

ORDINARY MEETING MINUTES                                                  18 DECEMBER 2014


        Site Access and Driveways
        11.   Sealed access driveways must be provided from Lake Macdonald Drive to all
              parking and manoeuvring areas of the development. The works must be
              undertaken in accordance with an Operational Works approval and must
              include in particular:
              a.    a driveway crossover generally in accordance with IPWEAQ standard
                    drawing SEQ R-051
              b.    a driveway width sufficient to cater for regular use by a HRV and the
                    occasional use by a semi-trailer (AV)
              c.    all damaged sections of the existing hardstand driveway must be
                    replaced with a suitable similar surface
        Car Parking
        12.   A minimum of 64 car parking spaces must be provided and marked on the site.
              The spaces must be available and accessible at all times while the use is open
              for business.   The works must be undertaken in accordance with an
              Operational Works approval and must include in particular:
              a.    44 staff parking spaces within the total, which are clearly marked for that
                    purpose
              b.    20 visitor/customer parking spaces within the total, which are clearly
                    marked for that purpose and accessible at all times for visitor/customer
                    use
              c.    2 disabled parking space/s within the total
              d.    a sealed surface with crossfalls and gradients in accordance with
                    Australian Standard AS2890: Parking Facilities
        13.   Directional signage must be provided to direct visitors and customers to the car
              parking spaces provided on site.
        Bicycle Parking & End of Trip Facilities
        14.   Bicycle facilities in accordance with AS2890.3 Bicycle Parking Facilities must
              be provided for the development. The facilities must be indicated on the plans
              and submitted in accordance with an Operational Works approval and must
              include in particular:
              a.    a total of 10 bicycle parking spaces
              b.    end of trip facilities involving a minimum of 5 lockers and 1 shower cubicle
                    with an ancillary change room.
        Damage to Services and Assets
        15.   Any damage caused to existing services and assets as a result of the
              development works must be repaired at no cost to the asset owner at the
              following times:
              a.    where the damage would cause a hazard to pedestrian or vehicle safety,
                    immediately; or
              b.    where otherwise, upon completion of the works associated with the
                    development.
              c.    Any repair work which proposes to alter the alignment or level of existing
                    services and assets must first be referred to the relevant service authority
                    for approval.

                      This is not an official copy of Council’s Minutes
                                                                                 Page 39 of 58

Section 40

ORDINARY MEETING MINUTES                                                  18 DECEMBER 2014


        Stormwater Drainage
        16.   The site must be provided with a stormwater drainage system connecting to a
              lawful point of discharge. The works must be undertaken in accordance with an
              Operational Works approval, the Queensland Urban Drainage Manual and
              Engineering report dated 3 September 2013 by Barlow Shelly Consulting
              Engineers (with the works expanded to reflect the extended development area).
        Stormwater Quality Management
        17.   A stormwater quality treatment system must be provided for the development.
              The works must be undertaken in accordance with an Operational Works
              approval and must include in particular:
              a.   stormwater quality treatment devices of a size and location generally in
                   accordance with those shown in section 5.0 and 6.0 of the of the
                   Engineering report dated 3 September 2013 by Barlow Shelly Consulting
                   Engineers (with the works expanded to reflect the extended development
                   area)
              b.   swales which are designed in accordance with the Water Sensitive Urban
                   Design Technical Design Guidelines for South East Queensland
              c.   The works must be undertaken in accordance with the Bioretention
                   Technical Design Guidelines (Water by Design, 2012)
        18.   All stormwater quality treatment devices must be maintained in accordance with
              the Water by Design (2009) Maintaining Vegetated Stormwater Assets (Version
              1). The approved Operational Works drawings for the stormwater quality
              treatment system and detailed life cycle costing of the system must be attached
              as an addendum to this document. Records of all maintenance activities
              undertaken must be kept and made available to Council upon request.
        Stormwater Harvesting
        19.   Operating stormwater harvesting tanks must be provided for the development.
              The tanks must be provided in accordance with an Operational Works approval
              and must include in particular:
              a.   the details identified in section 5.0 and 6.0 of the of the Engineering report
                   dated 3 September 2013 by Barlow Shelly Consulting Engineers (with the
                   works expanded to reflect the extended development area).
        LANDSCAPE & ECOLOGY
        Landscaping Works
        20.   The development must be landscaped, in accordance an approval for
              Operational Works. The particular works must generally accord with the
              planning scheme Landscape Code and Planning Scheme Policy 3 Landscaping
              Plants and Guidelines and include:
              a.   Landscaping to car park areas, including shade trees
              b.   Vegetated buffer to the Lake Macdonald Drive
              c.   Vegetated screening of any electrical transformers, bin storage areas and
                   the like from the road frontage
              d.   Details of any proposed clearing of vegetation and details of retention of
                   any existing trees on the site and road verge to accommodate the
                   approved development footprint. An Arborist Report is required to validate
                   any proposed clearing.


                     This is not an official copy of Council’s Minutes
                                                                                 Page 40 of 58

Section 41

ORDINARY MEETING MINUTES                                                     18 DECEMBER 2014


              e.   Removal of all weeds species listed in the following standards and
                   legislation:
                   i.       Declared plants under the Land Protection (Pest and Stock Route
                            Management) Act 2002 and sub-ordinate Regulation 2003
                   ii.      undesirable species, as defined within Planning Scheme Policy 3
                            Landscaping Plants and Guidelines of the Noosa Plan.
        21.   All landscape works must be established and maintained in accordance with
              horticultural best practice with construction techniques and irrigation that allow
              for healthy, sustained and vigorous plant growth. All plant material must be
              allowed to grow to full form and be refurbished when its life expectancy is
              reached.
        Rehabilitation
        22.   The land area defined by the vegetated portion contained within the Riparian
              Buffer Area of the Biodiversity Overlay of the Noosa Plan on the subject must
              be rehabilitated in accordance with a rehabilitation plan prepared by a suitably
              qualified person and an approval for Operational Works. Rehabilitation works
              must:
              a.   restore the habitat value of the land to meet the characteristics of the
                   appropriate regional ecosystem
              b.   return the land to its natural undisturbed state, where practicable. Where
                   impracticable, provide justification.
              c.   The treatment of undesirable species, as defined within Planning Scheme
                   Policy 3 Landscaping Plants and Guidelines of the Noosa Plan.
        ENVIRONMENTAL HEALTH
        Refuse Management
        23.   The developer must provide waste storage and disposal facilities in accordance
              with Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and
              Commercial and Industrial Premises”, including an external imperviously paved
              area correctly sized for all refuse and recycling containers and suitably
              screened from public places and neighbouring properties. A bin wash area is
              required with a cold-water tap, hose and drain outlet connected to the effluent
              disposal system, via a bucket trap. The drain outlet is to be designed to prevent
              storm water entry to the effluent system and this can be achieved with a nib
              wall 50mm high and up to 700mm x 700mm wide (max 0.5m²), or alternatively
              the waste area can be roofed, or any other design approved by Council’s
              delegate.
        24.   The development must allow refuse-loading areas to be located off street. All
              vehicles associated with the collection of waste/recyclables, shall enter and
              leave the site in a forward direction.
        25.   A Waste Management Plan (Operational) in accordance with Planning Scheme
              Policy No. 9 “Waste Management Multi-Dwellings and Commercial and
              Industrial Premises”, shall be developed and implemented on site. The Waste
              Management Plan must include the following as a minimum: -
                 The types and estimated volumes of waste that will be generated from the
                   activities approved within the development.
                 Methods to be used for dealing with garden waste.
                 Initiatives to minimise waste either by waste prevention, reduction, re-use
                   or recycling.
                         This is not an official copy of Council’s Minutes
                                                                                  Page 41 of 58

Section 42

ORDINARY MEETING MINUTES                                                   18 DECEMBER 2014


                  Description of procedures and clearly identified site responsibilities for all
                    site occupants for getting all waste to the bins; the storage of bins and the
                    collection of bins by the contractor.
                  A description of the design details of waste storage and recycling areas
                    including size, location, elevation and floor plan, methods of bin washing
                    and system to prevent storm water getting into the effluent system via the
                    bin wash.
                  A description of types and volume of waste storage containers to be
                    used, and the collection frequency of containers,
                  The waste and recycling storage area shall include the provision of
                    containers for all waste and recycling materials including putrescible
                    matter, non-recycling waste, paper/ cardboard, glass, aluminum/steel
                    cans, waste oil, Styrofoam boxes, etc.
        Effluent Disposal
        26.   All factory wastewater and wash down waters shall be collected, treated and
              disposed of lawfully on site in an approved effluent disposal system.
        PLUMBING
        Plumbing, Drainage and Waste Water Treatment and Disposal
        27.   The development must be provided with Plumbing, Drainage and an On-site
              Waste Water Treatment and Effluent Disposal System having a capacity
              sufficient for the use*.
               *(Refer to Advisory Note)
        Advisory Notes
        PLANNING
        Aboriginal Cultural Heritage Act 2003
        1.    There may be a requirement to establish a Cultural Heritage Management Plan
              and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003
              (ACH Act).
              The ACH Act establishes a cultural heritage duty of care which provides that: “A
              person who carries out an activity must take all reasonable and practicable
              measures to ensure the activity does not harm Aboriginal cultural heritage”. It is
              an offence to fail to comply with the duty of care. Substantial monetary
              penalties may apply to individuals or corporations breaching this duty of care.
              Injunctions may also be issued by the Land and Resources Tribunal, and the
              Minister administering the ACH Act can also issue stop orders for an activity
              that is harming or is likely to harm Aboriginal cultural heritage or the cultural
              heritage value of Aboriginal cultural heritage.
              You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any
              obligations under the ACH Act.
        Equitable Access and Facilities
        2.    The plans for the proposed building work have NOT been assessed for
              compliance with the requirements of the National Construction Code - Building
              Code of Australia (Volume 1) as they relate to people with disabilities. Your
              attention is also directed to the fact that in addition to the requirements of the
              National Construction Code as they relate to people with disabilities, one or
              more of the following may impact on the proposed building work:



                      This is not an official copy of Council’s Minutes
                                                                                  Page 42 of 58

Section 43

ORDINARY MEETING MINUTES                                                 18 DECEMBER 2014


             a.    the Disability Discrimination Act 1992 (Commonwealth);
             b.    the Anti-Discrimination Act 1991 (Queensland); and
             c.    the Disability (Access to Premises – Buildings) Standards.
        Development Compliance Inspection
        3.   Prior to the commencement of the use, please contact Council's Development
             Audit & Response Unit to arrange a Development Compliance Inspection.
        Building and Construction Industry (Portable Long Service Leave) Levy
        4.   The QLeave levy must be paid prior to the issue of a development permit where
             it is required. Council will not be able to issue a Decision Notice without receipt
             of details that the Levy has been paid. QLeave contact: 1800 803 481 (free call)
             or (07) 3212 6855.
        Co-ordination of Operational Works Assessment
        5.   Additional application fees apply to Operational Work applications where the
             different aspects of the works are lodged separately. Significant savings in
             application fees will result if all works are lodged in a single application.
        Preparation of a Preliminary Construction Management Plan
        6.   The works identified in this Decision Notice will be required to be carried out in
             accordance with a Construction Management Plan endorsed by Council
             through an approval for Operational Works. To ensure expedient assessment
             of any Operational Works application, the applicant is advised to submit a
             preliminary Construction Management Plan that addresses the requirements of
             the planning scheme. In particular, the preliminary Construction Management
             Plan should address the following:
             a.    provisions that ensure the proposed construction does not unduly impact
                   on the surrounding area and ensure the site is safe for members of the
                   public, implementing appropriate traffic signage in accordance with the
                   Manual of Uniform Traffic Control Devices (MUTCD) and making
                   provision for safe pedestrian access across the frontage of the site both
                   during daily construction and after daily construction has ceased.
        Plumbing, Drainage, Waste Water Treatment and Disposal System
        7.   The establishment of Plumbing and Drainage and a waste water treatment and
             disposal system for the site requires a Compliance Permit to be obtained from
             Council under the Plumbing and Drainage Act 2002. The system must be
             designed in accordance with the Queensland Plumbing and Wastewater Code,
             Australian Standards AS/NZS3500, AS/NZS1547: 2000 “On-site Domestic
             Wastewater Management”.
        8.   The existing Waste Water Treatment and Disposal System for the site is as
             mentioned in the report from Barlow Shelley, Consulting Engineers, Section 8 ,
             Reference number 1014 Dated 3rd September 2013, is capable of
             accommodating the proposed changes to the development.
        9.   If design requirements for the site change, whereby the development exceeds
             the accommodation or use of 21 or more equivalent persons, or generates a
             requirement for an ERA63, then an Operator’s Licence from The Department of
             Environment and Heritage Protection (DEHP) will also be required.




                     This is not an official copy of Council’s Minutes
                                                                                Page 43 of 58

Section 44

ORDINARY MEETING MINUTES                                                     18 DECEMBER 2014


         Health
         10.   Due regard should be given to the design and location of noise emitting fixed
               plant and equipment and any acoustic treatment that may be required. It is
               advised that an appropriately qualified acoustic consultant be involved with the
               selection and installation of such equipment. A qualified acoustic consultant can
               give advice on how to best locate and design the equipment such that it can
               meet statutory noise or planning requirements.
         11.   The Environmental Protection Act 1994 states that a person must not carry out
               any activity that causes, or is likely to cause, environmental harm unless the
               person takes all reasonable and practicable measures to prevent or minimise
               the harm. Environmental harm includes environmental nuisance. In this regard
               persons and entities, involved in the civil, earthworks and construction phases
               of development, are to adhere to their ‘general environmental duty’ to minimise
               the risk of causing environmental harm. Environmental harm is defined by the
               Act as any adverse effect, or potential adverse effect whether temporary or
               permanent and of whatever magnitude, duration or frequency on an
               environmental value and includes environmental nuisance. Therefore, no
               person should cause any interference with the environment or amenity of the
               area by reason of the emission of noise, vibration, smell, fumes, smoke,
               vapour, steam, soot, ash, dust, waste water, waste products, grit, sediment, oil
               or otherwise, or cause hazards likely in the opinion of the administering
               authority to cause undue disturbance or annoyance to persons or affect
               property not connected with the use.
         12.   In accordance with the Public Health Act 2005, rainwater tanks must be
               constructed with mosquito proof screens (made from either brass, copper,
               aluminium or stainless steel), and constructed with a mesh size of no more than
               1mm, and must be installed in a way that does not accelerate corrosion. Tanks
               that contain flap valves must be installed so that when closed, mosquitoes
               cannot pass through the valve. It is unlawful under the Public Health Act 2005
               to construct, install or be in possession of a tank that does not comply with
               these requirements.
    B.   Find the following are sufficient grounds to justify the decision despite the conflict with
         the Planning Scheme:
         1.    The development allows the re-use of the existing industrial building on the site
               and improved built form, landscaping and environmental outcomes on the site;
               and
         2.    The site has existing use rights for a major industrial use (brickworks), which is
               also categorised as an Industrial Use Type 2 under The Noosa Plan, and the
               proposal is of substantially lesser intensity




                       This is not an official copy of Council’s Minutes
                                                                                    Page 44 of 58

Section 45

ORDINARY MEETING MINUTES                                                         18 DECEMBER 2014


7   DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE FOR OPEN SPACE
    TYPE 1 - SPORT & RECREATION (EXPANSION OF NOOSA PAR 3 GOLF COURSE)
    AT 2 & 16 GOLDBERG COURT, NOOSAVILLE - MCU14/0068
    That Council note the report by the Coordinator Planning to the Planning & Organisation
    Committee Meeting dated 9 December 2014 regarding Application No. MCU14/0068 for a
    Development Permit for a Material Change of Use for Open Space – Type 1 Sport &
    Recreation (Extension to Existing Par 3 Golf Course) situated at 2 & 16 Goldburg Court,
    Noosaville and:
    A.   Approve the application in accordance with the following conditions:
         MCU Conditions
         PLANNING & ENVIRONMENT
         When Conditions must be Complied With
         1.    Unless otherwise stated, all conditions of this Decision Notice must be complied
               with prior to the use commencing, and then compliance maintained at all times
               while the use continues.
         Approved Plans
         2.    Development undertaken in accordance with this approval must generally
               comply with the approved plans of development. The approved plans are listed
               in the following table and may be amended by these conditions.

                    Plan No.         Rev.     Plan/Document Name                            Date

                    SD-01            A        Noosa Par 3 Golf Course Proposed Extension    15/08/14
                                              prepared by the DFS Group

         Landscaping & Ecology
         3.    Landscaping and rehabilitation works must be undertaken on Lot 2 RP223289
               in accordance with an Operational Works approval and Planning Scheme
               Policy - PSP 3 Landscaping Plants and Guidelines and must include an
               ecological rehabilitation and landscaping plan, prepared by a suitably qualified
               person* and must include in particular:
               a.      Screening vegetation to adjacent residences to the east to provide
                       privacy and protection from line-of-play.
               b.      rehabilitated and revegetation of the riparian area to the existing creekline
                       with native trees and understorey plantings for an area generally not less
                       than 35m wide either side of the centreline of the watercourse.
               c.      details of treatments to batters, armoury, plantings, weed treatment, and
                       rehabilitation.
               d.      a minimum maintenance period of 3 years.
               e.      a species palette and densities table incorporating the species selection
                       of only native indigenous species.
               f.      control of all weeds species listed in the following standards and
                       legislation:
                       i.       declared plants under the Land Protection (Pest and Stock Route
                                Management) Act 2002 and sub-ordinate Regulation 2003
                       ii.      Council Listed Environmental Weeds, Exotic Grasses and other
                                plants identified in writing by Council (*refer to Advisory Note).

                             This is not an official copy of Council’s Minutes
                                                                                      Page 45 of 58

Section 46

ORDINARY MEETING MINUTES                                                       18 DECEMBER 2014


        ENGINEERING
        Earthworks
        4.   All earthworks must be in compliance with the relevant codes and policies of
             The Noosa Plan (particularly the Earthworks Code) and undertaken in
             accordance with a Development Permit for Operational Works. The application
             for operational works for earthworks shall also include the details of any
             associated drainage works (eg swales, scour protection, stormwater pipes
             work).
        5.   Suitable construction management measures must be put in place prior to the
             commencement of development works on this site and for all stages of works,
             the measures must address in particular:
             a.      Traffic management during all aspects of the construction phase
                     including:
                     i.       Temporary signage and traffic control measures in accordance with
                              Manual of Uniform Traffic Control Devices (MUTCD) to provide
                              warning to drivers and road users of any safety hazard or changes
                              to traffic conditions due to the proposed works.
                     ii.      Details on the location of imported fill sources, the haulage route,
                              type of vehicle to be utilised during filling operations and frequency
                              of usage.
                              NOTE: any damage to the existing road system as a result of
                              haulage operations must be fully repaired at the applicant’s
                              expense
             b.      Effective procedures and measures to protect the Riparian Buffer and
                     existing natural flora and fauna.
             c.      Effective procedures and measures to minimise adverse environmental
                     impact on other properties and roads users including noise and dust
                     emission.
             d.      Establishment of a communication protocol with the adjoining owners and
                     any other affected parties to advise of construction times, impacts on
                     traffic and services and any other relevant issues.
        Stormwater Drainage
        6.   Stormwater runoff from the development areas must be disposed off in a
             controlled manner on site without causing erosion or adverse impacts on the
             environment and/or the existing drainage conditions on other properties (eg by
             concentrating or diverting additional flows and/or causing additional ponding on
             other properties) .
        7.   The development works must include stormwater management and treatments
             measures/devices that:
             a.      Are designed in accordance with the current version of the Deemed to
                     Comply Solutions by Water By Design; or
             b.      Are designed to treat stormwater to achieve 80% Reduction in Total
                     Suspended Solids, 60% Reduction in Total Phosphorous and 45%
                     Reduction in Total Nitrogen prior to discharge from the site compared to if
                     there was no water pollutant mitigation incorporated into the design.
             A Development Permit for Operational Works for stormwater management shall
             be required.

                           This is not an official copy of Council’s Minutes
                                                                                     Page 46 of 58

Section 47

ORDINARY MEETING MINUTES                                                    18 DECEMBER 2014


         Advisory Notes
         Building and Construction Industry (Portable Long Service Leave) Levy
         1.     The QLeave levy must be paid prior to the issue of a development permit where
                it is required. Council will not be able to issue a Decision Notice without receipt
                of details that the Levy has been paid. QLeave contact: 1800 803 481 (free call)
                or (07) 3212 6855.
         Aboriginal Cultural Heritage Act 2003
         2.     There may be a requirement to establish a Cultural Heritage Management Plan
                and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003
                (ACH Act).
                The ACH Act establishes a cultural heritage duty of care which provides that: “A
                person who carries out an activity must take all reasonable and practicable
                measures to ensure the activity does not harm Aboriginal cultural heritage”. It is
                an offence to fail to comply with the duty of care. Substantial monetary
                penalties may apply to individuals or corporations breaching this duty of care.
                Injunctions may also be issued by the Land and Resources Tribunal, and the
                Minister administering the ACH Act can also issue stop orders for an activity
                that is harming or is likely to harm Aboriginal cultural heritage or the cultural
                heritage value of Aboriginal cultural heritage.
                You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any
                obligations under the ACH Act.
    B.     Find the following are sufficient grounds to justify the decision despite the conflict
           with the Planning Scheme:
           1.    The development is an expansion of an existing approved golf course within
                 the Rural Settlement zone.
           2.    The golf course requires a large site that generally necessitates a rural
                 setting.
           3.    The development will not have significant adverse impacts on the amenity of
                 existing residents or the existing rural character of the area.


8   INDICATIVE COST REDUCTION FOR STREETLIGHT NETWORK CHARGES
    That Council note the report by the Manager Procurement / Fleet to the Planning &
    Organisation Committee Meeting dated 9 December 2014 regarding the anticipated cost
    reduction achieved by LGAQ / Local Buy for Council’s street lighting charges applicable to
    the 2015/16 budget.

9   FEES AND CHARGES UPDATE - NOOSA HOLIDAY PARKS
    That Council note the report by the Property Officer to the Planning & Organisation
    Committee Meeting dated 9 December 2014 and:
    A.   Set fees and charges for Noosa Holiday Parks to align with the cessation of June/July
         2016 Queensland school holidays; and
    B.   Adopt the Proposed General Cost Recovery Fees and Commercial Charges for
         Noosa Holiday Parks for the period ending 10 July 2016 as detailed in Attachment 1
         to report.




                        This is not an official copy of Council’s Minutes
                                                                                   Page 47 of 58

Section 48

ORDINARY MEETING MINUTES                                                    18 DECEMBER 2014


10   COMMUNITY JURY PROJECT
     That Council note the report by the Community Engagement Manager to the Planning &
     Organisation Committee Meeting dated 9 December regarding the Community Jury Project
     and endorse that the question for the first Community Jury be: “What is the best option for
     minimising organic waste sent to landfill?”


11   CHANGE OF VENUE FOR COUNCIL MEETINGS - 2015
     That Council note the report by the PA to the CEO to the Planning & Organisation
     Committee Meeting dated 9 December 2014 and:
     A.   Pursuant to Section 257(3)(b) of the Local Government Regulation 2012, resolve to
          hold its Ordinary Meeting on:
          1.    Thursday, 7 May 2015 at the Cooran Memorial School of Arts Hall, Cooran
                commencing at 6pm; and
          2.    Thursday, 19 November 2015 at The J, Noosa Junction commencing at 6pm.
     B.   Request the Chief Executive Officer to ensure that suitable advertising is undertaken
          to promote these community based Council Meetings.




                        This is not an official copy of Council’s Minutes
                                                                                 Page 48 of 58

Section 49

ORDINARY MEETING MINUTES                                                     18 DECEMBER 2014


GENERAL COMMITTEE RECOMMENDATIONS
15 DECEMBER 2014 - Crs Tony Wellington (Chair), Bob Abbot, Sandy Bolton, Joe
Jurisevic, Frank Pardon and Noel Playford

Apology: Cr Frank Wilkie


The Recommendations from the General Committee were adopted without
discussion or further amendment.

Council Resolution

Moved:           Cr Jurisevic
Seconded:        Cr Abbot

The General Committee recommendations dated 15 December 2014 be adopted.
                                                                                       Carried.




1    COUNCIL CABS & FLEXILINK SERVICES REVIEW - FURTHER REPORT
     That Council note the report by the Project Officer and Development Officer to the
     Infrastructure & Services Committee Meeting dated 9 December 2014 and the further
     report to the General Committee Meeting dated 15 December 2014 and request the CEO
     to arrange a Councillor/Staff Workshop to consider alternative transport proposals as
     outlined during discussions at the General Committee Meeting on the proposed Noosa
     Council Transport Assist service.


2    WASTE COLLECTION SERVICES POLICY - FURTHER REPORT
     That Council note the report by the Waste Coordinator to the Infrastructure and Services
     Committee Meeting dated 9 December 2014 and the further report to the General
     Committee Meeting dated 15 December 2014 and:
     A.     Rescind the existing Waste Collection Services Policy that transferred to the Noosa
            Council from the Sunshine Coast Council under the Local Government (De-
            amalgamation Implementation) Regulation; and
     B.     Approve the amended Noosa Council Waste Collection Services Policy provided as
            Attachment 1 to the further report incorporating the minor wording amendments noted
            at the meeting.




                         This is not an official copy of Council’s Minutes
                                                                                  Page 49 of 58

Section 50

ORDINARY MEETING MINUTES                                                   18 DECEMBER 2014


3   DEVELOPMENT APPLICATION FOR MCU - RV STOP MCU14/0060
    That Council note the report by the Coordinator Planning to the Planning & Organisation
    Committee Meeting dated 9 December 2014 regarding Application No. MCU14/0060 for a
    Temporary Development Permit for a Temporary Short Term Self-Contained RV Stop
    situated at 154 Holts Road, Cooroy and:
    A.   Approve the application in accordance with the following conditions:
         PLANNING

         When Conditions must be Complied With
         1.    Unless otherwise stated, all conditions of this Decision Notice must be complied
               with prior to the use commencing, and then compliance maintained at all times
               while the use continues.
         Approved Plans
         2.    Development undertaken in accordance with this approval must generally
               comply with the approved plans of development. The approved plans are listed
               below and as may be amended by the conditions herein.
                Plan No.         Rev.   Plan/Document Name                                Date
                13-3461AB        -      Plan of Proposed (Temporary) Short-Term, Self-    04/07/14
                                        Contained RV Stop at Lot 2 on RP893989 prepared
                                        by Max Watterson + Associates
         Nature and Extent of Approved Use
         3.    No more than 20 Recreational Vehicles (RV’s)(caravans, motorhomes or the
               like) may stay at the site at any one time.
         4.    Visitor stays shall not exceed 4 consecutive nights.
         5.    All RV’s shall be fully self-contained and must retain all grey water and black
               water via holding tanks.
         6.    No on-site release of grey water is permitted.
         Visitor Education
         7.    Visitors must be advised of the following requirements:
               a.    No on-site release of grey water or other waste
               b.    Location of nearest dump point and potable water supply
               c.    All dogs must be on a leash when walked in the area and must be
                     restrained at all times during the stopover period
               d.    Owners must pick up and collect their dogs’ faeces
               e.    Consideration be given for residents and road users when walking in the
                     area
               f.    Noise must be minimised after 8.30pm
         Street Identification
         8.    The street address of the development must be clearly visible from the Holts
               Road frontage of the site by the provision of a street number.
         9.    Access to the site must be clearly signed with a sign of up to 1m2.




                       This is not an official copy of Council’s Minutes
                                                                                 Page 50 of 58

Section 51

ORDINARY MEETING MINUTES                                                 18 DECEMBER 2014


        Temporary Development Approval
        10.   This temporary development approval expires in two (2) years on 18 December
              2016. Upon request, Council may provide written consent to extend the
              approval on an annual basis having regard to the status of the adjacent mining
              lease, the degree of compliance with the approval conditions herein and the
              complaint history relating to the development.
        ENGINEERING
        General
        11.   The developer must meet any costs to repair damage to any Council or public
              asset during construction, where damage is a result of the development works.
              Damage to assets must be repaired immediately where it creates a hazard to
              the community. In circumstances where the damage does not create a hazard
              to the community, it must be repaired immediately on completion of the works
              associated with the development. A condition report including photographs of
              the frontage of the site should be completed and kept for future reference and
              made available to Council if required.
        Driveway and Internal Roads
        12.   Sealed crossovers must be provided for the two accesses to the site in
              compliance with the following:
              a.   IPWEAQ Standard Drawing SEQ R-056.
              b.   Designed and certified by a RPEQ
              c.   Have a minimum width of 4.0m at the property front boundary line.
        13.   Internal roads must:
              a.   Have a minimum width of 3.0m and widened where necessary to provide
                   passing opportunities for vehicles using the site.
              b.   Be all weather construction (sealed or compacted gravel) suitable for the
                   anticipated traffic and load of vehicles using the site.
              c.   Be provided with adequate stormwater drainage that prevents undue
                   erosion or surface deformation or settlement.
        Excavation and Filling
        14.   All earthworks shall be undertaken in accordance with the provisions of AS
              3798 “Guidelines on Earthworks for Commercial and Residential
              Developments”.
        Stormwater Drainage
        15.   Stormwater drainage works and water quality devices and measures must be
              provided and maintained in accordance with the approved engineering plans
              and in compliance with the Stormwater Quality Management Plan included in
              the Stormwater Drainage for No 154 Holts Rd Cooroy Report dated 26
              September 2014, Ref No: 1432 IWMP.doc, prepared by Callaghan & Toth.
              Particular attention must be given to the construction and maintenance regime
              of the two proposed Sediment Basins. The drainage works and basins must be
              certified by an RPEQ on completion.
        16.   Stormwater runoff from the development must be disposed of on-site without
              causing scour or damage to the subject site, the dam or any adjoining property.




                     This is not an official copy of Council’s Minutes
                                                                              Page 51 of 58

Section 52

ORDINARY MEETING MINUTES                                                   18 DECEMBER 2014


        Erosion and Sediment Control
        17.   The developer must ensure non-essential, short or long term, exposure of soil
              is prevented by minimising the duration of soil exposure to adverse weather
              conditions and effectively turf or stabilise any exposed area without delay and
              prior to rainfall occurring.
        18.   The developer must ensure sediment does not leave the site or enter onto
              adjoining properties or the dam on the site due to surface runoff on tyres of
              vehicles and/or machinery. The developer must implement appropriate
              approved erosion and sediment control measures throughout the site during all
              phases of construction and the ongoing operation of the site.
        19.   Prior to the completion of the development, all site surfaces must be effectively
              stabilised using methods which have achieved effective short-term stabilisation
              and which will continue to achieve effective stabilisation in the medium to long-
              term. For the purpose of this condition, an effectively stabilised surface is
              defined as one that does not, or is not likely to result in visible evidence of soil
              loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead to
              water contamination.
        20.   The supervising engineer and applicant are responsible to ensure that the
              implemented, short and long term, erosion controls measures are effective and
              regularly maintained to cater for all weather conditions.
        After Completion of Works
        21.   Prior to the commencement of use and the engineering certification of the
              works by the supervising engineer (RPEQ), a combined inspection of the
              completed works by Council’s Inspector/s and the supervising engineer is
              required. Please contact Council on 5329 6244 to arrange the inspection.
        Waste
        22.   The developer must provide adequate waste storage and disposal facilities.
        23.   Refuse bins must not be placed on the existing road formation of Holts Road. A
              suitably sized all-weather pad shall be constructed adjacent the driveway
              entrances to provide for waste bin collection.
        ADVISORY NOTES
        Engineering Certification
        1.    Council has undertaken an audit check of the submitted plans in relation to the
              proposed works. A detailed check of the calculations and drawings has not
              been undertaken, as they have been certified by a RPEQ. The RPEQ bears full
              responsibility for all aspects of the engineering design. Council reserves the
              right to require further amendments and/or additions at a later date should
              design errors become apparent.
        General Environmental Advisory Note
        2.    The Environmental Protection Act 1994 states that a person must not carry out
              any activity that causes, or is likely to cause, environmental harm unless the
              person takes all reasonable and practicable measures to prevent or minimise
              the harm. Environmental harm includes environmental nuisance. In this regard
              persons and entities, involved in the civil, earthworks, construction and
              landscaping phases of this development are to adhere to their ‘general
              environmental duty’ to minimise the risk of causing environmental harm.



                      This is not an official copy of Council’s Minutes
                                                                                  Page 52 of 58

Section 53

ORDINARY MEETING MINUTES                                                     18 DECEMBER 2014


         Aboriginal Cultural Heritage Act 2003
         3.    There may be a requirement to establish a Cultural Heritage Management Plan
               and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003.

               The ACH Act establishes a cultural heritage duty of care which provides that:
               “A person who carries out an activity must take all reasonable and practicable
               measures to ensure the activity does not harm Aboriginal cultural heritage.” It
               is an offence to fail to comply with the duty of care. Substantial monetary
               penalties may apply to individuals or corporations breaching this duty of care.
               Injunctions may also be issued by the Land and Resources Tribunal, and the
               Minister administering the Act can also issue stop orders for an activity that is
               harming or is likely to harm Aboriginal cultural heritage or the cultural heritage
               value of Aboriginal cultural heritage.
               You should contact the Cultural Heritage Co-ordination Unit on 07 3239 3647 to
               discuss any obligations under the ACH Act.
    B.   Find the following are sufficient grounds to justify the decision despite the conflict with
         the planning scheme:
         1.    The development will help to address a significant need for low-cost
               accommodation for self-contained RV travellers in the Noosa area.
         2.    The development will provide economic and community benefit through
               increased visitation to the Noosa hinterland.
         3.    The development provides for the adaptive re-use of the existing nursery on the
               site.
         4.    The site’s location near the Bruce Highway is appropriate to cater for self-
               contained RV traveller’s needs.
         5.    The development will not have significant adverse impacts on residential
               amenity or water supply quality.



4   DEVELOPMENT APPLICATION 132005.220.04 - REQUEST FOR A PERMISSIBLE
    CHANGE TO AN EXISTING APPROVAL FOR 22 VILLAGE INDUSTRY LOTS AT 70
    CARPENTERS ROAD, COOROY
    That Council note the report by the Infrastructure Assessment Officer to the General
    Committee Meeting dated 15 December 2014 regarding Application No. 132005.220.04 for
    a Permissible Change to the existing approval situated at 70 Carpenters Road, Cooroy and
    approve the request with the following changes:
    In relation to the request to make a change to the existing approval, Council decided to:

    A.   Change Condition 114 to read:
         Contributions Towards Council Infrastructure
         114. Monetary contributions shall be paid to Council towards the cost of providing
               and/or upgrading various infrastructure at the rates applicable at the time of
               payment. An estimate only of the contribution amounts under the current
               Council policies and requirements is outlined in the table below:




                       This is not an official copy of Council’s Minutes
                                                                                    Page 53 of 58

Section 54

ORDINARY MEETING MINUTES                                                                18 DECEMBER 2014




                                                           Stage          1      Stage         2     Stage       3
                Contribution Required For:                 Amount                Amount              Amount
                                                           (Lots 6,7 & 8)        (Lots 10 to 26)     (Lots 9 & 27)
                PSP17 – Water Supply Headworks
                                                           $ 25,135              $ 191,289           $ 22,264
                Contributions
                PSP16 – Sewerage Headworks
                                                           $ 11,253              $ 85,641            $ 9,968
                Contributions
                PSP12 – Public Open Space
                                                           $ 8,630               $ 65,665            $ 7,643
                Contributions (Park)
                PSP20 – Pathway Trunk Network
                                                           $ 13,179              $ 100,281           $ 11,672
                Contributions
                Roadworks Contributions (including
                                                           $ 28,000              $ 213,506           $ 24,798
                public transport)
                TOTAL Contribution Amount =                $ 86,197              $ 656,382           $ 76,345

                These amounts are subject to variations in the Consumer Price Index, All Groups
                Brisbane from September 2014 until the date of payment.

               All contributions must be paid prior to Council endorsement of the plan of
               survey for the applicable stage.
    B.   Change Advisory Note 1 to read:
         1.    The applicant is advised that development contributions and infrastructure
               charges applicable to this development approval have been based on the
               following estimates for Uses Class/ Uses and applicable quantities in
               accordance with the approved plan:-
                Existing
                                         Approved Development
                Development
                                                          Quantity
                Use                      Use
                Class /     Quantity     Class        /   Stage 1                Stage 2             Stage 3
                Use                      Use              (Lots 6,7 & 8)         (Lots 10 to 26)     (Lots 9 & 27)
                            One          Industrial
                                                          3 x     Industrial     17 x Industrial     2 x Industrial
                Vacant      Vacant       Business
                                                          Lots                   Lots                Lots
                            Allotment    Type 2
                Water & Sewerage Headworks
                                                          5,069    m2      lot   38,578 m2 lot       4,490 m2 lot
                contributions based on the lot
                                                          area                   area                area
                areas per the approved plan =
                Open     Space,     Pathway    &
                Roadworks contributions based
                                                          2,028 m2 gfa           15,431 m2 gfa       1,796 m2 gfa
                on 40% site cover of the lots per
                the approved plan =
                Note: Lots 50, 100, 101 & 102 are not current developable lots and have not been
                subjected to infrastructure contributions/charges. Nil infrastructure contributions/charges
                discounts (credits) are available should future development occur on these lots.



5   FINANCIAL PERFORMANCE REPORT - NOVEMBER 2014
    That Council note the report by the Manager Financial Services to the General Committee
    Meeting dated 15 December 2014 providing the November monthly financial performance
    report.


                         This is not an official copy of Council’s Minutes
                                                                                                   Page 54 of 58

Section 55

ORDINARY MEETING MINUTES                                                  18 DECEMBER 2014


6   NOOSA WATERS LOCK & WEIR LEVY
    That Council note the report by the Chief Executive Officer to the General Committee
    Meeting dated 15 December 2014 providing background to the history of the Noosa Waters
    lock and weir levy and:
    A.   Note that the current levy that has accumulated from 2000/2001 to 30 June 2014 will
         be surplus to future requirements for the Noosa Waters lock and weir;
    B.   Note that section 96 of the Local Government Regulation has specific provisions in
         relation to how refunds of levy surpluses must be undertaken; and
    C.   Authorise the CEO to implement a refund of the Noosa Waters lock and weir levy
         surpluses for the period 2000/2001 to 30 June 2014 in accordance with the approach
         outlined in the report and based on legal advice from King and Co.




                      This is not an official copy of Council’s Minutes
                                                                               Page 55 of 58

Section 56

ORDINARY MEETING MINUTES                                                   18 DECEMBER 2014


6   ORDINARY MEETING REPORTS


1   RUFOUS STREET PRECINCT DEVELOPMENT PROJECT
    Motion

    Moved:           Cr Wilkie
    Seconded:        Cr Bolton
    That Council note the report by the Director Community Services to the Ordinary Meeting
    dated 18 December 2014 and agree to:
    A.   Establish a Rufous Street Project Control Group to oversee the development of Lot
         94 SP 137431; and
    B.   Allocate a budget of $100,000 for:
         1.     The safe removal of the buildings and asbestos contamination from the
                Peregian Bowls Club site; and
         2.     Concept design and consultation.

    Amendment

    Moved:           Cr Wellington
    Seconded:        Cr Jurisevic

    That the following words be added to item A “with the inclusion of an additional Councillor,
    namely Cr Pardon, on the Project Control Group”

                                                                                       Carried.

    Council Resolution
    That Council note the report by the Director Community Services to the Ordinary Meeting
    dated 18 December 2014 and agree to:
    A.   Establish a Rufous Street Project Control Group to oversee the development of Lot
         94 SP 137431 with the inclusion of an additional Councillor, namely Cr Pardon, on
         the Project Control Group; and
    B.   Allocate a budget of $100,000 for:
         1.     The safe removal of the buildings and asbestos contamination from the
                Peregian Bowls Club site; and
         2.     Concept design and consultation.
                                                                                       Carried.




                       This is not an official copy of Council’s Minutes
                                                                                 Page 56 of 58

Section 57

ORDINARY MEETING MINUTES                                                   18 DECEMBER 2014


2   NOOSA BIOSPHERE RESERVE - APPOINTMENT OF DIRECTORS AND AMENDMENT
    TO CONSTITUTION
    Council Resolution

    Moved:           Cr Abbot
    Seconded:        Cr Wilkie
    That Council note the report by the Executive Manager to the Ordinary Meeting dated 18
    December 2014 and:
    A.   Agree to the appointment of the following persons to the roles of First Director Noosa
         Biosphere Reserve Foundation Ltd for the terms specified:
         1.     Mayor Noel Playford as the Director appointed by Council in its capacity as the
                founding member;
         2.     Scott Williams and Raul Weychardt for a term of three years ending at the
                conclusion of the third AGM;
         3.     Timothy Smith, Rowland Hill and Peter Hunnam for a term of two years ending
                at the conclusion of the second AGM; and
         4.     Judith Castledine and Oleg Morozow for a one year term ending at the
                conclusion of the first AGM: and
    B.   Authorise the Chief Executive Officer to progress an amendment to the Constitution
         of Noosa Biosphere Reserve Foundation Ltd. to give effect to the Council appointed
         Director always being an elected Councillor appointed by Council at Council’s
         discretion and the other proposed changes identified in the report.
                                                                                      Carried.



7   PETITIONS

    1    PETITION: REQUEST TO COUNCIL TO APPROVE THE PLACEMENT OF SPEED
         LIMIT SIGNS ON BLANCKENSEE ROAD, COOROY

         Council Resolution

         Moved:            Cr Bolton
         Seconded:         Cr Jurisevic

         That the petition tabled by Cr Bolton requesting Council to approve the placement of
         speed limit signs on Blanckensee Road, Cooroy be received and referred to the Chief
         Executive Officer to determine appropriate action.
                                                                                     Carried.




                       This is not an official copy of Council’s Minutes
                                                                                Page 57 of 58

Section 58

ORDINARY MEETING MINUTES                                                     18 DECEMBER 2014


8    CLOSED SESSION


1    PLANNING & ENVIRONMENT
     COURT APPEAL 1648 OF 2014 – NOOSA ON WEYBA DEVELOPMENT APPLICATION
     FOR PRELIMINARY APPROVAL FOR A MIXED USE COMMUNITY TITLE
     DEVELOPMENT
     Council Resolution

     Moved:           Cr Wellington
     Seconded:        Cr Pardon
     That Council note the report by the Coordinator Planning to the Ordinary Meeting dated 18
     December 2014 regarding Planning & Environment Court Appeal 1648 of 2014 (Northbrook
     Corporation Pty Ltd) for the Noosa on Weyba development application and:
     A.   Resolve that, while it is a matter for the Court to decide, it is the view of Council that
          the proposed change to the development application does not constitute a minor
          change pursuant to S350 of the Sustainable Planning Act.
     B.   Find that the proposed change would be likely to attract additional submitters were
          the changed application to be publicly notified.
     C.   Instruct Council’s solicitor for Planning & Environment Court Appeal 1648 of 2014 to
          advise the appellant of Council’s decision.

                                                                                           Carried.




9    NEXT MEETING

     The next Ordinary Meeting will be held on 15 January 2015 in the Council Chambers,
     9 Pelican Street, Tewantin commencing at 6pm.




10   MEETING CLOSURE

     The meeting closed at 6.15pm.




                        This is not an official copy of Council’s Minutes
                                                                                    Page 58 of 58

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.