Original source · versioned page text
2014-12-18 Ordinary Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING MINUTES 18 DECEMBER 2014
e. measurable and achievable criteria on which the performance of the floristic
and structural component of the re-vegetation strategy can be assessed
annually over three years, including no weeds at the end of the re-vegetation
period
f. provision of 1 street tree with a minimum pot size of 100 litres planted within the
road reserve for every 8 metres of road frontage including around the cul de
sac
g. control of all weeds species listed in the following standards and legislation:
i. declared plants under the Land Protection (Pest and Stock Route
Management) Act 2002 and sub-ordinate Regulation 2003
ii. Council Listed Environmental Weeds, Exotic Grasses and other plants
identified in writing by Council (*refer to Advisory Note)
13. All rehabilitation of the eastern tributary (waterway) including the construction of the
footbridge must be completed prior to Council endorsement of the Plan of Survey.
ENGINEERING
External Works
14. A new intersection must be constructed joining Cordwood Drive with the new road
(Masonry Street). The works must be undertaken in accordance with an Operational
Works approval, and must include in particular:
a. vehicle priority maintained to Cordwood Drive
b. provision of sight distances adequate for the design speed of the road
c. installation of street lighting
All works to be dedicated are “non-trunk infrastructure” for the purposes of the
Sustainable Planning Act 2009.
New Roads
15. The new road (Masonry Street) shown on the Approved Plans must be constructed in
accordance with the conditions of this Decision Notice and dedicated as road reserve
at no cost to Council.
The road to be dedicated is “non-trunk infrastructure” for the purposes of the
Sustainable Planning Act 2009.
16. The new road (Masonry Street) as shown on the Approved Plans must be
constructed. The works must be undertaken in accordance with an Operational
Works approval and must include in particular:
a. a reserve width of 15 metres minimum widened where applicable to encompass
the cul-de-sac and the necessary verge areas
b. sealing, kerbing and channelling
c. an “Access Road” in accordance with Council’s Planning Scheme Policy 5 –
Engineering Design Standards - Road, Drainage and Earthworks
d. construction of pedestrian footpaths in accordance with the conditions of this
Decision Notice
e. installation of street lighting
f. modifications to existing services.
g. A cul-de-sac in accordance with Council’s Planning Scheme Policy 5 –
Engineering Design Standards - Road, Drainage and Earthworks
All works to be dedicated is “non-trunk infrastructure” for the purposes of the
Sustainable Planning Act 2009.
This is not an official copy of Council’s Minutes
Page 16 of 58
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.