ORDINARY MEETING MINUTES 18 DECEMBER 2014
Stormwater Drainage
23. The site must be provided with a stormwater drainage system connecting to a
lawful point of discharge. The works must be undertaken in accordance with an
Operational Works approval and the Queensland Urban Drainage Manual, and
must include in particular:
a. the works generally as shown on drawing number 1225-33 revision A and
dated 06/14 prepared by Callaghan and Toth;
b. provision of kerb adapters for all new lots; and
c. extension of the site stormwater system to accommodate stormwater
from external to the site, including registration of drainage easements.
This condition is imposed pursuant to s665 of the Sustainable Planning Act
2009 being non-trunk infrastructure.
24. All elements of the stormwater drainage system, including any necessary scour
protection, must be wholly contained within the subject site, existing and/or new
road reserves.
Easements
25. Unless otherwise agreed in writing by the relevant service provider, any public
or third party infrastructure located on the subject site must be placed within an
easement registered against the title of the property.
26. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the
Grantee’s standard easement terms. Draft easement documentation must be
submitted to Council for endorsement.
27. All works must be kept clear of any existing or proposed easements on the
subject land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
28. All fill and associated batters must be contained entirely within the subject site
unless written permission from the respective landowner(s) is provided to
Council.
29. All earthworks must be undertaken in accordance with the provisions of
Australian Standard AS3798: Guidelines on Earthworks for Commercial and
Residential Developments.
30. Where the development involves excavation or filling over, or adjacent to,
drainage, water supply or sewerage infrastructure, all access chamber surface
levels must be adjusted to provide a freeboard of 100mm above the finished
ground surface level.
31. All retaining walls must be designed and constructed in accordance with the
planning scheme and must be certified by an RPEQ where exceeding 1.0m in
height. All retaining walls that are publicly accessible and exceed 1.0m in
height must be fitted with a commercial grade safety fence.
Electricity and Telecommunication Services
32. Underground reticulated electricity and telecommunication services must be
provided to each lot in accordance with an approval for Operational Works and
the standards and requirements of the relevant service provider.
This is not an official copy of Council’s Minutes
Page 33 of 58