Minor Change Existing Approval - MCU23 0109.01, OPW23 0123.01 & RAL23 0017.01 (As Published)
3. CURRENCY PERIOD OF APPROVAL
The currency period for this development approval is stated in the conditions below.
4. ASSESSMENT MANAGER CONDITIONS
MCU23/0109 - MATERIAL CHANGE OF USE - MULTIPLE DWELLING (10 SMALL
DWELLINGS)
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied with prior
to the use commencing, and then compliance maintained at all times while the use
continues.
Currency Period
2. This development approval lapses if the use has not happened by 14 May 2030, unless an
application to extend the currency period is approved by Council.
Approved Plans
3. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the tables below. The plans must be amended to incorporate
the amendments listed within the table below and resubmitted to Council prior to the issue
of any Development Permit for Building Works*
Plan No. Rev. Plan/Document Name Date
202304 DA.08 A Upper Floor prepared by Black Wood 03.08.2023
202304 DA.09 A Roof Plan prepared by Black Wood 03.08.2023
202304 DA.10 A Site Elevations & Sections prepared by Black 03.08.2023
Wood
202304 DA.12 A Building 1/2 – Roof & Elevations prepared by 03.08.2023
Black Wood
202304 DA.13 A Building 1/2 – Sections prepared by Black Wood 03.08.2023
202304 DA.15 A Building 3/4 – Roof & Elevations prepared by 03.08.2023
Black Wood
202304 DA.16 A Building 3/4 – Elevations & Sections prepared by 03.08.2023
Black Wood
Page 2 of 21
Document Set ID: 24258311
Version: 5, Version Date: 30/10/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original