Appendices B-D
Attached to the e-mail MCU15/0023 Development application (Email 2 of 2).
Original PDF page 68, section 1. The text section number identifies this passage in the reader.
Natural Hazards Overlay Code
____________________________________________________________________________________________________________________
ACCEPTABLE
SOLUTION ALTERNATIVE SOLUTIONS / COUNCIL USE
SPECIFIC OUTCOMES PROBABLE SOLUTIONS
COMPLIANCE COMMENTS ONLY
(/)
ARI) flood event. identified on Overlay Maps OM1.3—
OM9.3;
or
S14.2
At least one access route above the 1%
AEP (1:100 year ARI) flood level is
available for evacuation;
or
S14.3
An area of sufficient size and dimensions
to accommodate users is provided, above
the 1% AEP (1:100 year ARI) flood level
that allows for safe congregation and
evacuation;
AND
S14.4
Works avoid any reductions in on-site
flood storage capacity and contain within
the site any adverse changes, including
changes to the depth, duration or velocity
of flood waters up to and including a 1%
AEP (1:100 year ARI) flood event.
Noosa Plan - Code Compliance
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.