Original source · versioned page text
1506-15
Attached to the e-mail OPW15/0139 Application for bulk earthworks - 429 Kennedys Rd Pomona.
Civil, Environmental & Hydraulic Engineers [OCR of page images] Callaghan & Toth ) + i Civil, Environmental & F Hydraulic Engineers ~ PO BOX 2305 NOOSA HEADS 4567 dd i! 8/41 Sunshine Beach Road =| Phone 54749081, Fax 54749041 if www.callaghanandtoth.com.au designed [ADT | datum AHD DERIVED , drawn BM - PSM * , checked | AH Origin (B.M.) RL * D EXISTING DAM TO TRAP SEDIMENT approved si SURVEYED BY MAX WATTERSON PHONE 54426121 _——— project AQUACULTURE PONDS 429 KENNEDYS ROAD, POMONA p Bb TEMPORARY EARTH BUND TO DIRECT UPPER DAM SEDIMENT TO LOWER DAMS i = 2 = x ld ($$ <~r Client D KNOWLES TS) ————————————————— title SEDIMENT & EROSION CONTROL PLAN 3 DS _———— LOT 7 on MCH793 Parish of TUCHEKOI County of MARCH NOOSA SHIRE COUNCIL ; Locality of POMONA A RK) p aa. SCALE 0. 9 10 20 30 40n 1:1,000 SCALE BEFORE REDUCTION (A3) SCALE SHOWN IS ORIGINAL DRAWING SCALE DO NOT SCALE THIS DRAWING USE ONLY DIMENSIONS PROVIDED. CONSTRUCT LOWER DAM 16 FIRST REVISIONS TO TRAP SEDIMENT. TOPSOIL, MULCH Trai] Tevsion & SEED BATTERS PRIOR TO 7” [PRELIMINARY ISSUE STARTING DAM 15 SEDIMENT CONTROL LEGEND: FILES XAJOBS\CT PROJECTS IN PROGRESS\1506 fish farm pomona\Design\current drawing FOR APPROVAL Sheet 15 of 17 sheets drawing number 1506- 15 XK date MAY 2015 yy, ww_S_s ERECT SEDIMENT FENCE TO DETAIL of —_> DIRECTION OF SEDIMENT FLOW/FINISHED SURFACE FLOW, o TWO-THREE SAND BAGS TO FORM A VEE CHECK DAM AT 10m CENTRES ALONG NEW TABLE DRAIN WET SEDIMENT BASIN TO STD DWG SD 6-4 & SCRC MAROON MANUAL PROPOSED TEMPORARY SEDIMENT CONTROL BUND HHH DRAINAGE BUND —— <— __ DRAINAGE CHANNEL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.