SPL-0514-009997.1 - s271 Amended Concurrence agency response before application is made (with conditions) · OPW14/0239
Attached to the e-mail OPW14/0239 Amended DSDIP Concurrence Agency Response.
SPL-0514-009997/1 Queensland Govemment Department of State Development, Infrastructure and Planning Our reference: SPL-0514-009997/1 Your reference: 11363 Date: 16 September 2014 Pisces Noosa Units C/- Superior Jetties PO Box 920 NERANG QLD 4211 Dear Sir/Madam, Amended Concurrence agency response before application is made—with conditions 7 Peza Court, Noosa Heads Qld 4567 (Related to section 271 and given under section 285 of the Sustainable Planning Act 2009) Reference is made to your correspondence dated 7 May 2014 requesting the Department of State Development, Infrastructure and Planning provide an amended referral agency response for the proposed development before the development application is made to the assessment manager. A response was issued by the department on the 26 May 2014. On 11 September 2014 the applicant requested an amended referral agency response from the department under s290(1)(b){ii) of the Sustainable Planning Act 2009. Applicant details Applicant name: Pisces Noosa Units C/- Superior Jetties Applicant contact details: PO Box 920 Nerang, QLD, 4211 Site details Street address: 7 Peza Court, Noosa Heads Qld 4567 Real property description: 0 BUP4114 Local government area: Noosa Shire Council Department of State Development, Infrastructure and Planning Page 1 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 7 pages
Page 2
SPL-0514-009997/1 Application details Proposed development: Development Permit for Operational Works — Prescribed Tidal Works (Pontoon and walkway) Aspects of development and type of approval being sought Development type: Operational work Approval type: Development permit Referral triggers The development application would be referred to the department under the following provisions of the Sustainable Planning Regulation 2009: Referral trigger: Schedule 7, Table 2, Item 15 — Maritime Safety matters Documents supplied to support request Plan title Author Reference no. Date Revision Site plan, elevation & | Superior Jetties | 11363-—D01 28/08/2014 A general notes Conditions Under section 287(1)(a) of the Sustainable Planning Act 2009, the department requires that the conditions set out in Attachment 1 attach to any development approval. Reasons for decision to impose conditions Under section 289(1) of the Sustainable Planning Act 2009, the department is required to set out the reasons for the decision to impose conditions. These reasons are set out in Attachment 2. Further advice Under section 287(6) of the Sustainable Planning Act 2009, the department offers advice about the application to the assessment manager—see Attachment 3. Pursuant to section 272(3) of the Sustainable Planning Act 2009, you will not be required to refer your application to the department if you submit this response in its entirety when making the application to the assessment manager, and the following conditions are satisfied: e Any changes to the proposal before the application is made to the assessment manger do not result in a substantially different development to that which was presented to the department with the request for a referral agency response e The development application must be made to the assessment manager within 12 months of the date of this referral agency response. If you require any further information, please contact Blake Petchell, Planning Officer, on 5352 9707 or via email [email protected] who will be pleased to assist. Department of State Development, Infrastructure and Planning Page 2 of 7
Page 3
SPL-0514-009997/1
Yours sincerely
anager, Planning
enc: Attachment 1—Conditions to be imposed
Attachment 2—Reasons for decision to impose conditions
Attachment 3—Further advice
Department of State Development, Infrastructure and Planning Page 3 of 7
Page 4
Our reference: Your reference: SPL-0514-009997/1 11363 Attachment 1—Conditions to be imposed SPL-0514-009997/1 No. Conditions Condition timing Development Permit for Operational Works — Prescribed Tidal Works (Pontoon and walkway) Schedule 7, Table 2, tem 15, Maritime Safety matters - Pursuant to section 255D of the Sustainable Planning Act 2009, the chief executive administering the Sustainable Planning Act 2009 nominates the Director-General of the Department of Transport and Main Roads (Maritime Safety Queensland) to be the assessing authority for the development to which this development approval relates for the administration and enforcement of any matter relating to the following conditions: 1. The applicant must supply the Regional Harbour Master with completed “As Constructed” drawings. The required information is to be forwarded to: Regional Harbour Master Maritime Safety Queensland Macarthur Avenue East Pinkenba, Qld , 4008 Within two weeks of the completion of the works. 2. Development must be carried out generally in accordance Upon the with the following plans, except as modified by these completion of concurrence agency conditions: works and to be e Title: Site plan, elevation & general notes, Author: maintained at all Superior Jetties, Plan: 11363 - D01, Date: times 28/08/2014, Revision A. 3. Any ship, dry berth or device (including Air Lifting Pontoons) | At all times berthed, moored or attached to the pontoon/structure must not exceed the following sizes: e Wet berth - length overall: 8.0m; beam: 2.6m « Maximum Vessel Mass — 3,000 Kg 4. No part of any structure or any ship berthed at the approved | At all times structure is to encroach within 1.5metres from the side boundaries of the allocated water space as shown on the water allocation plan NQ - 01. 5. The applicant must notify the Regional Harbour Master in Notification to be writing of the commencement and completion of the approved works. The required information is to be forwarded to: Regional Harbour Master Maritime Safety Queensland Macarthur Avenue East Pinkenba, Qld , 4008 given at least two weeks prior to the commencement of the works and within two weeks after the completion of the Department of State Development, Infrastructure and Planning Page 4
Page 5
SPL-0514-009997/1 No. Conditions Condition timing works. The structure must be adequately lit and all lighting must be positioned so that it does not cause a risk to the safe navigation of other ships. Any freestanding piles must have retro-reflective tape fitted. Lighting must be provided in accordance with Maritime Safety Queensland’s requirements and section 3 of AS 4282-1997 ‘Control of the obtrusive effects of outdoor lighting’. At all times The pontoon must be constructed totally within the approved quayline. At all times The construction, operation or maintenance of the structure must not impede the safe navigation of other ships or restrict safe access to or from neighbouring structures. At all times The applicant must dispose of any obstructions and debris encountered while undertaking the works. This work is to be undertaken at no expense to the Department of Transport and Main Roads and in accordance with any directions issued by the Regional Harbour Master. At all times during construction 10. Any ship moored at this pontoon/jetty must not impede the safe navigation of other ships or restrict access to or from neighbouring structures. At all times Department of State Development, Infrastructure and Planning Page 5
Page 6
SPL-0514-009997/1 Our reference: SPL-0514-009997/1 Your reference: 11363 Attachment 2—Reasons for decision to impose conditions The reasons for this decision are: e The Department of Transport and Main Roads through Maritime Safety Queensland has the responsibility to ensure that any ship, dry berth or device (including Air Lifting Pontoons) berthed, moored or attached to the pontoon/structure do not impede navigational safety e The Department of Transport and Main Roads through Maritime Safety Queensland is responsible for ensuring that the construction, operation or maintenance of the approved structure will not adversely impact on navigational safety. e If the pontoon is implemented as proposed and in accordance with these conditions, it will not impede navigational safety. Findings on material questions of fact e The proposed pontoon does not extend beyond the established quayline or neighbouring structures. « Asship up to the maximum size specified can be berthed at this pontoon without impeding navigational safety. e Obstruction and debris uncovered or otherwise encountered during the construction of the approved structure has the potential to interfere with navigational safety. e Maritime Safety Queensland needs to maintain the as constructed details of all structures located within navigable waterways. Evidence or other material on which the findings were based e Plan prepared by Superior Jetties, o Title: Site plan, elevation & general notes o Reference No: 11363-D01 o Dated 28/08/14 o RevisionA e Transport Operations (Marine Safety) Act 1994 e State Development Assessment Provisions published by the Department of State Development, Infrastructure and Planning e Sustainable Planning Act 2009 e Sustainable Planning Regulation 2009 Department of State Development, Infrastructure and Planning Page 6
Page 7
SPL-0514-009997/1 Our reference: SPL-0514-009997/1 Your reference: 11363 Attachment 3—Further advice General advice 4. | TOMSA AND TOMPA The Harbour Master directs any ships and equipment you or agent use must comply with the Transport Operations (Marine Safety) Act 1994, the Transport Operations (Marine Safety) Regulation 2004 and the Transport Operations (Marine Pollution) Act 1995 Department of State Development, Infrastructure and Planning Page 7
Page 8
12696 5000
WET BERTHED VESSEL
MAXIMUM VESSEL LENGTH - 8.0m |
MAXIMUM VESSEL BEAM - 2.6m QUAYLINE _
MAXIMUM VESSEL MASS - 3000 Kg
3000
EXISTING MOORING
J STRUCTURE !
wo
1.0.
1.
GENERAL NOTES
The works that are the subject of these plans are structurally adequate for anticipated usage as
detailed and certified on these plans.
1.2. All structures depicted have been designed to comply with relevant regulations as set by the local authority,
Queensland Transport and the Prescribed Tidal Work Code [Schedule 4A of the Coastal Protection &
Management Regulation 2003)
All structures depicted herein have been designed in accordance with Australian Standards AS1170.1
(structural design actions) AS1170.2 (wind loads) AS1664.1 (Alum structures) AS1720.1 (timber structures)
AS2159 (piling) AS3600 (concrete structures) AS3962 (design of marinas) AS4100 (steel structures). Relevant
local covenants, where applicable, have been considered in the design.
1.4. Anchorage piles where applicable have been designed assuming independence from any adjacent revetment
structures.
4.5. Max water level used in the design of any piles shown in the structure is RL +2.05 AHD under normal in-service
conditions. The piles have not been designed for Q100 flood conditions in excess of RL +2.05 AHD nor scour of
the soil around the base of the piles.
1.6. Where applicable, the existing revetment wall appears (to the best extent that could be reasonably determined
via non-destructive inspection) to be adequate for typical service loads (such as live, dead and impact) that may
be imposed by the proposed gangway/abutment connection.
1.7. The following design parameters form the basis for the design of the structure/s depicted herein -
13.
24.63m 331° 29° Tener Deck
Edge Pool Coping
15400
CP
\ -sorose Sm x 3m
5.889 337° by
Edge of Paving approx RL ial]
CONCRETE PONTOON
J EXISTING REVETMENT WALL
EXISTING MOORING
STRUCTURE
S
1a (Pontoon & Gangway) Single user piled Structure Design Live Load - 2.0 kPa L 0) qT 2 5 0 a
17b (Pontoon & Gangway) Multiple user piled Structure Design Live Load - 2.0 kPa N ON BUP4114
11 (Deck or Jetty) Single user piled Structure Design Live Load - 2.0 kPa wv
11d (Deck or Jetty) Multiple user piled Structure Design Live Load - 3.0 kPa ‘
1le Design Wave height - 0.5 m =
17f Design ultimate wind velocity - 41 m/s =
1.19 Max stream velocity (2% exceedance probability) <1.8/s maximum
1.7h Anchorage, Mooring, Boardwalk or Jetty (where applicable) to be installed in accordance with AS2159
to ensure the following minimum (working) design loads are achieved (Unless Noted Otherwise) : .
Bearng opacity 30 fonne SITE PLAN (1: 250)
Lateral Capacity - 5.0 tonne
2.0. STEEL
2.1. All steelwork to comply with AS4100. All welds to be 6mm continuous fillet welds U.N.O. 12000
2.2. All steel exposed to be hot dipped galvanized with coating mass not less than 600g/sq.m.
2.3. Stainless steel restraint cables to be min 8mm diam, Grade 316 and in accordance with AS 2837 where
3000 9000
applicable.
3.0. CONCRETE
3.1. All concrete work to comply with AS3600.
3.2. Pontoon concrete strength to be SOMPa with 80mm slump U.N.O
3.3. Pile concrete 40 MPa & Abutment Block concrete 32 MPa.
3.4. Minimum cover to the reinforcement - 40mm U.N.O.
TOP OF PILE | RL: +3.40m AHD —
4.0, ALUMINIUM
4.1, All aluminium to comply with AS1664 and to be (minimum) Grade 6063 TS U.N.O.
4.2. Butt welds, where specified, to have full penetration.
4.3. Surfaces between aluminium and concrete separated by bituminous membrane.
SAND DREDGING TO BE DONE BY PROPERTY OWNERS
5.0. FLOATATION HAT | RL: +1.16m AHD —
9.70m x 1.32m ALUMINIUM
HINGED GANGWAY
EXISTING REVETMENT WALL
5.1. Design stability load applied across half the width of the floating pontoon and on the entire gangway will
produce a maximum tilt not exceeding 15 degrees and will not cause any corner to emerge from the water. The MHW.S. | RL: +0.66m AHO
minimum freeboard under such loading will not be less than 75mm at any point on the pontoon.
5.2. Polystyrene SL grade foam to be encased in high density polyethylene membrane fully welded at the corners RL: 0.00m AHD ——
and joins to form a complete seal impervious to marine organisms known to attach to such structures under
t | conditi
Yplra connniens M.L.W.S. | RL: -0.74m AHD =
6.0. TIMBER LAT. | RL: -1.12m AHD — \
6.1. All timber work to comply with AS 1720.1 to be minimum F17 hardwood. “15 e-7
6.2. All bolted timber connections, where specified, to be galvanized (or stainless steel equivalent). -2.0 gee ™
"~“CURRENT SURVEYED
a
7.0. FIXINGS & FINISHINGS CANAL PROFILE
5 2.5 7
7.1. All fixings to be 316 Grade Stainless Steel U.N.O. ca
ORIGINAL DESIGN CANAL PROFILE
IT IS THE OWNERS RESPONSIBILITY TO ENSURE THAT ANY
VESSEL BERTHED DOES NOT EXCEED THESE MAXIMUMS
THE EXISTING REVETMENT WALL APPEARS (TO THE BEST EXTENT THAT COULD BE REASONABLY
DETERMINED VIA NON-DESTRUCTIVE INSPECTION) TO BE ADEQUATE FOR TYPICAL SERVICE LOADS
3.5m MINIMUM
i
EMBEDMENT \
3a 4
CONCRETE ABUTMENT
SAND RELOCATION TO BE DONE BY PROPERTY OWNERS
|+__— 350 x 150 kNm SPUN
CONCRETE PILES
Lt
DO NOT SCALE DRAWINGS. (SUCH AS LIVE, DEAD AND IMPACT) THAT MAY BE IMPOSED BY THE PROPOSED GANGWAY / ABUTMENT CONNECTION.
ELEVATION (1: 100)
‘Alea | samen | ee |e 28/04/14 meme SRE EREVAN Gateat NOTES nck
28/08/14 | PONTOON LENGTH REDUCED TO 5.0m 0G TRADING AS ® ORG, TITLE ,
SUP NOS es (3) SUPERIOR ot MARK WICHLINSKI
DRAWING NO: io PISCES APARTMENTS CONSULTING ENG. \
ADDRESS ~~
ATLAS MARA ATEMATIONAL PTY, TD Mail Address: P.O. Box 920 Nerang 4211 11363-D01 7 PEZA CT Z 0\ | ‘ rm
PEPROBULED STORED A RETREVABLE SYSTEM REVISION NO NOOSA HEADS, QLD 4267 y NUBMA,
IN ANY FORM, OR TRANSMITTED BY ANY MEANS Ph: — (07) 5594 8200 *
WITHOUT PRIOR WRITTEN PERMISSION OF Fax: (07) 5594 8222 DRAWN BY DESIGNED CHECKED BY PAPER SIZE ‘SCALE
ATLAS MARINE INTERNATIONAL PTY, LTD. Email: info@superior jetties.com a J) aw MW. A3 1: 100 RPEQ: 1643
Used in these records
SPL-0514-009997.1 - s271 Amended Concurrence agency response before application is made (with conditions).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.