2017-01-16 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 16 JANUARY 2017
44. All underground pipework must be made of approved, non-corrodible materials
which include either:
a. fibre-reinforced thermosetting resin composite (fibreglass) compatible with
the product to be transferred; or
b. flexible plastic meeting the requirements of UL971 Standard for non-
metallic underground piping for flammable liquids.
45. All product piping must have secondary containment consisting of double-walled
piping with an interstitial space.
46. A Certificate of Compliance must be provided by the manufacturer certifying that
the pipework meets the Standard and be provided to Council prior to the
commissioning the UPSS.
Fill/Vapour Recovery Points
47. Each tank fill point must be:
a. clearly labelled and identified in compliance with AS 4977-2008 Petroleum
products - Pipeline, road tanker compartment and underground tank
identification
b. fitted with a camlock type or other liquid-tight connection
c. provided with spill containment of at least 15L capacity per spill point.
48. All fill and vapour recovery points must be earthed in compliance with AS 1020-
1984 The control of undesirable static electricity and AS 3000-2007 Electrical
installations.
Monitoring
49. Monitoring of the interstitial space of the double walled tanks or product piping
must be capable of detecting a release through either wall of the tank or product
piping. A 6-monthly inspection program conducted by a suitably qualified and
experienced person is required to monitor the following:
a. the system is active;
b. leak detection measurements (e.g. liquid levels or pressure levels) are
within manufacturer’s tolerances;
c. leak detection measurements are recorded;
d. any loses outside the manufacturer’s leak detection tolerances are to be
reported to council in writing and the tank owner immediately.
Fuel Dispensing Area (FDA)
50. The FDA must be covered and designed and constructed to ensure that no
vehicle may be refuelled outside the delineated area.
51. The FDA must be designed and constructed so as to prevent the entry of
watershed from overland stormwater flows entering the fuel dispensing forecourt.
52. All ground surfaces within the FDA must be constructed of impermeable
materials free of gaps and/or cracks. Suitable materials include waterproofed,
reinforced concrete or an approved equivalent.
Page 21 of 52
See the original
The page text is free to read. Viewing or downloading an original file needs an account.