Original source · versioned page text
2017-01-16 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 16 JANUARY 2017
f. be engineered to ventilate any likely hazchem vapour and make a safe
working environment in accordance with the Model Development Code for
Hazardous Industries and Chemicals - Workplace Health and Safety
Queensland.
Equipment Integrity Test (EIT) of UPSS
66. An EIT of the UPSS is to be conducted by a duly qualified person in accordance
with the manufacturer’s written instructions specific to the UPSS.
67. The EIT must be capable of detecting a leak of 0.38 litres per hour, with a
probability of detection of at least 95% and of false detection of 5% or less in
accordance with AS 4897–2008 – The design, installation and operation of
underground petroleum storage systems.
68. The EIT must be a nationally approved and certified method of testing that meets,
at a minimum, the requirements or certification standards of the United States
Environmental Protection Agency (USEPA 1990).
69. The EIT of the UPSS must be undertaken at the following times :
a. immediately before commissioning the new UPSS
b. immediately following any modification to the UPSS
c. immediately following installation of re-used equipment
d. immediately following any equipment retrofit
e. immediately following any repair to UPSS equipment
f. where the leak detection systems indicate failure
g. where there is only one method of leak detection system in use
h. where there is evidence of a leak
i. when requested by Council
70. The results of any EIT must be provided to Council upon commissioning the
UPSS and as requested by Council and must provide as a minimum the following
information:
a. equipment identification number
b. location and date of test
c. results of test and test method
d. certification by and details of testing company or individual
e. discussion, conclusion and any remedial actions proposed, implemented
and timetable for compliance.
Stage 1 Vapour Recovery
71. Each underground storage tank is to have:
a. vapour return lines that return all vapour displaced from the storage tank to
the delivery tanker;
b. vapour-tight couplings on the vapour line that close automatically when
disconnected;
c. liquid-tight couplings on the liquid transfer hoses;
Page 40 of 52
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.