2017-01-16 General Committee Meeting Notes

of 52

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING                                                   16 JANUARY 2017


        78.   Certification must be provided to Council confirming the UPSS de-commissioning
              was conducted by a suitably qualified and experienced person, and that removal,
              transportation and disposal was in accordance with the Standards and
              legislation.
        79.   At the time of abandonment of any UPSS the site must be investigated for
              contamination. An assessment report must be prepared by a suitably qualified
              and experienced person (as required under the Environmental Protection Act
              1994) to verify the site has either met remediation criteria or is suitable for
              continued and future use. The assessment report must be submitted to Council
              no later than 60 days of either the:
              a.   decommissioning of an UPSS if no soil or ground water remediation is
                   required
              b.   completion of any remediation associated with the decommissioning of an
                   UPSS if remediation is required.
        80.   All records associated with the decommissioning of UPSS must be maintained
              for a period of 7 years after removal of the UPSS. These records must be
              provided to future owners/operators of the service station and property, as part
              of ensuring all practicable measures have been implemented to prevent site
              contamination.
              Noise
        81.   Mechanical plant and equipment, a/c units, motors, refrigeration equipment,
              compressors, pumps etc. on site must be located within the building or suitably
              provided with noise reduction measures and located to prevent a noise nuisance
              beyond the boundary of the site and to not exceed the levels specified in Table
              1.
              Table 1

               NOISE LIMITS AT A SENSITIVE RECEPTOR

               PERIOD                 Noise level at noise sensitive place measured as the
                                      adjusted maximum sound pressure level (Lamax, adj,T)

               7am – 6pm              Background noise level (LAbg,T) plus 5 dB(A)

               6pm – 10pm             Background noise level plus 5 dB(A)

               10pm – 7am             Inaudible

               NOISE LEVELS AT COMMERCIAL PLACE

               PERIOD                 Noise level at a commercial place measured as the
                                      adjusted maximum sound pressure level (Lamax, adj,T)

               7am – 6pm              Background noise level (LAbg,T) plus 10 dB(A)

               6pm – 10pm             Background noise level plus10 dB(A)

               10pm – 7am             Background noise level plus 8 dB(A)




                                                                                 Page 42 of 52
Log in to download the original file

2017-01-16 General Committee Meeting Notes(PDF, 939KB).pdf · 961 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.