Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

MCU14/0053 - Proposal Report

of 33

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

 

200Bigen

 

   
 
 

    
   

des IPRS ETE we

The relevant period for this Development Approval is ideniified in the Assessment Manager

 
   

Development undertaken in accord generally comply with the
approved plans of development. The approved plans are listed in the following table and as may

be amended by these conditions.
Biiegi Teac wien Boemmenit Naas oe oe

  
    

 

» Document Yio. ~

 

effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
3. Any advertising sign or device is to comply with Council's policies on advertising.
approved for the use.
5. Any new hot water systems insialied shall be either solar sysiams; electric heat pump systems;
of gas systems (LPG or nstural).
ith fh S2A SErvatkn

Rating System as defined by the AS/NZS 6400 (Water Efficient Products - Rating and Labeling
2003) and AS/NZS 3500 (National Plumbing and Drainage Standard Part 1.2}, with toilets to
comply with the AAAA Water Conservation Rating System. All tap ware and shower roses shall
not excaed a maximum flow of 9 litres per min. Dishwashers and washing machines ere
oo 1 econ from thia requirement
7. The Development Pernst for a materia) change of use of premises lapses if the use has not
happened by 20 August 2012, unless an application to extend the currency is approved by
Council.

rr TONS Foro dS Gourrcil inircetrctuive.

8 ‘Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or
upgrading various infrastructure at the rates applicable at ihe time of payment An estimate only
of the contribution amounts under the current Council policies and requirements is oullined in

 
   

 
 

   
   

   

 

 

 

 

 

 

 

 

 

 

 

 

the table below:
Cont = Required Fon — — 5
PSP12— Public Open Space Contributions {Park} $154
| PS P46 — Sewermpe Headworks Contributions 30
PSP17 — Water Supply Headworks Contributions 90
PSP20 - Pathway Trunk Network Contributions $185
TOFAL Contribution Amount = $369
Please note, that these amounts are all subject to variations in the Consumer Price index, Alt
Groups Brisbane from March 2008 until the date of payment.

 

2087
Log in to download the original file

MCU14_0053 - Proposal Report.pdf · 901 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.