SUPERSEDED Decision Notice - 010.2007.00001457.001 [As Published] · 132007.1457

of 13

Text shows just the words. Original shows the document exactly as it was published.

NOOSA COUNCIL IDAS Development Application Decision Notice                                                4 of 13


13.   The driveway shall be designed and constructed to Council’s design standards and to grades that prevent
      vehicles from scraping and/or bottoming whilst also allowing pedestrians movements along the footpath
      without any step or level difference. Should any driveways be constructed to grades that do not comply
      with AS/NZS 2890.1-2004, Council will require that the driveway be removed and reconstructed to levels
      that do comply.
      Please note, a step between the driveway and the footpath shall be avoided, as it is preferred to have the
      footpath continue at a constant grade to minimise the potential for pedestrians to trip or fall.
14.   To ensure pedestrian safety between vehicles exiting the site and pedestrians on the footpath, the
      driveway and any associated fencing or vegetation near the driveway shall comply with the minimum sight
      line requirements as defined in AS2890.1, section 3.2.4. The applicant shall demonstrate compliance by
      illustrating these sight lines on the plans submitted for Building Works approval.

15.   A Road/Footpath Permit shall be completed and submitted for the construction of the access driveway in
      accordance with Council’s Local Law No.8. If approval is given the driveway shall be constructed in
      accordance with Council’s standard drawings, which will be provided at time of approval.

16.   All vehicles shall enter and leave the site in a forward direction.
Car Parking
17.   Carparking shall be provided within the site generally as shown on the plan titled Lot Plan Change for 20
      Orealla Crescent as amended and dated 30/3/07 as submitted by Christopher Moore.

18.   A minimum of 1 uncovered carpark spaces and 2 covered carpark spaces shall be provided on site.

19.   One open visitor carpark space shall be provided between the building and the front property boundary of
      the site in a highly visible location, which shall not be restricted by gates, security screens or other
      obstacles. The visitor carspace shall be clearly sign posted to ensure the space remains available for
      visitor carparking.

20.   The carparking area shall be designed to comply with the provisions of AS/NZS 2890.1-2004 for user
      class 1A with allowance for vehicles to enter and leave the site in a forward gear and with a minimum
      head clearance (headroom) at any point of 2.2m.

21.   All carparking shall be kept, maintained and line-marked in a condition fit for use.

22.   The surface of the carparking and manoeuvring area shall be sealed in accordance with Council’s
      Planning Scheme Policy PSP05 – Engineering Design Standards – Roads, Drainage and Earthworks.
Frontage Works
23.   Footpath improvements such as topsoiling, grassing, and tree planting are required to the Orealla
      Crescent frontage of the site in accordance with Planning Scheme Policy PSP03 Landscaping Plants &
      Guidelines. Grass shall be couch, free of weeds.

24.   All redundant vehicular crossings to the site and shall be removed and replaced by kerb & channel,
      footpath paving and landscaping such as trees and grasses in accordance with Council’s Standard
      specifications prior to commencement of the use permitted by this permit.
Roof Water & Stormwater Drainage
25.   Roof runoff from the roofed areas shall be directed to a rainwater storage system or tank for each unit
      (minimum storage 3000 litres per unit) that is installed to ensure water from the tank is used for external
      uses (such as watering gardens, irrigation, ornamental ponds, water features, topping-up swimming pools,
      outdoor cleaning, etc) and for the washing machine cold water taps on the ground floor. All rainwater
      tanks are to be designed and installed in accordance with the Queensland Development Code (QDC),
      Part 25 – Rainwater Tanks, and shall be part of the plumbing application in conjunction with the building
      approval. The location and capacity of the tanks shall be clearly shown on the plans submitted for
      Building Works approval and any overflow shall be directed to the stormwater drainage system.

26.   All stormwater drainage (including roof water overflow from the rainwater storage system) shall be
      collected and discharged so there is no net increase in stormwater runoff from the site. Stormwater
      drainage permitted to drain from the site shall be discharged to Council’s kerb & channel street drainage
      system in Orealla Crescent. Kerb adaptors shall be used in the kerb.
      The maximum discharge of stormwater drainage allowable to Council’s kerb & channel street drainage
      system at any one location is 25 litres/second
27.   All site stormwater drainage shall be by means of a gravity system.



AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@d8084014\@[email protected]

Used in these records

About this file

File size
225 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED Decision Notice - 010.2007.00001457.001 [As Published].pdf · 225 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.