SUPERSEDED Decision Notice - 010.2007.00001457.001 [As Published] · 132007.1457
NOOSA COUNCIL IDAS Development Application Decision Notice 6 of 13
Erosion and Sediment Control
37. Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site
control measures such as silt fencing, controlled gravel access to the site and controlled disposal of
waste, will be necessary.
In this regard the methods of controlling erosion and sediment shall be clearly shown on the plans
submitted for Building Works approval.
Contributions Towards Council Infrastructure
38. Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or upgrading
various infrastructure at the rates applicable at the time of payment. An estimate only of the contribution
amounts under the current Council policies and requirements is outlined in the table below:
Contribution Required For: Amount:
PSP12 – Public Open Space Contributions (Park) $1,600
PSP16 – Sewerage Headworks Contributions $748
PSP17 – Water Supply Headworks Contributions $2,155
PSP20 – Pathway Trunk Network Contributions $360
TOTAL Contribution Amount = $ 4,863
Please note, that these amounts are all subject to variations in the Consumer Price Index, All Groups Brisbane
from March 2007 until the date of payment.
All contributions must be paid prior to the commencement of the use.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the contributions
not be paid at the due time, Council shall call upon the trading bank guarantee in full.
Processing of bonds for security where specific Council approval has been given for the bonding of
contributions will incur an administration fee in accordance with Council’s Land Development Commercial
& Regulatory Fees at the time of lodgement.
In the event that the Development Permit for Material Change of Use of Premises lapses or is cancelled,
the trading bank guarantee will be returned.
General
39. The design of the stormwater disposal system, carparking and access shall be in accordance with
Council’s Planning Scheme Policy PSP05 – Engineering Design Standards – Roads, Drainage and
Earthworks. To avoid conflict with underground pipes or services, all existing and proposed services
required by the development shall be shown on the building plans.
40. Any damage caused to any public utility during the course of construction shall be repaired to Council’s
standards and at no cost to Council.
41. Any alteration of any public utility or other facilities necessitated by the development of the land or
associated construction works external to the site shall be at no cost to Council.
42. The transportation of all materials to and from the site shall be undertaken in a manner such that no
particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall
be covered to prevent materials including dust being windblown from the vehicle.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@d8084014\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Decision Notice - 010.2007.00001457.001 [As Published]Related documentApplication case desk ↗
0015A86E.001.pdfRelated documentPublic source context ↗
About this file
- File size
- 225 KB (small file)
- File type
No other editions are linked here.