Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Appendix F - Noosa Council Code Responses · MCU21/0146

of 82

Text shows just the words. Original shows the document exactly as it was published.

9.4.6 SUSTAINABLE BUILDING DESIGN CODE
Table 9.4.6.3 Criteria for assessable development

 Performance Outcomes               Acceptable Outcomes                            Response

 Energy efficiency

 PO1                                No acceptable outcome provided                 Complies with PO1.

 Development minimises energy                                                      The development has been
 consumption and the production                                                    designed to maximise access to
 of greenhouse gas emissions.                                                      natural ventilation, cooling and
                                                                                   sunlight, to minimise reliance on
                                                                                   mechanical heating and cooling
                                                                                   and energy consumption.



 Water efficiency and stormwater management

 PO2                                AO2.1                                          Complies with PO2.

 Development maximises water        If for accommodation activities, a             Appropriate conditions can be
 efficiency on site by              minimum 3,000 litres of rain water             included within an approval to
 incorporating rainwater            storage is provided per dwelling               ensure rainwater collection
 collection and reuse measures      and reused for non-potable                     measures are for the
 for non-potable purposes such      purposes and incorporated into a               development, which can be
 as irrigation.                     stormwater management plan for                 determined at detailed design
                                    the development.                               phase.

                                    AO2.2                                          Complies with PO2.

                                    With the exception of                          Appropriate conditions can be
                                    accommodation activities, rain                 included within an approval to
                                    water storage sufficient for the               ensure rainwater collection
                                    intended use is captured and used              measures are for the
                                    on-site for non-potable purposes               development, which can be
                                    and incorporated into a stormwater             determined at detailed design
                                    management plan for the                        phase.
                                    development.

                                    Editor’s note—The Queensland
                                    Development Code includes provisions for
                                    the installation of rain water tanks and the
                                    reuse of stormwater.


 PO3                                AO3.1                                          Complies with PO3.

 Development reduces                                                               The development reduces
 stormwater run-off by minimising                                                  stormwater runoff by minimising




Sustainable Building Design Code_Complete

Used in these records

About this file

File size
674 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix F - Noosa Council Code Responses.pdf · 674 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.