                                          achieves the design objectives listed in TABLE A:
Editor's note— WATER                      CONSTRUCTION PHASE – STORMWATER MANAGEMENT
CONTAMINANTS ARE                          DESIGN OBJECTIVES OF THE STATE PLANNING POLICY
PRESCRIBED IN THE                         (APPENDIX 2).
ENVIRONMENTAL PROTECTION
ACT 1994.                                 Editor’s note— PSP6 Engineering Design Standards - ROADS,
                                          DRAINAGE AND EARTHWORKS PROVIDES GUIDANCE
                                          ON REQUIREMENTS FOR PREPARING AN EROSION
                                          MANAGEMENT PLAN.

                                          AO14.2
                                          Construction works are designed and managed to restrict the
                                          extent of clearing and soil exposure to the minimum necessary
                                          for access, and safe construction at any one time.

                                          AO14.3
                                          For BUILDINGS:
                                                   1. upstream runoff is diverted around the
                                                      construction site;
                                                   2. sediment barriers are provided downslope of
                                                      disturbed areas to prevent sediment washing into
                                                      gutters, drains
                                                      and WATERWAYS , WETLANDS or DRAINAGE
                                                      LINES either on or off the site; and
                                                   3. temporary or permanent downpipes are
                                                      connected to the stormwater system before laying
                                                      the roof; or
                                                   4. localised erosion is avoided by directing flow from
                                                      downpipes over non-erosive areas.

                                          AO14.4
                                          Chemical flocculants used as part of an erosion and sediment
                                          control plan do not harm the environmental values within
                                          receiving waters.

                                          AO14.5
                                          Appropriately sized litter containment areas, with provision for
                                          sorting recyclables are provided for the type of litter expected to
                                          be generated onsite.
Wastewater Management
PO15                                      AO15                                                                  The Development will
Development does not discharge            Wastewater (non-sewage) generated from the                            Comply
wastewater unless it can be               development is collected and contained on-site, and is:
demonstrated to not compromise
environmental values of waters                      1.   lawfully disposed to sewer; or
and water quality objectives.                       2.   transferred off-site for treatment/disposal to an
                                                         appropriately licenced facility;
Editor’s Note—                                      3.   reused on-site in a closed-cycle irrigation scheme,
                                                         industrial processes, washing or cleaning or other
ENVIRONMENTAL VALUES OF
                                                         purpose; or
WATERS AND WATER                                    4.   treated to meet the drinking water supply
QUALITY OBJECTIVES ARE                                   environmental values prior to release.
PRESCRIBED IN SCHEDULE 1
OF THE ENVIRONMENTAL                      Editor’s Note—THE PLUMBING AND DRAINAGE ACT
PROTECTION (WATER)                        2003 SETS OUT REQUIREMENTS FOR
POLICY 2009.                              WASTEWATER MANAGEMENT.
PO16                                      AO16                                                                  Not Applicable
On-site effluent treatment and disposal   An onsite effluent system and disposal area is:
systems are designed, constructed
and managed to not compromise the                   1.   not located on a slope greater than 1 in (10%);
environmental values of waters and                  2.   not located at or below the 1% annual
water quality objectives.                                exceedance probability (AEP flood event);
                                                    3.   not located within a riparian buffer area mapped
                                                         on a Biodiversity, Waterways and Wetlands
                                                         Overlay Map; and



         NMA_ECAR_19323
Log in to download the original file

Engineering Code Assessment Report.pdf · 6.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.