Original source · versioned page text
Engineering Code Assessment Report
Original PDF page 40, section 1. The text section number identifies this passage in the reader.
PAPER SIZE A3 Map has been designed to be reproduced in colour
All underground cables shall be treated as being energised. Where a cable is located that is not represented
on the ENERGEX EnerG!/Se DBYD map, then ENERGEX shall be contacted immediately.
9200 9300
0700
24
742272
2]
0600
708Q500m N
14
22
9400
For Emergency Situations
Please call 13 19 62
9500
————} 0700
———} 0600
———} 0500
599200m E 9300
This output provides details of the ENERGEX elactrical network. As variations may exist no responsibility is incurred by ENERGEX for the
accuracy or completeness of the information provided. Exact positions of cables and electrical connectivity should be confirmed on site.
9400
9500
UNCONTROLLED COPY
DBYD
Date: 12 Oct 20 Time: 14.32.41
Requested By: DBYD
SCALE 1:1000
20 ° 20m
Enquiry No: 102734736
STRIP No: 1
—- Cable Voltage
(A Ground Transformer Less Than 33k
Cubicle Transformer Cable Voltage
33kV or Higher
f= Ring Main Unit
@) Metering Unit © Direer-Lay
Wo Link Pillar QO Conduit
[Service Pillar Malti: Section
Junction Pillar Duct
’ Trench
[| Pit —
ma Cable Joint || Cable Tray
b> Cable Termination LE] Tunnel
4 Cable Marker
Street Light Pole
li Earth
Planned Work
labelled by Work Order
INDEX TO SHEETS
LOCALITY DIAGRAM
PAPER SIZE A3 Map has been designed to be reproduced in colour
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.