    NOOSA COUNCIL
    APPROVED PLAN           AS-CONSTRUCTED ESSENCE OF PEREGIAN BEACH
OPW19/0266.03 27 OCT 2023
                                 215 DAVID LOW WAY, PEREGIAN BEACH                                                                                                                                                       ANDREW GOLD LANDSCAPE ARCHITECTURE
                                                                                                                                                                                                                         PO BOX 5220
                                                                                                                                                                                                                         MT GRAVATT EAST
                                                                                                                                                                                                                         QLD 4122




                                  Landscape Design Development Package
                                                                                                                                                                                                                         T 07 3420 0006
                                                                                                                                                                                                                         M 0405 389 243
                                                                                                                                                                                                                         E [email protected]




                                                                  Prepared                                                                                                                                GENERAL NOTES:

                                                                                                                                                                                                            1.     Read all landscape drawings and specifications and clarify
                                                                                                                                                                                                                   any discrepancies with the Project Manager prior to
                                                                                                                                                                                                                   undertaking works.
                                                 By                                       For                                                                                                                 2.   All work practices shall comply with the Occupational
                                                                                                                                                                                                                   Health and Safety Act 2004 and all relevant regulations and
                                                                                                                                                                                                                   codes of practice.

                                                                                                                                                                                                              3.   The location of the site compound and area for stockpiling
                                                                                                                                                                                                                   of materials is to be agreed on site and authorized by the
                                                                                                                                                                                                                   Project Manager prior to the commencement of works.

                                                                                                                                                                                                              4.   The site is to be secured for the full duration of works at the
                                                                                                                                                                                                                   Contractor’s expense.

                                                                                                                                                                                                              5.     The Contractors must check all dimensions and levels on
                                                                                                                                                                                                                     site. The AS-CONSTRUCTED works must match into
                                                                                                                                                                                                              existing site         levels where they interface with existing
                                                                                                                                                                                                              conditions.

                                                                                                                                                                                                              6.   The Contractor is to locate and confirm all existing services
                                                                                                                                                                                                                   and service covers, whether shown on the drawing or not,
                                                                                                                                                                                                                   prior to the commencement of works. The Contractor shall
                                                                                                                                                                                                                   contact Dial Before You Dig to obtain any relevant service
                                                                                                                                                                                                                   information prior to the commencement of works.

                                                                                                                                                                                                              7.   The Contractor is responsible for retaining, protecting and
                                                                                                                                                                                                                   repairing any damage to all existing services, service
                                                                                                                                                                                                                   covers etc. The Contractor shall advise the Project
                                                                                                                                                                                                                   Manager of any required alternations.

                                                                                                                                                                                                              8.   Confirm all pit levels and resolve any discrepancies with the
                                                                                                                                                                                                                   Project Manager prior to undertaking the works.

                                                                                                                                                                                                              9.   All levels are to be approved on site by the Project Manager
                                                                                                                                                                                                                   at setout prior to undertaking the works.

                                                                                                                                                                                                            10.    All surface levels nominated on the plans are finished
                                                                                                                                                                                                                   surface levels. The Contractor must include excavation,
                            SITE LOCATION PLAN                               SCHEDULES                                                                                                                             trimming and grading to appropriate sub-grade levels to
                                                                                                                                                                                                                   achieve specified depth and adequate drainage of softfall
                                                                                                                                                                                                                   mulch.
                                                                             DRAWING SCHEDULE
                                                                                                                                                                                                            11.    Sub-grade in softfall mulch zones to have minimum of 1:50
                                                                             DWG NO          DRAWING TITLE                                             ISSUE                                                       fall towards agricultural drains. Typically provide falls
                                                                                                                                                                                                                   across hard surfaces towards gardens beds.
                                                  David Low Way
                                                                             0               COVER SHEET                                                 O
                                                                                                                                                                                                                   Minimum fall in direction of travel – 1:90
                                                                             1               LANDSCAPE WORKS NOTES                                       O                                                         Maximum fall in direction of travel – 1:20
                                                                             2a              PLANTING SCHEDULE                                           O                                                         Maximum crossfall – 1:40
                                                                             2b              PLANTING IMAGES                                             O
                                                                             2c              PLANTING IMAGES                                             O
                                                                             3               OVERALL LANDSCAPE PLAN                                      O
                                                                             4               AS-CONSTRUCTED FENCES PLAN                                  O
                                                                             5               EXISTING TREES PLAN                                         O
                                                                             6               SURFACE FINISHES PLAN 1                                     O
                                                                             7               SURFACE FINISHES PLAN 2                                     O
                                                                             8               SURFACE FINISHES PLAN 3                                     O                                                O           12/10/23         AS-CONSTRUCTED
                                                                             9               SURFACE FINISHES PLAN 4                                     O                                                N           20/06/23         AS-CONSTRUCTED
                                                                             10              SURFACE FINISHES PLAN 5                                     O                                                M           19/06/23         REVISIONS AS REQUIRED
                                                                                                                                                                                                          L           02/06/23         REVISIONS AS REQUIRED
                                                                             11              PLANTING PLAN 1                                             O                                                K           12/05/23         LOT 9 LILY POOL DETAILS
                                                                             12              PLANTING PLAN 2                                             O                                                J           24/02/23         REVISIONS AS REQUIRED
                                                                             13              PLANTING PLAN 3                                             O                                                I           10/02/23         UPDATED ARCHITECTURAL DWGS
                                                                                                                                                                                                          H           19/01/23         AMENDMENTS AS REQUIRED
                                                                             14              PLANTING PLAN 4                                             O                                                G           02/09/22         UPDATED ARCHITECTURAL DWGS
                                                                             15              PLANTING PLAN 5                                             O                                                F           18/02/20         IN RESPONSE TO NC IR
                                                                             16              PLANTING PLAN 5                                             O                                                E           12/07/19         UPDATED ISSUE FOR TENDER
                                                                                                                                                                                                          D           10/07/19         COORDINATION ISSUE
                                                                             17              DETAILS                                                     O                                                C           28/06/19         FOR TENDER
                                                                                                                                                                                                          B           28/06/19         FOR REVIEW
                                                                                                                                                                                                          A           26/06/19         FOR REVIEW AND COORDINATION

                                                                                                                                                                                                          ISSUE       DATE             REASON

                                                                                                                                                                                                          THIS DRAWING HAS BEEN PREPARED WITH ALL CARE FROM BASE INFORMATION AVAILABLE
                                                                             DRAWING REFERENCE SCHEDULE                                                                                                   AT THE TIME OF PREPARATION. ALL EXISTING AND RETAINED ELEMENTS ARE SHOWN
                                                                                                                                                                                                          INDICATIVELY ONLY. THE LOCATION OF THESE ELEMENTS ARE BASED FROM SURVEY
                                                                                                                                                                                                          INFORMATION. ALL PLANS AND DETAILS ARE TO BE READ IN CONJUNCTION WITH ALL
                                                                             CONSULTANT                        TYPE                    DRAWING FILE NAME                                  DATE RECEIVED   RELEVANT CONSULTANT'S DOCUMENTATION PACKAGES, INCLUDING (BUT NOT LIMITED TO)
                                                                                                                                                                                                          ARCHITECTURAL, CIVIL, STRUCTURAL, HYDRAULIC, ELECTRICAL, LIGHTING AND SIGNAGE
                                                                                                                                                                                                          DOCUMENTATION. ALL ABOVE AND BELOW GROUND SERVICE LOCATIONS ARE SHOWN
                                                                                                                                                                                                          INDICATIVELY. REFER TO THE RELEVANT ENGINEERS DRAWINGS AS REQUIRED. ALL
                                                                                                                                                                                                          DIMENSIONS ARE TO BE VERIFIED ON SITE.
                                                                             MORGAN CONSULTING ENGINEERS       CIVIL DRAWING           19-06-25 - 18164 - MCE CIVIL BASE.DWG              25/06/19
                                                                             RED DOOR ARCHITECTURE             ARCHITECTURAL DRAWING   180082-WD-A-520-1 - LOT 9 - LILY POOL DETAILS      11/05/23
                                                                                                                                       180082-WD-B-100-33 - GROUND FLOOR PLAN.DWG         10/02/23
                                                                                                                                       WD-A-100-SITE-PLAN---GROUND-FLOOR-DETAIL-REV.15    25/08/22
                                                                                                                                       180082-WD-B-100-5 - GROUND FLOOR PLAN.DWG          11/07/19
                                                                                                                                       180082-WD-C-100-1 - FLOOR PLANS (KAMALA).DWG       03/06/19
                                                                                                                                       180082-WD-D-100-1 - FLOOR PLANS (LILY).DWG
                                                                                                                                       180082-WD-E-100-1 - FLOOR PLANS (MARRAM).DWG                       ESSENCE OF PEREGIAN BEACH
                                                                                                                                       180082-WD-F-100-1 - FLOOR PLANS (SALTBUSH 1).DWG
                                                                                                                                       180082-WD-G-100-1 - FLOOR PLANS (SALTBUSH 2).DWG
                                                                                                                                                                                                          215 DAVID LOW WAY, PEREGIAN BEACH
                                                                                                                                       180082-WD-H-100-1 - FLOOR PLANS (WALLUM).DWG
                                                                                                                                                                                                          COVER SHEET

                                                                                                                                                                                                          JOB No.        SHEET No.         ISSUE      DRAWN BY          CHECKED BY
                                                                                                                                                                                                          19.021         0                 O          CP/AA/PD AG/NC

                                                                                                                                                                                                                   AS-CONSTRUCTED

Used in these records

About this file

File size
63.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Compiled Approved Plans OPW19.0266.03.pdf · 63.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.